This document on the Government web site is entitled Access for All: 73 Stations Set To Benefit From Additional Funding.

Taff’s Well station is not on the list.

These pictures show the station and the current bridge,

Crossing the tracks on the current bridge, is no easier, than at Cathays and Treforest stations, both of which are going step-free.

This map is a schemastic of the South Wales Metro.

Twelve trains per hour (tph) will go through the station, when the South Wales Metro is fully developed.

Passenger numbers for 2017/2017 South between Pontypridd and Cathays are as follows.

  • Pontypridd – 864,000 – Step-free
  • Treforest – 752,000 – Going step-free by 2024
  • Treforest Estate – 84,000
  • Taff’s Well – 364,000
  • Radyr – 539,000 – Step-free
  • Llandaff – 483,000 – Step-free
  • Cathays – 946,000 – Going step-free by 2024

Taff’s Well is the second least-used station.

But a doubling of the train frequency in the next few years, will certainly increase passenger numbers.

One guy, I spoke to said, that the station wasn’t busy.

I have been sent a map of the proposed works and facilities for the South Wales Metro. This snippet shows Taff’s Well station.

Note.

  1. There’s a lot of work to be done in the area.
  2. Taff’s Well station is shown with a PRM-compliant bridge and step-free access from street to train. The current bridge is not PRM-compliant.
  3. The station is shown electrified.
  4. Short sections of line around the station are without electrification.

I feel that to meet their objectives, the bridge needs to be replaced.

Installing Step-Free Access

In Winner Announced In The Network Rail Footbridge Design Ideas Competition, I wrote how the competition was won by this bridge.

I feel that, when Network Rail fully understand their installation procedures and costs, that a bridge like this could be used to replace the current monstrosity.

It also appears that the wires at Taff’s Well station will not be electrified, so could a bridge be used to hold up the overhead wires, that will guide pantographs through the station?

This Google Map shows Taff’s Well station.

The station has the common problem, of those that use the station as a Park-and-Ride have to negotiate the bridge one way.

Does the possibility of coming back from Cardiff, with lots of shopping, encourage shoppers to drive down the valley?

Taff’s Well station illustrates one of the benefits of the winning bridge design.

It could be built at the Northern end of the station, without disrupting the existing trains or their passengers.

I feel that Taff’s Well station would be ideal for one of the new bridges, even if it is not installed for a few years.

Electrification Through Taff’s Well Station

It is planned that electrification will be continuous through the station., which probably means that a new bridge with all the right clearances is desireable.

South of the station, there are a series of modern road bridges, which should have been built to give sufficient clearance  for the 25 KVAC overhead electrification.

North of the station, there are two modern footbridges.

This is the one nearest the station.

And this is the more Northerly bridge.

It appears that discontinuous electrification will be used on both bridges to make sure all safety clearances are met.

In an ideal world, the second bridge should surely have lifts!

Conclusion

Obviously, as the plans develop, we’ll know more about what will happen at Taff’s Well station.

July 24, 2019 - Posted by | Transport | , , ,

1 Comment »

  1. The station is having platform modifications to allow access in and out of the depot. This means the Up line will have the south end of the platform removed and will be extended north.

    You are correct about not having lifts. The footbridge is being completely replaced and will be getting long ramps to be PRM-compliant. The overhead wires will not be an issue as the station will be Permanently Earthed like several other stations on the new Metro system.

    Comment by Michael Fox | July 25, 2019 | Reply


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.