To get to Knottingley and the consultation about Ferrybridge hydrogen-fired power station, I had to change trains at Wakefield Westgate station.

Note.

  1. It is an impressive station.
  2. It has been rebuilt since the turn of the century.
  3. It is fully step-free.
  4. Entrance is level from the square outside the station to the Southbound platform.
  5. There are toilets on the Southbound platform.
  6. There are six trains per hour (tph) between Wakefield Westgate and Leeds.

Certainty, in the time I was changing trains and waiting for my train to Knottingley, there were a lot of trains going to and from Leeds.

The timetables are changing on December 14, 2025 and the October 2025 Edition of Modern Railways gives this summary for Wakefield.

On Mondays-Saturdays, the CrossCountry train calling at Westgate at 18:17 will no longer stop at Wakefield. Northern will introduce an additional hourly fast train seven days a week between Leeds and Sheffield, and on Saturdays there will be extra later last trains between Sheffield and Westgate via Rotherham and Sheffield and Kirkgate via Barnsley.

With the development of the Leeds Metro, I can see more services being added on the route between Doncaster and Bradford via Wakefield Westgate and Leeds.

  • Bradford is getting a new through station.
  • From December 14, 2025, Sunday services to Bradford Forster Square will be increased for two to six each way per day.
  • It also looks like from December 14, 2025, the new Northern service between Leeds and Sheffield via Wakefield Westgate, will form a two trains per hour with the CrossCountry service.

It certainly looks like the train companies have been co-operating to create a high-class Trans-West Yorkshire service.

 