When I took the pictures, for the article about the redesign of that Hackney Wick station, two freight trains came through.
Is it just my feeling or are there more and longer freight trains on the North London Line?
The one that went west was particularly long. But at least it was electric hauled.
In all my searching for rail improvements in North and East London, I couldn’t find any plans for new freight routes to reduce the amount of freight traffic through the area.
The only positive thing is that the Gospel Oak to Barking Line is being electrified, which will mean that the trains will hopefully not be powered by noisy and smelly diesel locomotives.
So will we be seeing more freight trains going through in the middle of the night, as trains have to get past London on their way between. Felixstowe, Harwich, London Gateway and all the ports in the East to the West Coast Main Line and the Great Western?
The only partial solution is to electrify Felixstowe to Nuneaton via Peterborough and complete the East-West Rail Link to minimise traffic to and from Felixstowe going through London.
The only thing we can say about freight through North and East London, is that the problem will be get more and more difficult.
Imagine what would happen if the new Ultra Large Container Vessels started serving say Liverpool or Glasgow and then large numbers of containers were sent by rail through the Channel Tunnel to Europe. There have been plans to do this in the past as it saves time in getting goods from North America to Germany.
May 28, 2015
Posted by AnonW |
Transport/Travel | Freight, Hackney Wick Station, North London Line, Trains |
Leave a comment
Hackney Wick station is one with two long ramps up to the platforms, which are on an embankment. This is a Google Earth image of the current station.

Hackney Wick Station
Note the Class 378 train in the Eastbound platform and the very long ramps.
These pictures show the current station.
But improvements are in the offing.
This document on the Hackney Council web site announced the plans for a new station. It says this.
An £8.5 million project to upgrade Hackney Wick Station has been announced.
Improvements are set to include new routes to reduce journey times to iCITY and the Olympic Park, moving the station entrance to street level, a new and enlarged concourse, lifts for step free access and the creation of a north-south walkway for passengers and pedestrians through the railway embankment.
It certainly is a comprehensive rebuild. I clipped these images from this document.
This is the station entrance.

Hackney Wick Station Entrance
This is the view from the south side of the line.

Hackney Wick Station South Elevstion
This image shows the Hackney Wick Artwall, which is shown in one of the pictures I took.

Hackney Wick Artwall
In my view the overall station design sets a powerful precedent, as it puts a subway into a station on an embankment with lift towers on either side of the tracks.
There must be a few stations like this that could be given a similar treatment.
May 27, 2015
Posted by AnonW |
Transport/Travel | Hackney Wick Station, North London Line, Stations |
7 Comments
This piece started life as an investigation into a rail line connecting the North London and Lea Valley Lines at Stratford, but it ended up as more of an index to what is happening to trains around Stratford and up the Lea Valley.
If you travel on the North London Line from Hackney Wick station to Stratford station, you’ll see a rail line going off to the North side of the line under the Olympic Village.

High Meads Loop At Stratford Joins North London Line
If you travel up the Lea Valley Line, you’ll see the other end of the line.

High Meads Loop At Stratford Joins Lea Valley Line
This is the High Meads Loop and it is generally used to move freight trains. You can see it on this Google Earth image, as it curls round the western side of Stratford International station, starting from the triangular junction to the east of Hackney Wick station and the River Lea and eventually joining the Lea Valley Line between Stratford and the under-construction Lea Bridge station.

High Meads Loop
I walked around the area today starting from Stratford International DLR station and much of it is hidden under concrete in East Village.
What has always surprised me, is that this line doesn’t appear to have provision for a station, especially as it could connect to so many important places in the area.
But then it does seem to me that the design of the rail system in the area of the Olympic Park and Village didn’t put getting an efficient railway first. These questions must be answered.
1. Why was a fully-functional International station, built at Stratford International and has then never been used to run services to the Continent through the Channel Tunnel? This is answered partially in this section in Wikipedia about International services at the station. If Kent gets two stations at Ebbsfleet and Ashford International, then surely East London and Essex deserves one too!
2. Why too, is the link between the two Stratford stations, so much of an afterthought? Today, when I came back from my walk, there was the inevitable lost soul, who’d taken a train to Stratford International and needed to get a train to Romford. And his Narional Rail ticket wasn’t valid for the one-stop hop on the Docklands Light Railway. But this is East London and the Train Captain told him to ride Don’t get me wrong, I like the DLR, but surely for the Olympics we could have put a more spectacular or at least a better link between the two stations?
3. In some ways too, I often think that they used the high-speed service from St. Pancras to Stratford, just to give it something to do. For a start foreign day-trippers to the Olympics should have come straight into Stratford International on Eurostar. Why wasn’t this arranged?
4. I am pretty local to the Olympic Park and can get a train from Dalston Kingsland to Stratford. I went to the Olympic Park that way a couple of times, but to get home, the powers-that-be either sent you to Stratford International or West Ham. In one instance I walked to Clapton and got a bus home as everything was congested. The arrangements might have worked for getting to Central London, but they weren’t good for locals, who like me wanted to walk out of the Olympic Park and then probably get a bus home. One solution would have been to put more capacity on the North London Line, by extending the Class 378 trains to five cars, as is now being done. Why wasn’t this done on the North London Line in time for the Olympics? Especially, as the line has always been overcrowded compared to the East London Line.
5. Soon after the Olympics, I met a big cheese in the Docklands Light Railway on a train. He felt and I probably will agree with him, that the DLR overperformed in the Olympics and dear old Cinderella didn’t miss a beat. I suspect though that to many she has more than a touch of Minnie Mouse, but to East Londoners and knowledgeable visitors, she is the way to travel, where you get a grandstand view much of the time. So why wasn’t more use made of the DLR for the Olympics by designing it into the heart of the Olympic Park?
6. We also had the farce of if you went to the Olympics from St. Pancras, you had to go through the Eastfield shopping centre to get into the Olympic Park. Why? Was the Olympics about sport or shopping?
7. Look at this Google Earth image of the Eastfield shopping centre.

Eastfield
Notice how the DLR goes under the centre and emerges on the west side before curving round to get to the station at Stratford International. It has always puzzled me that no provision has been made for an extra station on this loop. It strikes me that the developers feel most shoppers will bring their cars or not buy anything heavy. I would use the centre more if it was easier to get home from say John Lewis with perhaps something weighing ten or twenty kilos. Why was this extension of the DLR designed to be never more than a timid link?
If I look at some of the rail designs of the last few years, I get the impression, that they are less timid and not designed to be easiest to construct. The London Overground in particular has been innovative in some of its infrastructure to design affordable and efficient railways. Look at the Clapham Kiss as just one example.
In any developments to improve Stratford, there is also a thundering herd of elephants in the room, which will probably have more effect on what happens than any politician.
And that is Crossrail!
What is planned now is only Phase 1 of Crossrail and future developments will give Crossrail a bigger share of London’s passengers and even more influence.
1. Crossrail has been designed to take slightly longer trains and with its massively long platforms, the capacity of the system is quite a bit bigger than what we’ll see when the line opens.
2. Crossrail can also take more trains through the core, so we’ll definitely see extra branches on the line. Ebbsfleet on HS1 is safeguarded and Tring on the West Coast Main Line is being seriously studied.
3. Crossrail lacks an easy and hopefully cross-platform interchange to high speed services to Europe and in the future to the North. An easy interchange to HS1 at St. Pancras and Stratford is impossible, but one at Ebbsfleet could be incorporated with the extension of Crossrail to the station.
So what do I think should be done to sort out the sins of the pre-Olympic rail system development in the Stratford area?
1. A Better Connection Between The Two Stratford Stations And To The Eastfield Shopping Centre.
Look at this Google Earth image of Stratford station.

Stratford Layout
The DLR branch between Stratford International and the core system passes underneath the rail lines, including Crossrail and the Overground , and the Central Line, at right angles.
The passenger connection between the DLR and the lines passing through above is not easy, although it is step-free. If you take the wrong tunnel from the rail lines, you end up on the wrong DLR platform.
As the two subways are one each side of the DLR lines, couldn’t something better be done to make this interchange easier? For a start how about a sign saying take these stairs from the through platform to get your DLR service to Stratford International?
I also think that there should have been a station on the DLR line underneath Eastfield. It would be interesting to know what the shopping centre thinks.
2. Will We Ever See International Services From The Station That Has The Word In Its Name?
If Crossrail extends to Ebbsfleet, this will take a big chunk out of High Speed passengers to Stratford and St. Pancras. If say you lived in East Kent and worked in the City or the West End of London, why would you not take a convenient service, High Speed or otherwise, to Ebbsfleet and then change to Crossrail for where you actually needed to go?
Stratford International also lacks an easy link to all of the other services at Stratford and especially to Crossrail, even if the DLR link is improved. But any cross-platform link is impossible!
Passengers will get increasingly fed up with second-rate stations, when they see some of the modern ones that work, like Reading and Kings Cross. St. Pancras may look spectacular, but it is A Fur Coat And No Knickers Station
So Stratford International, which I find an unwelcoming place, could become a massive white elephant, that had its brief moment of fame at the Olympics.
3. The Moans In North East London
Read the various Internet forums and web pages and some of the biggest complaints are about the poor transport links to and from places in North East London and the Lea Valley, like Walthamstow, Leyton and Tottenham.
Things are improving,
The transfer of the Lea Valley Lines to an operator who cares about passengers in London and the uprating of the Victoria Line later this year, can’t be anything but positive.
But more could be done!
4. A Shoreditch High Street Station On The Central Line?
After Crossrail has bedded in, will we finally see a connection between the Central Line and the East London Line at Shoreditch High Street? I think we will as because Crossrail is an effective by-pass for the Central Line from Stratford to Liverpool Street, the Central Line could probably be shut for several months under Shoreditch High Street, whilst the link is created without causing too much inconvenience to passengers, except for those using Bethnal Green. But even those would have the new Whitechapel Crossrail station a couple of bus stops away
5. Extending the DLR to Tottenham Hale
This was mooted a few years ago and a document called DLR Horizon 2020 talked about extending the system from Stratford International up alongside the Lea Valley Lines to Tottenham Hale station. This article on London Reconnections describes the proposal like this.
Extend the DLR from Stratford International to Tottenham Hale via the Lea Valley. The route would run alongside the current Lea Valley rail lines where possible and the line would serve the Olympic site and feature additional stops at Lea Bridge and Walthamstow Marshes.
It may be a worthy idea, but does it really make economic sense, when according to what you believe a lot of things may be happening in the area.
When the heavy rail expansion is sorted and the area between Tottenham and Walthamstow is developed as housing and a very large wetland and leisure area, the case for a Lea Valley Light Railway may be stronger.
6. Using The High Meads Loop For Passengers
Trains can use the High Meads Loop to pass across the northern side of Stratford Intergenerational station. This Google Earth image of the station, shows the lines passing round the North-Western corner.

Stratford International Station
Note also the Docklands Light Railway station on the northern side of the deep station box, virtually above the DLR logo.
I think with a will a station could be built on the High Meads Loop just to the north of the DLR station, which would allow trains to travel between the North London Line and the Lea Valley Line calling at a station close to the International station and possibly a station in the East Village.
But as with extending the DLR from Stratford International would it all be worthwhile?
Unless of course some developer wants to do a mega-development and pays for the trains and the infrastructure.
7. Conclusion
I think we should leave well enough alone and accept that Stratford International station is probably a shining white elephant.
In the meantime, we should make it easier to transfer between one station too many at Stratford.
The High Meads Loop is probably best left to sort out the freight that has to travel through the area until someone does the right thing and builds a proper freight line that avoids the North London and the Gospel Oak to Barking Lines.
May 26, 2015
Posted by AnonW |
Transport/Travel | Docklands Light Railway, Eastfield, Freight, Gospel Oak And Barking Line, High Meads Loop, London Overground, North London Line, Stratford International Station |
3 Comments
The latest proposal for Crossrail 2 says this about the routes north of Angel station.
Further work to reduce the overall cost of the scheme and to minimise environmental impacts during both construction and operation has resulted in a potential change to the proposal for Crossrail 2 in this area. Rather than the route splitting at Angel with one tunnel going via Dalston and the other via Hackney, a single route would continue as far as Stoke Newington or Clapton, at which point the line would split, with one branch towards Seven Sisters and New Southgate and the other towards Tottenham Hale and Hertford East.
So it looks like it’s either call at Dalston Junction or Hackney Central stations, but not both.
Before I discuss which of the two locations is served, I will make a few assumptions.
Crossrail is going to provide up to 24 two hundred metre long trains per hour, that can each carry up to 1,500 passengers between Whitechapel and Paddington as detailed here. Thameslink will also be using a frequency of 24 trains per hour.
So it is reasonable to assume that Crossrail 2 will have similar frequency and probably use similar trains to Crossrail, so there’ll be an awful lot of passengers on the line.
But they are proposing Crossrail 2 for the future not for 2014.
By that time the Overground will be running more trains and they will be at least five-car trains. Judging by the modular nature of the Class 378 trains, which have already gone from three to four and will be going to five coaches later this year, who’s to say what the length will be? The limiting factor is the length of platforms, but I think I read somewhere, that most stations could go to six. At those that couldn’t take six coaches, selective door opening could be used.
Station improvements will also increase the capacity of the system.
With the redevelopment of the Kingsland Shopping Centre and the various redevelopment between the two stations, I would hope that the walk between the two Dalston stations ; Junction and Kingsland, becomes a pleasant sheltered one past cafes and shops, rather than a precarious scramble up the side of a busy road on a crowded and exposed pavement. If the Dalston Kingsland station entrance was moved to the eastern side of the Kingsland Road, this would shorten the walk and mean that only one major road had to be crossed.
As the Lea Valley Lines will have been fully incorporated in the Overground by then, Hackney Central should have been combined with Hackney Downs to effectively be one station. I’ve believed for some time that the two stations should be made one, with a proper interchange to the buses. I suspect too, that the station improvements could be part of a large property development in the area, as could the improvements at Dalston.
So by the time Crossrail 2 is finished both Dalston Kingsland/Junction and Hackney Downs/Central could be two substantially developed stations with lots of apartments, shops, offices and leisure facilities, with the North London Line between them. At present there are eight trains per hour and an awful lot of buses between the two areas.
I think we can see, why the planners have virtually said that it’s an either..on between the two stations. Cutting out one station supposedly cuts a billion off the bill for the project.
So which will get built?
It’s very much a case of who pays the money gets the tune.
But I think as Hackney Central/Downs will be the better connected station, it might well get the vote.
But remember one of the rules of the planning of large and expensive projects. What gets delivered in the end is often very different to what was originally proposed. Look at the simple example from Crossrail, where the line was originally planned to run to Maidenhead, but was extended to Reading, in March 2014.
So what could happen to change the scope of Crossrail 2?
The Overground has a problem of not enough capacity, which is partly made worse by all the freight trains travelling along it. So will a radical solution be made to remove most of the freight trains away from the Overground? This problem is going to get worse as more ships call at London Gateway, so sending more freight trains on the North London and Gospel Oak to Barking Lines (GOB) will be increasing unpopular, with both TfL and residents. Although hopefully in a few years, the noisy Class 66 diesel locomotives, will have been replaced with quieter electric ones.
But one solution could be incorporated into the Overground that would make the one station in Hackney work better. And that would be to reinstate the Eastern Curve at Dalston Junction to enable trains to go between the East London Line and Stratford.
The more I think about it, to make a one station concept work, freight must be removed from the North London Line. Read what the London Gateway Wikipedia entry says about distribution, which says trains will go partly at night on the GOB.
Rail logistics partner DB Schenker Rail (UK) plan to run four intermodal trains per day (mainly overnight) via Barking and Gospel Oak to the West Coast Main Line.
What will the residents living by the GOB, think of the noise at night?
June 18, 2014
Posted by AnonW |
Transport/Travel | Class 66 Locomotive, Crossrail 2, Dalston, Freight, Gospel Oak And Barking Line, Hackney, London Overground, North London Line |
1 Comment