The Anonymous Widower

Thoughts On Belmont Station

This press release from Sutton Council is entitled Trains Running To Belmont Set To Double As Sutton Wins £14 million Levelling Up Funding.

These four paragraphs outline the scheme.

The number of trains running to Belmont is set to double after Sutton Council secured a £14.1 million cash injection from the government’s Levelling Up Fund.

The investment has been awarded to unlock the full potential of the London Cancer Hub, the world-leading life sciences campus that is being developed in Belmont and is poised to create 13,000 jobs and £1.2 billion each year for the UK economy.

The money will be used to improve rail services at Belmont, an area which has been poorly served by public transport until now. This will enable train services to double from two to four trains an hour, with additional direct services between Belmont and London Victoria. Belmont station will also be improved with step-free access, better wayfinding signage and new walking and cycling routes to the London Cancer Hub.

Better public transport is key to delivering the huge health and employment benefits of the London Cancer Hub. The major regeneration project is set to bring unprecedented investment to Sutton and tackle health inequalities nationwide by accelerating life-saving cancer research and innovation.

I have some thoughts.

Comparison To The Cambridge Biomedical Campus

The Cambridge Biomedical Campus is a similar medical research site in Cambridge.

  • The Cambridge site does more general research, than the Sutton site.
  • Both sites have world class hospitals.
  • Both hospitals attract lots of patients from some distance away.
  • The Cambridge site already has 20,000 employees, as opposed to Sutton’s target of 12,000.
  • In a few years, the Cambridge site will have a railway station; Cambridge South, connecting it to London and the wider environs of Cambridge.
  • The Cambridge site has good cycle and bus connections to the  Greater Cambridge area.
  • The Sutton site, needs good cycle and bus connections to the local area and especially local stations, including Belmont.

In addition, I believe that if Belmont had four trains per hour (tph) connecting it to Greater London, this would be an alternative to using private cars to reach the Sutton site.

Handling Patients At Belmont Station

Going into hospital even for just a short out-patient visit can be stressful, so I feel it is important that everything is done to make the time in the station and getting between the train and bus, as stress-free as possible.

  • Access between train and platform should be step-free and wheelchair-friendly.
  • There should be a comfortable waiting area.
  • Access between the train and bus should be step-free and wheelchair-friendly.
  • Buses should be timed to meet the trains.
  • There should be lots of information.
  • I suspect blind people get cancer, just like most people, so there probably needs to be staff or volunteers at the station.

I see a couple of problems.

  • Getting the bus next to the platform is difficult, as they’ve built flats on the space in front of the station.
  • The light controlled crossing, is in the wrong place for slow travellers to get across the road to the bus station.

Some hard and possibly expensive thinking will be needed to get good access between the trains and the bus to the hospital.

How Well Would Four tph Connecting London Victoria And Belmont Serve The Hospital?

The current trains between London Victoria and Belmont call at the following stations, where there are interchange possibilities.

  • Clapham Junction, which has lots of connections.
  • Balham, which connects to the Northern Line.
  • West Croydon, which connects to the Overground.
  • Sutton, which connects to Thameslink.

There may be sensible reasons for the extra two tph from Belmont to serve another set of destinations.

The train services should be designed in partnership with the NHS cancer treatment.

 

January 22, 2023 Posted by | Transport/Travel | , , , , | 1 Comment

Potential Site For New Cambridge South Station Named

The title of this post, is the same as that of this article on Rail News.

The article says this about the site of the proposed Cambridge South station.

There had been three options for the station site and the preferred choice, which is the furthest north and nearest the guided busway, will offer improved connections with other railway routes as well as the busway. Although the detailed plans for East West Rail between Bedford and Cambridge have not yet been confirmed, it is possible that EWR trains will call at Cambridge South.

This Google Map shows the area.

Note.

  1. Addenbrooke’s and Papworth Hospitals and the Cambridge Biomedical Campus in the South-East corner of the map.
  2. Long Road going East-West across the map.
  3. The West Anglia Main Line going North-South, at the Western edge of the Cambridge Biomedical Campus. Cambridge station is to the North and Shelford station is to the South.
  4. Running diagonally away from the railway towards the South-West corner of the map, is the Cambridge Busway. which connects the Trumpington Park and Ride to Cambridge station and the City Centre.

It would appear there would be plenty of space to put a station with enough capacity for this important medical complex.

Train Services

Trains passing through that area include in trains per hour (tph)

  • CrossCountry – 1 tph – Birmingham New Street and Stansted Airport via Cambridge
  • Freater Anglia – 2 tph – London Liverpool Street and Cambridge North via Cambridge
  • Greater Anglia – 1 tph – Norwich and Stansted Airport via Cambridge and Cambridge North
  • Great Northern – 1 tph – London King’s Cross and Ely via Cambridge and Cambridge North
  • Great Northern – 1 tph – London King’s Cross and Kings Lynn via Cambridge and Cambridge North
  • Thameslink – 2 tph – Brighton and Cambridge
  • Thameslink – 2 tph – London King’s Cross and Cambridge

That all adds up to 10 tph to Cambridge and 5 to Cambridge North.

When you add in future services on East West Rail, and do a bit of reorganisation, there could be twelve tph through the three Cambridge stations.

June 23, 2020 Posted by | Transport/Travel | , , , , , , | Leave a comment

Cambridge South Station To Be Developed

To me, this was one of the highlights of the 2020 Budget today.

As I lived near Cambridge for over a dozen years and regularly played real tennis at the University, I know the scientific heartbeat of the City better than most.

I have discussed the problems of running a business in the City, with many, who are associated with some of the City’s most successful businesses. I have also funded several ventures in the area.

The same basic problems keep arising.

  • Lack of premises, offices and workshops, of all sizes and qualities.
  • Lack of staff to work in the ventures.
  • Lack of suitable housing, where staff moving to the City can live.
  • Staff are being forced to live further out and the roads, railways and other pubic transport systems don’t have the capacity.
  • Inadequate connections to Stansted Airport.

In the last few years, the transport has improved.

  • A sophisticated and award-winning Park-and-Ride running to five large car parks ringing the City has been developed.
  • The Park-and-Ride also caters for cyclists.
  • Cambridge North station has been opened close to the Cambridge Science Park and the A14 Cambridge Northern By-Pass, with a 450-space car-park and space for a thousand bikes.
  • The Cambridge Guided Busway has been developed across the City from Huntingdon station to Trumpington via Cambridge Science Park, Cambridge North station, Cambridge City Centre, Cambridge bus station, Cambridge station and Addenbrooke’s Hospital.
  • Addwnbrooke’s Hospital is a Major Trauma Centre.
  • The forecourts of Cambridge and Cambridge North stations have been developed to create good interchanges and meeting points.
  • Great Northern now has two fast and two stopping trains per hour (tph) between London Kings Cross and Cambridge and/or Cambridge North stations, with trains continuing alternatively half-hourly to Ely or Kings Lynn.
  • Thameslink has two tph between Brighton and Cambridge.
  • Thameslink also has two tph between Cambridge and London Kings Cross, which will be extended to Maidstone East station, within a couple of years.
  • Greater Anglia run an hourly service between Norwich and Stansted Airport via Ely, Cambridge North and Cambridge stations.
  • Greater Anglia run two tph between London Liverpool Street and Cambridge North stations.
  • Greater Anglia run an hourly service between Ipswich and Cambridge via Bury St. Edmunds and Newmarket stations.
  • All Greater Anglia trains are being replaced with new and much larger Class 755 or Class 720 trains.
  • CrossCountry run an hourly service between Birmingham New Street and Stansted Airport via Peterborough, March, Ely, Cambridge North and Cambridge stations.
  • The A14 and A428 roads are being improved between Cambridge and the A1.
  • The East West Railway between Reading and Cambridge via Oxford, Milton Keynes and Bedford is being developed and should open before the end of the decade.

But Cambridge still needs better links to the surrounding countryside and further.

  • Connections to Peterborough could be doubled to hourly.
  • Cnnections to Haverhill and Wisbech are poor.
  • East West Railway have ideas about improving connections to both East and West of Cambridge.
  • Better connections are needed at Addenbrooke’s to connect the rail system to the hospital and the Cambridge Biomedical Campus.

Cambridge South station would be the icing on the cake.

  • It could be the Southern terminus of a Wisbech service.
  • It could be on a service of at least four tph between Ely and Cambridge South stations via Waterbeach, Cambridge North and Cambridge stations.
  • It would bring Addenbrooke’s and the Cambridge Biomedical Campus within easy commuting of London.
  • It would be well-connected to Bedford, London, Milton Keynes, Oxford, Reading, Stansted Airport and Stevenage.
  • There have also been rumours, that the station could be connected to the Cambridge Autonomous Metro, which would be developed from the Cambridgeshire Guided Busway and the Park-and-Ride.

Cambridge South station would be the hub, that ties all the various routes together,

The station could be a fairly simple station to build, by just building platforms and buildings alongside the existing electrified line.

This Google Map shows the hospital. and the West Anglia Main Line running North-South to the West of the hospital.

Note the West Anglia Main Line running North-South to the West of the hospital.

Station Design

This page on the Network Rail web site gives a basic design.

  • Four platforms with step-free access via a footbridge and lifts;
  • Platforms with seating and shelter for waiting passengers;
  • A ticket office and ticket machines, along with automatic ticket gates;
  • Taxi and passenger drop off facilities:
  • Facilities such as a retail/catering unit, a waiting room and toilets;
  • Blue badge parking; and
  • Cycle parking.

The page then gives various location options.

Services

These are my take on the initial services, based on the current ones and those proposed by the East West Railway.

  • 1 tph – CrossCountry – Birmingham New Street and Stansted Airport, via Coleshill Parkway, Nuneaton, Leicester, Melton Mowbray, Oakham, Stamford, Peterborough, March, Ely, Cambridge North, Cambridge, Cambridge South and Audley End.
  • 1 tph – Greater Anglia – Norwich and Stansted Airport, via Wymondham, Attleborough, Thetford, Brandon, Lakenheath, Ely, Cambridge North, Cambridge, Cambridge South, Whittlesford Parkway and Audley End.
  • 1 tph – Greater Anglia – Ipswich and Cambridge South via Needham Market, Stowmarket, Bury St. Edmunds, A14 Parkway, Newmarket and Cambridge.
  • 2 tph – Greater Anglia – Cambridge North and London Liverpool Street via Cambridge, Cambridge South, Audley End, Bishops Stortford, Harlow, Broxbourne and Cheshunt.
  • 1 tph – Greater Anglia – Wisbech and Cambridge South via March, Ely, Cambridge North and Cambridge.
  • 2 tph – Thameslink – Cambridge and Brighton via Stevenage, London St. Pancras, East Croydon and Gatwick Airport.
  • 2 tph – Thameslink – Cambridge and Maidstone East via Stevenage, London St. Pancras and Blackfriars
  • 2 tph – Great Northern – Ely/Kings Lynn and London Kings Cross via Stevenage.
  • 1 tph – East West Railway – Norwich and Reading or Oxford, via Ely, Cambridge North, Cambridge, Cambridge South, Bedford and Milton Keynes.
  • 1 tph – East West Railway – Manningtree and Reading or Oxford, via Ipswich, Needham Market, Stowmarket, Bury St. Edmunds, A14 Parkway, Newmarket, Cambridge, Cambridge South, Bedford and Milton Keynes

Note.

  1. I have left out a few less important stations.
  2. I have extended the current Ipswich and Cambridge service to Cambridge South.
  3. I have added East West Rail’s proposed A14 Parkway station.
  4. I have added a Wisbech and Cambridge South service.

This simple service gives the following frequencies.

  • 6 tph – Ely and Cambridge North
  • 8 tph – Cambridge North and Cambridge
  • 10 tph – Cambridge and Cambridge South
  • 2 tph – Cambridge/Cambridge South and Stansted Airport
  • 1 tph – Cambridge North/Cambridge/Cambridge South and Kings Lynn
  • 8 tph – Cambridge/Cambridge South and London
  • 2 tph – Cambridge/Cambridge South and Ipswich.
  • 2 tph – Cambridge North/Cambridge/Cambridge South and Norwich.
  • 1 tph – Cambridge North/Cambridge/Cambridge South and Peterborough.
  • 6 tph – Cambridge/Cambridge South and Stevenage.

I feel strongly about the following.

  • If six tph is thought to be ideal between Cambridge/Cambridge South and Stevenage, then surely more services are needed between Cambridge and Ipswich, Kings Lynn, Norwich. Peterborough and Stansted Airport. Perhaps as many as four tph are needed to give a Turn-Up-And-Go service.
  • The frequency through Ely, Cambridge North, Cambridge and Cambridge should be as high as possible. With digital signalling ten tph must be possible.

At least Greater Anglia have plenty of Class 755 trains.

Conclusion

Rishi Sunak is right to build Cambridge South station.

You might even be able to argue, that the work done on the Cambridge Biomedical Campus could be key in fighting diseases like the coronavirus.

March 11, 2020 Posted by | Transport/Travel | , , , , , , , , , , , , , , , | 2 Comments