The Anonymous Widower

Should We have Built It In The First Place?

One of the dramatic news stories on BBC television this morning, is the blowing up of the tower of Inverkip power station chimney in Scotland. Out of curiosity, I looked up the power station on Wikipedia and found an article, which showed how building the station seems to have been an enormous waste of money.  Here’s what they say on the use of the power station.

It was to be Scotland’s first oil-fired power station. However, the soaring price of oil as a result of the 1973 oil crisis meant that by the time construction was completed generation was uneconomical. It was never utilised commercially, with 1200 MW kept in reserve and the remaining capacity being used to satisfy peak demand. It was only used at peak capacity during the miners’ strike of 1984-85, when low coal supplies prompted operation. Generation ceased in January 1988 and although the plant was retained as a strategic reserve, it was never used as such. The plant was finally mothballed in the late 1990s, but was kept fully operational until 2006 when it was decommissioned.

No wonder our electricity bills are so expensive, with gold-plated elephants like this to support.

I suppose, at least a lot of people got a cheap thrill when they saw the chimney blown up.

July 29, 2013 - Posted by | News, World | , ,

No comments yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.