The Anonymous Widower

Shapps Supports Beeching Axe Reversals

The title of this post is the same as that of this article on Rail Magazine.

This is the introductory paragraph.

Secretary of State for Transport Grant Shapps says he supports the reopening of routes closed in the Beeching cuts of the 1960s.

In the article, which describes proceedings in the House of Commons, Grant Shapps, says he was very supportive of opening the Market Harborough Line.

Digging around the Internet, I found this article on the Harborough Mail, which is entitled Harborough Rail Group Says Plan To Reopen Historic Line Is A ‘Excellent Idea’.

This is the introductory paragraph.

Moves to reopen the historic Market Harborough-Northampton railway line are being backed by a local rail passengers’ chief.

The Market Harborough-Northampton Line was only finally closed in 1981.

  • It used to connect the two stations with a double-track railway.
  • It is about fourteen miles long.
  • It is now partly a heritage railway and a walking and cycling route called the Brampton Valley Way.

I have flown my virtual helicopter along the route and can make these observations.

  • There is space for a bay platform at Market Harborough station.
  • Once clear of Market Hrborough, the route appears to be across open countryside.
  • The connection to the Northampton Loop Line wouldn’t be too difficult.

The only problem, I can see is that the route into Market Harborough station could be tricky.

These are a few of my thoughts.

What Passenger Service Would Be Provided?

Consider.

  • The route could certainly handle an hourly shuttle, as does the nearby Marston Vale Line.
  • Northampton station currently has three trains per hour (tph) to and from London.
  • Timings between Northampton and Market Harborough stations would probably be around twenty minutes.
  • Fast services between Northampton and Euston take about an hour.
  • Four tph between Northampton and London would probably be desirable.

So could a fourth service to and from London, be extended to Market Harborough station? Or perhaps even Leicester, which already has a platform, where the trains could be turned back?

  • I estimate that with a ten minute turnround at Market Harborough, a three hour round trip would be possible and very convenient.
  • A single track between Northampton and Market Harborough station would be enough.
  • The fourteen miles between the two stations could be handled by a battery-electric train, as there will be electrification at both ends of the route.
  • Porterbrook are developing a battery-electric Class 350 train.

It looks to be a very sensible proposition.

This map clipped from Wikipedia, shows the rail line between Milton Keynes Central and Northampton stations.

It is planned to introduce, a service between Marylebone and Milton Keynes Central using the tracks of the East West Rail Link.

  • It could be run by East West Rail or Chiltern.
  • It might be an easier service to operate as trains wouldn’t need to be turned back at Milton Keynes Central station.
  • It might be a better financial option, if services were to be extended to Northampton and Market Harborough.

As the East West Rail Link is being built by a private company, do they have plans to create services between say Leicester and Oxford?

Could Freight Trains Use The  Northampton And Market Harborough Line?

Consider.

  • A large rail freight interchange is being developed close to East Midlands Airport.
  • The East West Rail Link will be a better route between Southampton Docks and the West Coast Main Line, than the current roundabout routes.
  • Multimodal trains need to travel between the East Midlands and Sheffield and Southampton Docks.
  • Stone trains need to travel between the North Midlands and West London.

If the  Northampton and Market Harborough Line were to be reopened, it would provide a convenient freight route between the Midland Main Line and the Great Western Main Line.

Would the The Northampton And Market Harborough Line Be Electrified?

Consider.

  • It joins the electrified Midland Main Line at Market Harborough station.
  • It joins the electrified Northampton Loop Line at Northampton station.
  • It is only fourteen miles long.
  • Most trains should be able to bridge use the line on battery power.
  • It will be a new well-surveyed railway, which is easier to electrify.

I suspect, whether the line is electrified will be more down to planning issues.

Would the The Northampton And Market Harborough Line Be Double Track?

The line was double-track when it closed and I think that only planning issues will stop it being reopened as a double track.

Is the Opening Of The Northampton And Market Harborough Line Being Driven By The East West Rail Link?

This is a paragraph from the Rail Magazine article.

Asked by Andrew Lewer (Con) at Transport Questions on October 24 whether he would elaborate on plans to open the proposed Market Harborough line as part of the Oxford to Cambridge expressway he said: “I understand that the reopening is at a formative stage, but I am very supportive of it. Indeed, I support the reopening of many of the smaller lines that were closed as a result of the Beeching cuts under a Labour Government, and I should like to see as many reopened as possible.”

Does that mean that The East West Rail Link is driving this project?

Conclusion

Reopening of the Northampton and Market Harborough Line  could be a nice little earner for the East West Rail Link.

  • Freight trains between Southampton Docks and the Midlands and Yorkshire.
  • Stone trains between the North Midlands and London.
  • Passenger trains between Marylebone and Market Harborough and/or Leicester.
  • Passenger trains between Oxford and/or Reading and Market Harborough and/or Leicester.

These sections could be electrified.

  • Basingstoke and Reading
  • Didcot Packway and Oxford
  • Oxford and Milton Keynes
  • Northampton and Market Harborough

Much of the abandoned Electric Spine would have been created.

 

 

October 29, 2019 Posted by | Transport | , , , , , , , , , | 2 Comments