I Can’t Wait Until The Sixth Of November
This morning, I wanted to go between Moorgate and Romford stations.
Because the Elizabeth Line is not fully joined up, I wanted to avoid a long walk.
So I had decided, that the best way to go would be.
- Hammersmith and City Line from Moorgate to Mile End.
- Central Line from Mile End to Stratford.
- Elizabeth Line from Stratford to Romford.
Note that both interchanges are cross-platform ones, so it is certainly a route with the minimum of walking.
When I got to Moorgate station, it appeared that there were problems with the Hammersmith and City Line, so assuming that things would be OK from Whitechapel, I took the Lizzie Line one stop to try my luck from there.
But my luck was out and after waiting for about twenty minutes in a stationary District Line train for a lift to Mile End station, I gave up and returned to the Lizzie Line, where I took a train to Canary Wharf station.
I’d changed between the Lizzie and Jubilee Lines before and wrote about it in Changing Trains At Canary Wharf Station – 13th June 2022.
I had not been impressed, as I’d found it a long walk.
But this time, I followed a route between the Eastern ends of both stations, which goes past Waitrose in the shopping centre. Opposite Waitrose was this stall.
That looks good for a pit stop. Badiani 1932 appear to have realised that London has a chronic shortage of ice cream and have opened a number of shops.
Once on the Jubilee Line, I finally got to Stratford and walked to the Lizzie Line for Romford Station.
What Had Caused All The Delays?
It appeared there had been a power supply problem on the Hammersmith and City Line.
Conclusion
Once Crossrail is fully open, it will be a bypass around problems like today.
No comments yet.
Leave a Reply