The Anonymous Widower

Crouch Hill Station – 28th August 2018

The bridge at Crouch Hill station has now been rebuilt and is complete.

As can be seen it’s all clean and tidy.

August 29, 2018 Posted by | Transport | , | 2 Comments

New Overground Trains For Gospel Oak To Barking line Delayed… By Three Months

The title of this post is the same as that, of this article in the Islington Gazette.

Various reasons are given.

  • The Bridge at Crouch Hill station.
  • Delays in testing the overhead wires.
  • Software problems on the trains.
  • TfL are awaiting trains for driver training.

Network Rail and TfL are apparently blaming each other.

There has been some very bad planning and design on the updating of the Gospel Oak to Barking Line.

  • Crouch Hill bridge should have been rebuilt earlier.
  • Some of the overhead gantry supports were built to wrong dimensions.
  • Some of the project planning seems optimistic with hindsight.

Would I also be right in thinking, that the process of introducing the new trains could have been better handled?

Or is it just, that the idea was to get the Geospel Oak to Barking Line working first and run perhaps a couple of Class 710 trains on the line for the following purposes.

  • Give a thorough testing of all systems.
  • Accumulate certification mileage.
  • Training of drivers.

This would appear to be what happened with Crossrail’s Class 345 trains, which could be seen shuttling up and down between Stratford and Shenfield stations for a couple of months in the middle of the day, before they were allowed to carry fare-paying passengers.

Perhaps, the testing of the trains and initial training of the drivers should have been planned for the Northern section of the Watford DC Line, where the same dual-voltage 710/2 variant of the trains will eventually be deployed.

Conclusion

It would all have been so much different, if the electrified railway had been delivered on the original target date that according to Wikipedia, would have allowed the new trains to run in early 2018.

 

 

April 26, 2018 Posted by | Transport | , , , , | 2 Comments

Before GOBlin Electrification – Crouch Hill

I’d never been to Crouch Hill station before, but I went to take these pictures.

It is another tidy station with fairly long platforms, steep staircases and no lifts. Although unlike Leyton Midland Road, the station is in a cutting, rather than on a viaduct.

My pictures were as you can see interrupted by a dreaded Class 66 locomotive, with all its noise and smell passing through. After electrification, hopefully we’ll see something more environmentally-friendly like an elderly Class 90 or a brand new Class 88 locomotive. Unfortunately, I think we’ll see mainly Class 66s pulling freight trains for some years, as there are so many of them and they seem to be pretty reliable, although unloved by the drivers.

August 14, 2015 Posted by | Transport | , , , , , , | 1 Comment