The Anonymous Widower

Successful Trial Means Tube On Track For 4G Coverage By 2019

The title of this post is the same as this article on Rail Technology Magazine. This is said.

The Tube network will see 4G connectivity arrive in 2019, TfL has confirmed, meaning mayor Sadiq Khan’s original ambitions will be able to go ahead.

The news comes following a successful trial of the technology on the Waterloo & City line, where 4G technology was tested in tunnels and stations along the line in the summer.

I wonder how long it will be before all trains, trams and buses have 4G connectivity.

In some ways, I think providing 4G connectivity outside stations, bus stops and other important places is more important.

Suppose you are stuck in an area with no signal and perhaps you have fallen over and seriously cut your leg and need help or just a lift home.

Wouldn’t it be so much better, if you could find somewhere, where you know you could summon assistance or a lift?

I have two questions.

  1. Will 4G connectivity be added to the Overground?
  2. Will 4G connectivity be switch on station-by-station and line-by-line or in one go in 2019?

In some posts about this, it is suggested that a driving force behind the connectivity, is that the emeergency services are moving to mobile phone technology. So if that is the case, then the answers to these questions must be in the affirmative!

November 27, 2017 - Posted by | Computing, Travel | , , , , ,

No comments yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s