In Encore Joins Highview To Co-Develop Liquid Air Energy Storage System In Vermont, I gave brief notes about a proposed Highview Power CRYOBattery in Vermont.

  • The system will supply 50 MW for eight hours.
  • The total capacity will be 400 MWh.

Other articles have suggested, that the system could be built on the site of a demolished coal-fired power station, which still has a good connection to the electricity grid.

In other words, I believe that a CRYOBattery can be considered to be a small 50 MW power station.

  • It could be charged by local excess renewable energy during the day.
  • It could be charged by excess renewal energy from the electricity grid during the night, when there can be large amounts of wind energy, that needs a home.
  • Intelligent control systems, would balance the output of the CRYOBattery to the needs of the electricity grid.

It would be used in very much the same way as gas-turbine power-stations are used in electricity grids all over the world.

The Braybrooke Feeder Station

The National Grid is providing a feeder station at Braybrooke to support the Midland Main Line electrification.

This page on the Harbough Rail Users site is entitled Electrification Substation Plan for Braybrooke.

It gives this description of the sub-station.

Electrification of part of the Midland Main Line has moved a tentative step closer with the plans being prepared by National Grid for a feeder substation at Braybrooke, just outside Market Harborough.  The location is where a high-voltage National Grid power-line crosses over the railway and the plan is for a substation and associated equipment plus an access road from the A6. The substation is due to be completed by October 2020 and is intended to feed the power supply for the Corby line pending electrification of the main line through Market Harborough.

This Google Map shows the rough area, where it will be located.

Note.

  1. The A6 crossing the Midland Main Line.
  2. The solar farm in the South-facing field, which has a 3MW capacity, according to the Eckland Lodge Business Park web site.
  3. Various planning documents say the transformers on the substation will be 400/25 kV units.
  4. This means that the power-line in the area must be a 400 kV.

Unfortunately, I can’t pick out the line of 400 kV pylons marching across the countryside. But they are rather large.

The pictures show a group of 400 kV pylons near Barking.

  • The Midland Main Line at Braybrooke certainly seems to be getting a solid supply of electricity.
  • It was originally planned, that the electrification would go all the way, but it was cut back to Kettering and Corby a couple of years ago.
  • But to power, the electrification to Corby, it is being extended all the way to Braybrooke, so that the electrification can act as a giant extension lead for the Corby Branch Line.

The page on the Harborough Rail Users Site says this.

The Braybrooke substation is still planned, however, and the DfT has advised that the bi-mode trains will be able to switch power mode at speed.  They would therefore be able to continue running electrically north from Kettering as far as Braybrooke before ‘pan down’

It would appear, that the end of the electrification will be at Braybrooke, but the sub-station seems to have enough power to extend the electrification further North if that is ever planned.

I also think, that is rather an efficient and affordable solution, with very little modification required to the existing electricity network.

But not all electricity feeds to railway electrification have a convenient 400 kV line at a handy site for installing all the needed transformers and other electrical gubbins.

How Much Power Will Needed To Be Supplied At Braybrooke?

This can probably be dismissed as the roughest or rough calculations, but the answer shows the order of magnitude of the power involved.

Consider.

  • Braybrooke must be sized for full electrification of the Midland Main Line.
  • Braybrooke will have to power trains North of Bedford.
  • If there is full electrification of the Midland Main Line, it will probably have to power trains as far North as East Midlands Parkway station, where there is a massive power station.
  • Trains between Bedford and Market Harborough take thirty minutes.
  • Trains between Bedford and Corby take around thirty minutes.
  • Four trains per hour (tph) run between Bedford and Market Harborough in both directions.
  • The system must be sized to handle two tph between Bedford and Corby in both directions.
  • The power output of each Class 360 train, that will be used on the Corby route is 1,550 kW, so a twelve-car set will need 4.65 MW.
  • I can’t find the power output of a Class 810 train, but an InterCity 125 with similar performance has 3.4 MW.
  • A Class 88 bi-mode locomotive has a power output of 4 MW when using the electrification.

I estimate that Braybrooke could have to support at least a dozen trains at busy times, each of which could need 4 MW.

Until someone gives me the correct figure, I reckon that Braybrooke has a capacity to supply 50 MW for trains on the Midland Main Line.

A Highview Power system as proposed for Vermont, would have enough power, but would need a lot more storage or perhaps local wind or solar farms, to give it a regular charging.

Riding Sunbeams

Riding Sunbeams are a company, who use solar power to provide the electricity for railway electrification.

I’ll let their video explain what they do.

It’s a company with an idea, that ticks a lot of boxes, but would it be able to provide enough power for a busy electrified main line? And what happens on a series of rainy or just plain dull days?

Highview Power

Could a Highview Power energy storage system be used?

  • To store electricity from local or grid electrical sources.
  • To power the local electrification.

If required, it could be topped up by affordable overnight electricity, that is generated by wind power.

The Highview Power system could also be sized to support the local electricity grid and local solar and wind farms.

Conclusion

I think that Riding Sunbeams and Highview Power should be talking to each other.

 

 

May 2, 2020 - Posted by | Energy, Energy Storage, Transport | , , , , , , ,

2 Comments »

  1. Just thinking that it would be useful when your posts mention a specific location, indeed a map, if you could include a wikipedia style “geohack” link (to lat long), from whence the reader could select relevant maps from services of their choice

    This is the one for Braybrooke (from wikipedia) https://tools.wmflabs.org/geohack/geohack.php?pagename=Braybrooke&params=52.44_N_0.88_W_region:GB_type:city(378)

    Comment by MilesT | May 2, 2020 | Reply

    • Try this. I’ve put the Google Map url in the post!

      Comment by AnonW | May 3, 2020 | Reply


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.