Sheffield Station – 14th October 2026
I went to Sheffield station and took these pictures.
Note.
- The tram electrification clearly shows, where the Sheffield Supertram runs above the railway.
- My Class 222 trains arrived in Platform 5 from London.
- A five-car Class 810 train is 120 metres long.
- Platform 8 is a 378 metre through platform.
- What is the purpose of the white iron beams over the track, in the pictures of Platform 8?
- The beams are fairly substantial
- Platform 7 is a 135 metre bay platform.
- There are also similar shorter beams over the bay Platform 7.
- The platforms are well-provided with lifts.
- In the past, I have used Platform 7 to take a train to Manchester Piccadilly station along the Hope Valley Line. This could be an ideal route for battery-electric trains, as it is scenic and only 42.1 miles long.
If these beams are to hold overhead electrification cables to charge battery-electric trains, then the bay Platform 7 could charge a single train and Platform 8 could charge a pair of trains.
I have some thoughts and questions.
Could Sheffield Station With A Charger In Platform 8, Return a Class 810 Battery-Electric Train To London?
In Electrification Project’s Major Milestone Delivered On Time And Under Budget, I had a section, which was entitled Battery-Electric Trains Between St. Pancras And Sheffield Stations, where I said this.
Real Time Trains reveal the following about current St. Pancras and Sheffield services, that are run by the new Class 810 trains.
- Trains switch between electric and diesel power at Kilby Bridge junction.
- Between Kilby Bridge junction and St. Pancras station, overhead electrication provides train power.
- Between Kilby Bridge junction and Sheffield station diesel generators provide train power.
- Kilby Bridge junction and Sheffield station are 71.4 miles apart.
This would mean.
- For a one-way journey a battery range of 71.4 miles would be needed.
- For a return journey a battery range of 142.8 miles would be needed.
- Leicester, Loughborough, East Midlands Parkway, Long Eaton, Derby and Chesterfield stations would be served on battery power.
I suspect charging could be installed if required at Sheffield station.
This charging would need to put enough electricity in the batteries to get back to Kilby Bridge junction.
It certainly looks like.
- Platform 7 is long enough to charge a five-car train.
- Platform 8 is long enough to charge a ten-car train.
I don’t think the world’s first battery-electric 125 mph battery-express train is far away.
Could Two Trains Be Charged At The Same Time?
I don’t see why not, if the electrification has enough capacity.
Could Rigid Overhead Conductor Rails As At St. Pancras Thameslink Station Be Used?
These pictures show those rails.
I don’t see why not.
How Long Will Trains Take Between London St. Pancras And Sheffield?
I asked Google AI, how long the current trains take and received this reply.
East Midlands Railway (EMR) trains between London St Pancras International and Sheffield Station take an average of 2 hours and 12 minutes to 2 hours and 15 minutes, with the fastest direct services completing the journey in 1 hour and 57 minutes to 2 hours 1 minute.
I suspect that for marketing reasons, all services will be a minute or so, less than two hours.
Will The Trains Be Five- Or Ten-Cars?
As it appears, that trains of both lengths can be charged at both ends of the route, East Midlands Trains can run the trains, so that they maximise the numbers of passengers.
But I suspect, it will be a two trains per hour, guaranteed two hour service between London St. Pancras and Sheffield.
Could Trains Between London St. Pancras And Sheffield Be Extended To Leeds?
Consider.
- According to Google AI, historically, there have been trains that have run between between London St. Pancras and Leeds via Sheffield and the Midland Main Line.
- Trains would use Platform 8 at Sheffield, as it is an electrified through platform.
- The route between Sheffield and Leeds would be something like Meadowhall, Rotherham Central, Swinton, Bolton-on-Dearne, Moorthorpe, Fitzwilliam, Westfield Westgate and Outwood.
- Trains could also charge their batteries at Leeds, if required.
- Sheffield and Leeds is only 39 miles
Note.
All the intermediate stations between Sheffield and Leeds, would get direct services to Chesterfield, Derby, Long Eaton, East Midlands Parkway, Loughborough, Leicester and London St. Pancras.
- Trains would not leave Sheffield until the batteries were full.
- As my pictures show that Sheffield will have two platforms capable of fully-charging trains for London St. Pancras, I suspect that Sheffield will still have two trains per hour to London St. Pancras.
- As Platform 8 at Sheffield can handle ten-car trains, five- and 10-car trains can be run between London St. Pancras and Leeds.
Could Manchester And Sheffield Trains Along The Hope Valley Be Run By Battery-Electric Trains?
Consider.
- The Hope Valley Line between Manchester Piccadilly and Sheffield is only 42.1 miles.
- The service is currently hourly.
- The Hope Valley Line has recently been upgraded.
- Could the upgrade allow two trains per hour?
- Some trains between Manchester Piccadilly and Sheffield already use Platform 7 in Sheffield station.
Note.
- The Hope Valley Line is a scenic route.
- The service would use Platform 7 at Sheffield station.
- All platforms at Manchester Piccadilly station are electrified, so could top up the battery-electric trains.
- A two trains per service would have a cross-platform interchange with London trains in Platform 8.
- I’m sure that Hitachi could create a battery-electric version of their Class 185 train.
- I also suspect that CAF would be able to provide a battery-electric version of their Class 332 train, that Northern uses.
I believe that travellers using the Hope Valley Line would welcome an improved service.
Could A Battery-Electric Train With A Range Of 70 Miles Run A London And Nottingham Service?
In Electrification Project’s Major Milestone Delivered On Time And Under Budget, I had a section, which was entitled Battery-Electric Trains Between St. Pancras And Nottingham Stations, where I said this.
Real Time Trains reveal the following about current St. Pancras and Nottingham services, that are run by the new Class 810 trains.
- Trains switch between electric and diesel power at Kilby Bridge junction.
- Between Kilby Bridge junction and St. Pancras station, overhead electrication provides train power.
- Between Kilby Bridge junction and Nottingham station diesel generators provide train power.
- Kilby Bridge junction and Nottingham station are 33.1 miles apart.
This would mean.
- For a one-way journey a battery range of 33.1 miles would be needed.
- For a return journey a battery range of 66.2 miles would be needed.
- Leicester, Loughborough, East Midlands Parkway and Beeston stations would be served on battery power.
I suspect charging could be installed if required at Nottingham station.
But would it be needed, as the battery range for for Sheffield is more than that needed for a return journey to Nottingham?
Did My InterCity225 From Leeds Arrive Like An Airliner In King’s Cross?
Consider.
- I took the 18:40 from Leeds to London King’s Cross today.
- The train was an British Rail-era InterCity 225 in superb condition.
- The train consisted of a Class 91 electric locomotive and seven Mark 4 coaches.
- The train was scheduled to stop at Wakefield Westgate, Doncaster, Grantham and Peterborough.
- The Southern section of the East Coast Main Line is fully digitally-signalled at least as far as Welwyn.
- I assume that means Welwyn North station, which is to the North of the Digswell Viaduct.
- According to Real Time Trains my train was on time, one minute fast, four minutes fast and two minutes fast at the four stops.
- South of Welwyn North station, the train is shown as either one or two minutes ahead of schedule.
- The train arrived in London King’s Cross a minute ahead of schedule at 20:52.
As a Graduate Control Engineer, I believe that from Welwyn North station, the signalling was being used to instruct the driver, what speed he needed to arrive in King’s Cross on time.
This resulted in the slight oscillations in the scheduled time, between Welwyn North station and London King’s Cross.
These are my further thoughts.
Just Like An Airliner
I have well over a thousand hours in command of light aircraft and I held an IMC rating, which is a UK-only qualification, so you can do limited flying on instruments.
As an example, I have done full instrument approaches at major airports like
Belfast Harbour, Dublin, Edinburgh, Hamburg, Leeds, Liverpool, Naples, Prestwick and Stansted, where you guide the plane in so that it is a certain height, at a particular distance from the runway.
Your instruments tell you the height to be at and the direction to fly using a device called an instrument landing system or ILS.
With trains, I suspect, digital signals just give the train or driver, a speed at which to travel.
I believe that if the train is instructed by the digital signals a higher percentage of trains will more likely arrive on time or perhaps up to a couple of minutes early.
The Newark Flat Crossing
I wrote about this notorious piece of track in The Newark Crossing.
My train today crossed the Newark Crossing, exactly on time.
- So was it being digitally-controlled through the crossing?
- Many trains on the East Coast Main Line cross the Newark Crossing within a couple of minutes of their scheduled time.
- For the system to work well trains crossing the East Coast Main Line must also be under control of the digital signalling or the drivers must adhere closely to their schedules.
I believe that full digital signalling will improve safety, where trains cross, join or leave a main line.
Crossing The Digswell Viaduct
This is a two-track section between Welwyn Garden City and Welwyn North stations.
- Various plans to make it four-track have been abandoned over the years, as it would cost billions of pounds.
- My train ran through the section two minutes ahead of schedule.
- Looking at trains on the section between Welwyn Garden City and Welwyn North stations, they seem to maintain the same difference from their scheduled time.
I believe that the digital signalling could be instructing the trains, so that scheduled times are maintained.
Conclusion
I believe as a Graduate Control Engineer, that applying full digital signalling to the UK’s railways, will have the following effects.
- Improved timekeeping.
- Increased safety.
- More capacity.
- It could save on the cost of new infrastructure, by avoiding the building of new track, bridges and flyovers.
- From my experience of installing control systems on industrial plant at Enfield Rolling Mills and ICI, many trains and locomotives can be fitted with add-on control systems. In fact, full digital signalling has already been applied to steam locomotives.
We should complete digital-signalling for the East Coast Main Line and then roll it out for other lines, in order of importance.
Do LNER Have Some Cunning Plans For The Serenzas?
Along with some others, I was surprised, when LNER ordered a fleet of new trains in 2023, to run alongside the Azumas, that it wasn’t some more Azumas.
I wrote about the order in First Tri-Mode Long Distance Trains For The East Coast Main Line.
Why Didn’t LNER Just Order More Azumas?
I asked Google AI, the question in the title of this section and received this reply.
When London North Eastern Railway (LNER) needed additional trains for the East Coast Main Line, they chose to order 10 new “tri-mode” (electric, diesel, and battery) trains from Spanish manufacturer CAF in November 2023 rather than buying more Hitachi Azumas.
Why LNER Didn’t Order More Azumas?
Desire for New Technology: LNER wanted cutting-edge “tri-mode” capability—incorporating battery technology alongside electric and diesel power—to reduce carbon emissions and future-proof the fleet. Hitachi’s corresponding tri-mode platform was centered in Italy, making CAF a more ready and accessible option with an established UK manufacturing platform in Newport, Wales.
Procurement and Pricing: Industry discussions and reports noted varying challenges with Hitachi regarding pricing and availability for small add-on batches, prompting a competitive procurement process where CAF ultimately won the contract to replace remaining older InterCity 225 sets.
Operational Resilience: The new CAF battery-hybrid trains provide unique operational flexibility for diversions on un-electrified routes (such as the Joint Line) that standard electric Azumas cannot traverse under their own power without external help.
These are my current thoughts on LNER’s plans for the Serenzas.
Will The Serenzas Run To Harrogate?
As the seven trains per day to Harrogate use diesel between Leeds and Harrogate, I suspect the new trains will take over Harrogate services and run silently on batteries North of Leeds, which is less than 40 miles out and back.
How will the lack of noise affect ridership? London Kings Cross and Harrogate will be an interesting test case, as it looks like from the in service date of the trains of 2028, that they could be one of the first battery-electric train services, run over a distance of over two hundred miles.
So it will be an interesting test route in several ways for the new Serenzas.
Could The Serenzas Go Further Than Harrogate?
This OpenRailwayMap shows the electrification in Yorkshire between Bradford, Harrogate, Leeds and York.
Note.
- Electrified lines are shown in red.
- Unelectrified lines are shown in black.
- Lines in the process of being electrified are shown in dotted red and black.
- The City of Bradford is in the South-West corner of the map.
- The electrification entering the city from the North goes to Bradford Forster Square station, where LNER services from London terminate.
- On the opposite side of the city centre is Bradford Interchange station, where Grand Central services from London terminate.
- North of Bradford is the electrified triangular junction at Shipley station
- Trains go West from Shipley junction to Skipton, where the electrification ends and the iconic Settle and Carlisle line to Carlisle and eventually Glasgow.
- Trains go North from Shipley junction on an electrified line to Ilkley station.
- Trains go East from Shipley junction on an electrified line to Leeds station.
- From the Leeds area an unelectrified line leads to the North and Harrogate station, which is marked by a blue arrow.
- The City of York is in the North-East corner of the map.
- A partially-electrified line leads from Leeds to York.
- The Leeds and York line is being fully-electrified so that electric trains can reach Neville Hill depot in Leeds.
- Harrogate and York are connected by an unelectrified line, that goes via Knaresborough.
Between Bradford, Harrogate, Leeds and York, there are a comprehensive layout of lines many of which are electrified.
Could The Serenzas Go On From Harrogate To York?
Consider.
- Leeds and York is only 38.8 miles via Harrogate, so I suspect that this is possible using battery power.
- Harrogate has seven trains per day (tpd) from London Kings Cross via Leeds, at a frequency of one train per two hours (tp2h).
- York has six tpd from London Kings Cross, at a frequency of one tp2h.
Could LNER be thinking of a train, that does a Grand Tour of Yorkshire from London Kings Cross?
- It could call at Stevenage, Newark Northgate, Doncaster, Wakefield Westgate, Leeds, Horsforth, Harrogate, Knaresborough, York, Doncaster, Retford and Peterborough.
- It is the sort of concept, that is made possible by using a tri-mode train, that can go anywhere, there’s a railway.
- Was an idea like this, thought up by CAF to sell trains?
It is certainly possible.
Could The Serenzas Go On From Bradford Forster Square To Glasgow?
Consider.
- Until 1974, there used to be a Thames-Clyde Express, which has this Wikipedia entry.
- The route was between London St. Pancras and Glasgow Central.
- Intermediate stops were Luton, Kettering, Leicester, Nottingham, Derby, Chesterfield, Sheffield, Wakefield, Leeds, Skipton, Settle, Carlisle, Dumfries and Kilmarnock.
- LNER gave up serving Glasgow in 2024.
- Currently, Leeds and Bradford have no direct train service to Glasgow.
- The Settle and Carlisle route is one of the most scenic railway lines in Europe, if not the world.
- Do any airlines fly Leeds/Bradford and Glasgow? No according to Google AI!
Remember, that the Rail Minister; Lord Hendy, is an Economic Geography graduate of Leeds University, so he must know something about Yorkshire and its people.
I believe a modern-day Thames-Clyde Express could be run, by extending a number of LNER’s London and Bradford Forster Square services.
- The route would be between London Kings Cross and Glasgow Central.
- Intermediate stops would be Stevenage, Newark Northgate, Doncaster, Wakefield Westgate, Leeds, Shipley, Bradford Forster Square, Skipton, Settle, Carlisle, Dumfries and Kilmarnock.
- The route is now substantially electrified.
- It would take on the airlines on the London and Glasgow route.
- Class 805 bi-mode trains have used the Settle and Carlisle.
This could become one of the great railway journeys of Europe.
East Midlands Railway To Leeds
This news story from the Department of Transport is entitled Yorkshire And The Humber To Benefit From £19.8 billion Transport Investment.
This is said about Leeds and Sheffield services.
The line between Sheffield and Leeds will be electrified and upgraded, giving passengers a choice of 3 to 4 fast trains an hour, instead of 1, with journey times of 40 minutes. A new mainline station for Rotherham will also be added to the route, which could give the town its first direct service to London since the 1980s, boosting capacity by 300%.
These are my thoughts.
A New Mainline Station For Rotherham
This page on Rotherham Business News, says this about the location of the Rotherham mainline station.
South Yorkshire Mayoral Combined Authority (SYMCA) and Rotherham Council have been developing a scheme to return mainline train services to the borough for the first time since the 1980s. A site at Parkgate is the frontrunner for a regeneration project described by experts as “a relatively straightforward scheme for delivery within three to four years.”
Various posts and comments on the Internet back the councils preference for a new station at Rotherham Parkgate.
- It would be at Rotherham Parkgate shopping centre.
- It connects to the tram-trains, which run half-hourly to Cathedral in Sheffield city centre via Rotherham Central.
- There appears to be plenty of space.
This OpenRailwayMap shows the tracks at the current Rotherham Parkgate tram stop.
Note.
- The orange lines are the main railway tracks.
- Rotherham Parkgate is indicated by the blue arrow in the North-East corner of the map.
- Trains would run between Sheffield and Rotherham Parkgate via Meadowhall Interchange and Rotherham Central.
- Trains and tram-trains would share tracks through Rotherham Central.
After passing Rotherham Parkgate trains would go to Swinton, and then on to Doncaster or Leeds.
Sheffield And Leeds Via Rotherham Parkgate
Currently, there is an hourly service between Leeds and Sheffield, that goes through the Rotherham Parkgate site.
- It calls at Outwood, Wakefield Westgate, Sandal & Agbrigg, Fitzwilliam, Moorthorpe, Thurnscoe, Goldthorpe, Bolton-upon-Dearne, Swinton, Rotherham Central, Meadowhall.
- The service takes one hour and thirteen minutes, but there are eleven stops.
- As the distance is 38.9 miles, that works out at an average speed of 32 mph.
I suspect this schedule was written for Pacers.
The Department of Transport is aiming for a forty minute journey, which is an average speed of 58.4 mph.
Consider.
- If you look at the maximum speeds of the route from Rotherham Parkgate to Wakefield Westgate, it is 21.8 miles of 100 mph track.
- About twenty miles to the South of Wakefield Westgate is electrified.
- Leeds and Wakefield Westgate is 10.1 miles of 75-85 mph track.
- LNER’s expresses leave Wakefield Westgate, eleven minutes after leaving Leeds.
- I can find a TransPennine Express that takes thirteen minutes to go between Sheffield and Rotherham Parkgate late at night on the way to the depot.
The eleven and thirteen minutes mean that leaves 16 minutes for Rotherham Parkgate to Wakefield Westgate, if Sheffield and Leeds are to be timed at forty minutes, which would be an average speed of 82 mph between Rotherham Parkgate and Wakefield Westgate.
I feel that for a forty minute journey between Leeds and Sheffield, the following conditions would need to be met.
- Very few stops. Perhaps only Meadowhall, Rotherham Parkgate and Wakefield Westgate.
- 100 mph running where possible.
- 100 mph trains
- Electric trains would help, as acceleration is faster. Battery-electric trains would probably be sufficient.
- Some track improvements might help.
But forty minutes would certainly be possible.
At present there are five trains per hour (tph) between Leeds and Sheffield.
- Northern – 2 tph – via Wakefield Kirkgate, Barnsley and Meadowhall – 58 minutes
- Northern – 1 tph – via Outwood, Wakefield Westgate, Sandal & Agbrigg, Fitzwilliam, Moorthorpe, Thurnscoe, Goldthorpe, Bolton-upon-Dearne, Swinton, Rotherham Central and Meadowhall – One hour and 13 minutes
- Northern – 1 tph – via Woodlesford, Castleford, Normanton, Wakefield Kirkgate, Darton, Barnsley, Wombwell, Elsecar, Chapeltown and Meadowhall – One hour and 19 minutes.
- CrossCountry – 1 tph – via Wakefield Westgate – 44 minutes
Note.
- Only the second service will go through Rotherham Parkgate.
- The CrossCountry service takes the more direct route avoiding Rotherham Parkgate.
- All trains go via Meadowhall, although the CrossCountry service doesn’t stop.
- If the CrossCountry service was run by electric trains, it might be able to shave a few minutes as part of the route is electrified.
The CrossCountry service indicates to me, that 40 minutes between Leeds and Sheffield will be possible, but a stop at Meadowhall could be dropped to save time.
Extending East Midlands Railway’s Sheffield Service To Leeds
Consider
- Sheffield station has two tph to London all day.
- The CrossCountry service looks like it could be timed to run between Leeds and Sheffield in forty minutes.
- An East Midlands Railway Class 810 train could probably be timed at 40 minutes between Leeds and Sheffield via Meadowhall, Rotherham Parkgate and Wakefield Westgate.
- The current Northern services could continue to provide connectivity for stations between Leeds and Sheffield.
Extending one tph of East Midlands Railway’s trains to Leeds would probably be sufficient to give two fast trains per hour between Leeds and Sheffield.
- The East Midlands Railway and CrossCountry services could provide a fast service between Leeds and Sheffield in forty minutes.
- If they were electric or battery-electric trains, I suspect that they could call at Meadowhall, Rotherham Parkgate and Wakefield Westgate.
- They could be backed up by the two tph through Barnsley, which could probably be speeded up to around fifty minutes by electrification or using battery-electric trains.
The East Midlands Railway service between London and Leeds would be under three hours.
- Rotherham would get an hourly train to London.
- ,London and Leeds in under three hours, would be slower than Leeds and King’s Cross.
- But the electrification of the Midland Main Line would speed it up a bit.
A fast Leeds and Derby service might compensate for the loss of the Eastern leg of High Speed Two.
Sheffield And Doncaster Via Rotherham Parkgate
At present there are three tph between Sheffield and Doncaster.
- Northern – 1 tph – via Meadowhall, Rotherham Central, Swinton, Mexborough and Conisbrough – 42 minutes
- Northern – 1 tph – via Meadowhall – 28 minutes
- TransPennine Express – 1 tph – via Meadowhall – 27 minutes
Note.
- The first Northern train continues calling at all stations to Adwick.
- The second Northern train continues calling at all stations to Scarborough.
- Both Northern services go through Rotherham Parkgate.
- The TransPennine Express service takes the more direct route avoiding Rotherham Parkgate.
- All trains go via Meadowhall.
These services would give good connectivity for a London train, with a change at Rotherham Parkgate.
Improving Tracks Between Doncaster, Leeds and Sheffield
Consider.
- About 65 % of the main routes between Doncaster, Leeds and Sheffield have a maximum operating speed of 100 mph.
- Doncaster and Leeds is electrified.
- Only 35 miles is without electrification.
- The Midland Main Line is in the process of being electrified to Sheffield.
- There are plans to extend the Sheffield tram-trains to Doncaster Sheffield Airport, that I wrote about in Sheffield Region Transport Plan 2019 – Doncaster Sheffield Airport.
There is also heavyweight electrification infrastructure through Rotherham Central for the Sheffield tram-trains.
As it is only used by the tram-trains it may be only 750 VDC. But it can probably handle 25 KVAC.
- Could these routes be improved to allow faster running?
- Would it be cost-effective to electrify between Sheffield and the East Coast Main Line and the Doncaster and Leeds Line?
- Alternatively battery-electric trains could be run on the routes between Doncaster, Leeds and Sheffield, charging at all three main stations.
Any form of electric train should be faster, as acceleration and deceleration is faster in any electric train, be it powered by electrification, batteries, hydrogen or a hybrid diesel-battery-electric powertrain.
Conclusion




































































































