Norwich-In-Ninety Is A Lot More Than Passengers Think!

But, I very much expect that Greater Anglia know what they are doing.

I came up to Norwich on the 1100 train, which was timed to get in at 1230. According to the driver, there were signalling problems at Manningtree, which meant we arrived in Norwich twenty-one minutes late.

I was going on to Cromer or Lowestoft. So by the time I’d had a cider and bought a ticket, I didn’t leave Norwich until 1345 for Cromer. But I did have time by the sea to take a few pictures and have a coffee and a gluten-free scone, before getting the return train to Norwich.

Back at Norwich, I had a choice of two trains.

  • The 1700 stopping at just Ipswich and Norwich
  • The 1703 stopping at Diss, Stowmarket, Ipswich and a few other places.

I was booked on the 1700, from where I’m writing this note on my phone.

These are some of my observations.

Operating Speed

I have just travelled between Norwich and Ipswich in thirty minutes, with Speedview on my phone reading within a couple of mph of 100 mph all the way from where we got to operating speed South of Norwich to where we slowed for Ipswich station.

Diss, Stowmarket and Nedham Market stations were passed at almost 100 mph

Ipswich to Colchester was at a slower 90 mph, but then from Marks Tey to just before Chelmsford, the train was back to around 100 mph.

Speeds between 70 and 90 mph were held from Chelmsford to Liverpool Street, which was reached at 1830 as scheduled.

Acceleration

I got the impression, that the acceleration of the train wasn’t up to the operating speed. Certainly, it didn’t seem to accelerate as fast as an InterCity 125,

But then we’re talking about a rather puny Class 90 locomotive with just 930 kW pulling eight Mark 3 coaches.

In an InterCity 125, there is nearly 1,400 kW to accelerate the same number of similar coaches to 125 mph.

But these are small numbers compared to a four-car Class 755 train running on electrical power, which according to Stadler’s data sheet is 2,600 kW, which is 86% more power than an InterCity 125.

As there are two power-bogies each must be good for 1,300 kW.

Typical four-car electric Flirts seem to have around 2-3,000 kW, according to various Stadler data sheets.

Flirts seem to be seriously powerful trains and I can understand why some Norwegian Flirts are capable of 125 mph running. This is said in Wikipedia about the Norwegian Flirts.

All trains have five cars. However, in contrast to previous five-car FLIRTs they will have a third powered bogie giving them a maximum power output of 4,500 kW (6,000 hp) and a top speed of 200 km/h (120 mph).

If that extract is saying that each bogie can provide up to 1,500 kW, then Class 745 trains with four bogies have 6,000 kW.

If they were Class 755 train-sized bogies, then Class 745 trains, then the trains have 5,200 kW.

For comparison, an eleven-car Class 390/1 train has 5,950 kW.

With these figures, I feel it is reasonable to assume, that Class 745 trains, will accelerate to operating speed faster than the current forty-year-old BR stock.

  • They appear to have a lot more power, than the current trains.
  • Their aluminium bodies probably mean they weigh less, than the steel-bodies of the current trains.
  • Their aerodynamics are probably more advanced.
  • They probably have sophisticated technology that stops wheel slip, controls the train in a smooth manner and assists the driver.
  • The rolling dynamics will be no worse than that of the current trains.

Some conclusions can be drawn about the current trains and their operation.

  • A Class 90 locomotive with only 930 kW has sufficient power to keep an eight-car train running at 100 mph. It looks like the figure  is around 1.2 kWh per car per mile.
  • They must be in top condition.
  • The drivers probably know the route like the back of their hand and can coax the required performance from their ageing charges.

BR’s forty-year-old design must still be seriously good and the trains get the TLC they need.

Passing Stations At 100 mph

Diss, Stowmarket, Needham Market, Marks Tey, Kelvedon, Hatfield Peverel and Ingatestone stations were all passed within a few mph of 100 mph, with Maningtree and Colchester stations passed at around 85-90 mph.

Obviously, this must be allowed and not having to slow means that the speed is not degraded.

The only station where there was a substantial slowing was Chelmsford, where the train slowed to about 60 mph.

The Current Norwich-in-Ninety Services

These are the current ninety minutes services between Liverpool Street and Norwich.

  • 0900 – Norwich to Liverpool Street
  • 1100 – Liverpool Street to Norwich
  • 1700 – Norwich to Liverpool Street
  • 1900 – Liverpool Street to Norwich

Only one train is needed that starts and finishes in Norwich, where it is stabled overnight.

Serving The Intermediate Stations

Both the 1100 train to Norwich and the 1700 to Liverpool Street only stop at Ipswich.

But leaving a couple of minutes behind was another Class 90 locomotive/Mark 3 coach set stopping at more stations.

  • Going North, the train takes nineteen minutes longer, with stops at Colchester, Manningtree, Ipswich and Diss.
  • Going South, this train takes ten minutes longer, with stops at Diss, Stowmarket, Ipswich, Colchester and Stratford.

I suspect that when the Bombardier Class 720 trains have been delivered, these might be used for the stopping trains.

How Many Trains Will Be Needed?

It appears that the slower trains are currently timetabled to take between 111 and 115 minutes.

If a round trip can be done in four hours, then two trains per hour (tph), will require eight Class 745 trains.

As there are ten trains on order, this means the following.

  • Eight trains will be used to run the two tph stopping service.
  • One train will be needed for the Norwich-in-Ninety service.

This leaves one train as a spare or in maintenance.

Cromer And Back In A Day

In the four-and-a-half hours, I was in Norwich, I was able to take a train to Cromer, take a few pictures, have a quick lunch and then return to Norwich.

This is possible using the slower trains, but the fast trains can give you another hour in Norwich.

Obviously, this hour will be available for many journeys and must surely open up many possibilities for frequent travellers on the route.

How Reliable Is The Norwich-in-Ninety Service?

There have been twenty services in the first week of the service..

  • Fourteen have been on-time or a couple of minutes early.
  • Five have been under ten minutes late.
  • One was late by more than ten minutes.

That last train was twenty-two minutes late and I was on it, on the first Wednesday of the service.

I shall update this table, until I get bored with it!

Can The Timetable Be Changed?

The way the timetable is set out is an interesting solution to trying to be all things to all passengers.

  • There is a basic two tph service, which stops between London and Norwich according to a simple pattern.
  • Four services per day, with two in each direction, are delayed by two or three minutes.
  • The original departure times are taken by a fast train, that only stops at Ipswich.
  • These four departure times, are arranged, so that the services can be handled by a single fast train shuttling between Liverpool Street and Norwich
  • The fast train starts in Norwich at 0900 in the morning and returns to Norwich and its depot at 2030. The train can then have a good service after a hard day’s work!

Obviously, Greater Anglia have all the passenger data, so they have probably laid out a fast timetable, that will reflect current passenger numbers.

But as time goes on, this timetable can be augmented.

At present, they are using their express trains for both the two tph and the fast services.

These will be changed to Class 745 trains during the remainder of this year.

The venerable Class 90 locomotives and their Mark 3 coaches have blazed the trail and made everybody’s dream of Norwich-in-Ninety a reality, but now it is up to Greater Anglia’s new trains to fully develop the timetable.

  • If they are successful in attracting passengers more services will do Norwich in ninety and Ipswich in sixty.
  • The back-up stopping service running behind the fast train could be run by a new Class 720 train, which have a similar 100 mph operating speed.
  • Several services per day, using Class 755 trains, will be running between Lowestoft and London and augmenting the fast service between London and Ipswich.

Interestingly, as I left Norwich for Cromer, there was a Class 321 Renatus at Norwich station in Platform 2 Checking with Real Time Trains, this other relic from British Rail, but refurbished to a modern standard for passengers and performance, formed the 1400 express to London and arrived on time after seven stops.

It looks to me that Greater Anglia have a creditable back-stop, if there should be any unforeseen problems with the new trains.

But it also shows that the stopping service that follows the Norwich-in-Ninety service can be run by a 100 mph electric multiple unit.

This would surely release Class 745 trains to run more fast services.

An Improved Ipswich And Norwich Service

Greater Anglia have said that there will be three tph between London and Norwich and that one may or will be run the new Class 720 trains.

The only section of the Great Eastern Main Line, that won’t have four tph will be between Ipswich and Norwich. So could we see a 100 mph local service between two rivals.

Yesterday’s Class 321 Renatus did Norwich to Ipswich in forty-one minutes.

  • The route is fully-electrified.
  • Class 720 or Class 321 Renatus trains could be used.
  • Trains would stop at Diss, Stowmarket and Needham Market stations.
  • The rail line is not busy North of Stowmarket.
  • The bottleneck of Trowse bridge South of Norwich is to be replaced.

Running four tph between Ipswich and Norwich would be a lot more affordable, than improving the capacity on the mainly single-carriageway A140.

Would Faster Running Be Possible North Of Ipswich?

There are two major problems on the Great Eastern Main Line to the North of Ipswich.

  • Trowse Bridge to the South of Norwich.
  • Haughley Junction, where the Cambridge and Norwich routes divide to the North of Stowmarket.

Both projects have been kicked into the long grass more times than most, but it does look, that these two bottlenecks could be fixed in the next few years.

I also observed the following between Ipswich and Norwich.

  • The line wasn’t busy North of Stowmarket.
  • The train had no difficulty maintaining 100 mph.
  • The quality of the overhead electrification gantries might suggest a need for replacement.
  • There are some level crossings, that have no place on a 100 mph main line.

Would it be advantageous to update the line, so that higher speeds were possible?

I suspect that both the Class 745 and Class 720 trains could handle perhaps 110 mph with modifications, that are proven or planned with similar trains.

Conclusion

I had an exhilarating ride yesterday and it is a foretaste for the greatest improvement in transport for East Anglia in my lifetime.

 

 

May 22, 2019 - Posted by | Transport, Uncategorized | , , , , , , , , , ,

3 Comments »

  1. Actually was told on Tuesday that the 755s are heavier than the current trains which is causing some concern about Bridges especially on the branch lines.

    Tim

    Comment by Tim Regester | May 23, 2019 | Reply

  2. “…according to Stadler’s data sheet is 2,600 kW,”
    This suggest there is only 2 powered bogies, which suggests each is 1300 kW,
    “If that extract is saying that each bogie provides 1,500 kW, then Class 745 trains with four bogies have 6,000 kW.”
    So if 4 are powered then 755’s are 5200 kW or if all 6 (on the 4 car version) 7800 kW !!! (Or 6500 kW on the 3 car version)…

    Comment by Daniel Altmann | May 23, 2019 | Reply

  3. I’m updating the post now!

    It would be very likely, that Class 755 trains, must be able to maintain 100 mph between Ipswich and London, to keep out of the way of 745s and 720s. As my train yesterday was at 100 mph from just past Colchester to just before Chelmsford, it would be a retrograde step if they couldn’t.

    Comment by AnonW | May 23, 2019 | Reply


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.