The Bakerloo and Watford DC Lines to the North of Queen’s Park station annoy me.

There are two very different classes of trains.

Which are different sizes and ideally need different platform heights for step-free access between train and platform.

Often, you need to step up and down into the trains.

The pictures show a typical steps on Bakerloo Line and Class 710 trains.

They give a new meaning to Mind The Gap.

It would be so much easier, for passengers in wheelchairs or those pushing buggies or trailing heavy cases for there to be no step between train and platform.

I once remarked to a station guy, not in the first flush of youth, as he manhandled a ramp into place, that what he was doing must be the worst part of his job. He smiled and agreed.

Surely in this day and age, we can create a railway, where everything is as efficient as possible.

These are a few of my thoughts.

Could The Two Lines Be Run By A Unified Fleet Of Trains?

If the two lines were to be run using the same trains, this would give advantages.

  • All trains could be maintained together.
  • Platform-to-train access would be much easier to make step-free.
  • Staff would only deal with one type of train.
  • A certain amount of automatic train control could be used to increase frequencies.

Obviously, a National Rail-size train couldn’t use the Bakerloo Line tunnels, but a train built for the Underground could use the current Watford DC Line into Euston.

Siemens are designing a New Tube For London and this will be used on the Bakerloo Line.

I suspect, that they could design a train that would easily run into Euston.

Would An Underground Train Provide Enough Capacity Into Euston?

The current trains on both lines have the following capacity and length.

  • The 1972 Stock on the Bakerloo Line are 113 metres long and have a capacity of 851 passengers
  • The Class 710 trains on the Watford DC Line are 82 metres long and have a capacity of 678 passengers.

Now there’s a surprise! The smaller Underground trains hold more passengers.

This picture shows the spare platform length at Euston, after a Class 710 train has just arrived.

I don’t think capacity or platform length will be a problem!

What Would Be The Frequency Into Euston?

Consider.

  • The current Watford DC Line service into Euston uses a double-track line terminating in Platform 9 at Euston station.
  • The service frequency on this route, has recently been increased from three trains per hour (tph) to four tph.
  • The Overground is soon to start to run six tph on routes with a similar track layout.

I believe that a six tph service could be run between Euston and Watford Junction stations.

What Would Be The Frequency In The Bakerloo Line Tunnel To Elephant & Castle And Lewisham?

Note that I’m assuming an extended Bakerloo Line runs to Lewisham, although, it could run to Hayes station.

Dear Old Vicky (aka the Victoria Line) handles a train every hundred seconds or thirty-six tph.

I can’t see any reason, why all parts of the Watford Junction to Lewisham route can’t be designed to handle this frequency.

If six tph went to Euston, then this would mean the service South of Queen’s Park station would be as follows.

  • Up to thirty tph or a train every two minutes between Queen’s Park and Lewisham stations.
  • It would connect the National Rail stations of Paddington, Marylebone, Charing Cross, Waterloo, Elephant & Castle, New Cross Gate and Lewisham.
  • A high capacity pedestrian link to Crossrail at Paddington, will be ready to open with Crossrail.
  • Connections to the Central, Circle, District, Hammersmith & City, Metropolitan, Northern, Piccadilly and Victoria Lines of the Underground.
  • Oxford Circus would have a high-capacity cross-platform interchange between the Bakerloo and Victoria Lines, both running in excess of thirty tph.

It would be a much needed capacity upgrade to the Underground.

Would Stations On The Combined Line Be Made Step-Free?

The combined route will have a total of 34 existing stations and four new stations.

I suspect the new stations will be step-free.

Of the existing stations, the following are fully or partially step-free.

  • Watford Junction
  • Bushey
  • Carpenders Park
  • Harrow & Wealdstone
  • Wembley Central
  • Willesden Junction
  • Queen’s Park – Scheduled to be made step-free.
  • Paddington – Will be step-free, when Crossrail opens.

The Bakerloo Line must be one of the worst lines for step-free access on the London Underground.

But then it has some of the oldest and least-capable trains and has been neglected for decades.

The station most in need of step-free access is probably Oxford Circus, where the Bakerloo and Victoria Lines have a cross-platform step-free interchange.

I lay out ideas for this station in Thoughts On Step-Free Access At Oxford Circus Station.

Upgrading The Lines

I think that Transport for London have a unique opportunity with the upgrading of the Bakerloo Line to Extension From upgrade the line as a series of separate projects, phased to be delivered in a continuous stream, rather than as one big launch, which was tried and failed with Crossrail.

Extension From Elephant & Castle To Lewisham Or Hayes

This project can be built independently, just like the Battersea Power Station Extension of The Northern Line. I detailed the latest thinking on this extension in TfL Moots Bakerloo Line To Hayes.

  • It is the only project that needs substantial tunnelling.
  • It probably needs a depot to be relocated.
  • Lewisham station would need some rebuilding.
  • It would need more trains to be delivered before it opens.

It could even be the last project to be delivered, which would allow time for the trains.

January 23, 2020 - Posted by | Transport | , , ,

3 Comments »

  1. As a quick fix for disabled boarding–multi-height platforms, with a lowered section for tube trains protected by a short run of platform edge doors (one train door only), and maybe selective door lockout for the taller trains (or on-train signage and automatic announcements of the step down from the overground trains.

    Comment by MilesT | January 24, 2020 | Reply

  2. Just my observations as I do not know this area of London very well. As a London liver and worker I only really know E, S and SE well.
    Surely if Siemens are building a new train it will have to fit all the existing deep tube line platforms. To me it suggests that maybe the Bakerloo should only run from Queens Park to Lewisham/Hayes. These trains would still be able to access Stonebridge Park depot and Willesden TMD. Then maybe a lengthened Class 710 at 6tph would stop at all stations onwards from QP to Watford. All the platform heights could then be raised for this class of train to enable step free access. Although I did read somewhere that the Overgound would be booted out of Euston on completion of HS2, that would scupper this idea unless say the old Primrose Hill could be reopened (could it and Stratford take say a lengthened Class 710?).
    And on and on….Too many imponderables, glad I’m not a TfL planner.

    Comment by Dave | January 25, 2020 | Reply

    • There is one important factor, that should be taken into account. Londoners are world champions at ducking-and-diving and will use any interchange to try to save time. As an example, if I’m coming home from Marylebone to Dalston, I take the the Bakerloo to Willesden Junction and then get the North London Line to Dalston Kingsland, where I might get my supper or do a bit of shopping in the Marks by the station before walking home. The interchange at Willesden is well-used and is partly step-free, so the Bakerloo Line must continue to serve Willesden Junction. I and probably many others wouldn’t want to see a second change at Queen’s Park.

      The Primrose Hill route is not liked by those at Kilburn High Road and South Hampstead, as they would lose access to Euston.

      Comment by AnonW | January 25, 2020 | Reply


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.