Is There A Pattern In The Performance Of Train Operating Companies?
I don’t care about the politics of rail nationalisation, as I just want my train to be on time and be safe, clean and comfortable.
I think this article from Rail Technology Magazine is showing a pattern of good performance.
If you read the article, it looks like two groups of train operating companies (TOCs) are doing better.
Locally controlled TOCs like London Overground, Merseyrail, ScotRail and TfL Rail, all seem to be doing well.
Two other TOCs that have a close relationship with their railway lines; C2C and Chiltern are also at the top of the pile.
I do wonder that as these two types of companies give passengers a quick and easy and often political way to complain, that they know if they muck-up they’ll be deep in e-mails, phone calls and letters, if they don’t perform.
I think this shows that we should increase areas of the country, where there are more arrangements of these types.
For instance, should short distance metro services in areas like Birmingham, Bristol, Cardiff, Glasgow, London, Manchester, Leeds, Nottingham and Newcastle, be under more direct control from the local authorities.
And also, where the operator has a virtual monopoly of track use, as does First Great Western to Bristol and the South West and Abellio Greater Anglia does in East Anglia and North Essex, should there be a more direct relation between track and train companies.
My belief is that people on the ground, be they passengers or rail staff, see problems and opportunities that are best served by a strong degree of local control or lins to those, who are providing the infrastructure.
This is well illustrated by the performance of TfL Rail on the Shenfield Metro, since being under the control of TfL Rail. The article says this.
And despite its good performance, other TOCs were close seconds, with TfL Rail raising its PPM dramatically compared to the same period last year – up by 8.5% to 96.9%. TfL also reported significantly less cancellations and lateness, from 4.9% in period 5 last year to 1.5% this year.
Previously, this line and the service was managed by Abellio, who are headquartered in Norwich.
In some ways it’s probably more about having a good management and communications structure for the train operating company, the track on which the trains run and the stations to where the trains go.
I also feel that a lot of the smaller developments in the UK rail system are locally-based projects like the reopening of branch lines and the creation of new stations, are projects that are better managed through a devolved rather than a centralised structure.
Has Sir Peter Hendy Had An Effect At Network Rail?
Sir Peter Hendy joined Network Rail in July 2015.
Is it just a coincidence, but there seems to be a lot more progress on getting the infrastructure sorted over the last couple of months?
Two stations I am following; Lea Bridge and Ilkeston seem to have finally got started.
Sir Peter may not be responsible, but just because he’s there, companies and people have decided that doing something is better than freewheeling.
Not Much Going On At Oxford Station
Oxford station is being upgraded in two ways.
A New Southern Platform
According to this section on Further Expansion in Wikipedia, a new Southern platform is to be created on the Long Stay car park to the South of the station. This is said.
The new platform was to have been brought into use during 2011.
When I last looked this morning, we are now in 2015.
Project Evergreen 3
Chiltern Railways are implementing Project Evergreen 3 to bring services from Marylebone to Oxford. Wikipedia says that this is being done at Oxford station.
The scheme also includes two new platforms at Oxford station, to be built on the site of the disused parcels depot. The new platforms would initially be five carriages in length, but provision will be made for them to be extended southwards to eight carriages.
All this should be done by 2016. This article on Modern Railways gives more details about the proposed Chiltern service.
So when I arrived at Oxford station, I expected it to be a hive of activity. These are the pictures I took.
There isn’t even a man in an orange suit trying to look busy! Although the platforms were!
Perhaps this is how Oxford would like to welcome visitors? Hoping perhaps they might stay away!
I think one of the toughest jobs in the world must be a Project Manager in Network Rail. Passengers are rightly complaining that stations are cramped and need building or rebuilding and sometimes it’s impossible to get anything done for whatever reason. Then you have politicians on all sides complaining and saying it’s a total disgrace!
Hopefully Sir Peter Hendy and his new broom will go in to projects like Oxford station with all guns blazing and tell a few home truths.
I’m sure, if Oxford doesn’t want an updated station, then there are some nice projects in Birmingham, where the money would be appreciated.







