The Anonymous Widower

Never On Sunday

There have always been things that were banned on Sundays or because of personal reasons, you never did on that day.

  • A Welsh friend at Liverpool University called David Roberts didn’t use to drink on Sundays when I first met him. But we soon cured him of that!
  • My late wife, who had been a Sunday school teacher in her time, wouldn’t go to the cinema on Sunday, as her mother thought it ungodly.
  • For myself, I don’t think I went to a football match on a Sunday until I was about forty, as they were never staged on Sundays.

I also remember the first day, that C and myself went to the first 1000 Guineas at Newmarket on a Sunday. Now horse racing and most other sport on a Sunday is considered normal, just as it is in the rest of the world.

It also used to be that the Northern City Line didn’t run at weekends, despite having three stations that served The Emirates Stadium.

This morning before it rained, I took a trip to Harringay station to view the Wightman Road Bridge, by taking a 38 bus to Essex Road station and then going three stops to the North.

The line is getting new Class 717 trains, but I do feel that some work to improve the stations might not be a bad idea.

I actually wanted to buy a ticket on that dreadful machine from the Zone 6 boundary to Guildford, but unlike London Overground and some other companies ticket machines, it doesn’t sell such a useful ticket, which I wrote about in The Price Of Freedom.

More details of the Class 717 trains are given in this article in Rail Magazine, which is entitled New Govia Thameslink Railway trains to be Class 717s. This is said.

They are similar to the Class 700s being built by Siemens for GTR (of which 16 are in the UK), but they must have end doors as per safety regulations due to their operation in the Moorgate Tunnels. The design of this is at an advanced stage, with construction due to start this year.

I have felt that the Northern City Line, would be a classic application for an IPEMU for some time, as this would enable the Moorgate tunnels to be electrically-dead, as the trains would use batteries between Drayton Park and Moorgate stations. This would have the following effects.

  • The third-rail electrification could be deactivated or even removed.
  • The trains could also be 25 VAC only, if they wouldn’t be going into any other third-rail territory.

How would this impact tunnel safety regulations?

Whatever happens to this line, running a seven day a week service, will make the Northern City Line a valuable rail line in my part of London.

On a personal note, the line and Essex Road station in particular,  will help me cut-out the dreaded Highbury and Islington station, with its long passageways and lack of lifts.

June 12, 2016 Posted by | Transport/Travel | , , , , , | 3 Comments

Cheam Station

Cheam Station is one of the stations on the route a proposed South London Outer Orbital, although I doubt the limited-stop service would call.

I took these pictures as we passed through.

It is a curious station, quite unlike any others you see on the electrified lines South of the Thames. The layout is explained in the History section in the Wikipedia entry.

The station is almost 16 miles (26 km) from London Bridge station. Over the years Cheam station expanded, and was rebuilt and the rail bed widened in preparation for the installation of AC overhead electric services, which would have included the building of an additional central platform island. Due to the outbreak of the First World War, the full planned expansion was cancelled and was never completed. Nevertheless, the through lines were still in place until the late 1970s when the Bognor Regis and Portsmouth express services were withdrawn from the Sutton and Dorking route to serve an expanding Gatwick Airport. The wide space between the tracks still remains and shows where the fast lines had been laid prior their removal. The brick main buildings are on the down side of the station.

How different would trains be South from London, if the electrification was overhead?

June 7, 2016 Posted by | Transport/Travel | , | 1 Comment

Improvements To Clapham High Street And Wandsworth Road Stations

In the June 2016 Edition of Modern Railways, there was an article entitled Turning South London Orange.

The report suggests putting platforms at Clapham High Street and Wandsworth Road stations on the Southeastern tracks to enable a direct service to Victoria to be reinstated.

This map from carto.metro.free.fr shows the lines through the two stations.

Lines Through Wandsworth Road And Clapham High Street Stations

Lines Through Wandsworth Road And Clapham High Street Stations

If the proposed Brixton Tunnel were to be built, that would mean that only local stopping services and the London Overground trains would call at these two stations.

So would only two platforms be needed to handle all the trains? The frequency would probably be something in the region of twelve trains per hour, with possibly six on the Overground and six going to and from Victoria.

I know of many places in London and the rest of the UK, where a train every five minutes would be considered easy to handle. Crossrail and Thameslink will be handling a train at twice this frequency.

The great advantage of all trains in one direction being handled on a single platform face, is that if say you wanted to go from Dalston Junction to Victoria, you could get off one train at either of these stations and then get the next to your appropriate destination.

You could even use a wide island platform, which would allow changes where direction is reversed without leaving the platform. It would also only require one lift, so could the money be used for an escalator?

Because of the problems of providing platforms and a step-free connection at Brixton, undoubtedly, the platforms there would be built on the Northern pair of tracks. So I suspect that they would on these two stations.

This would have various knock-on effects.

  • Freight, empty stock movements and other non-stopping services would use the Southern pair of tracks.
  • There would probably need to be some reorganising of the junctions to the West of Wandsworth Road station, as part of the tunnel works.
  • There would need to be some sorting out of the junctions East of Brixton to make sure all of the trains got to and from the correct places.
  • Clapham High Street station could be properly integrated into Clapham North station with an escalator connection.

In some ways, it all shows how a tunnel under Brixton could be a masterstroke.

May 27, 2016 Posted by | Transport/Travel | , , | Leave a comment

A New Station For Battersea

In the June 2016 Edition of Modern Railways in an article entitled Turning South London Orange.

One of the proposals is to create a new station at Battersea.

The station is proposed to have platforms on the Southeastern lines into Victoria, close to the Dogs’ Home, that will adjoin the new Battersea Power Station station on the Northern Line extension.

This Google Map shows the Battersea area |South of the Thames.

Battersea

Battersea

Note the position of Battersea Power station to the East of the railway lines crossing the Thames into Victoria station.

The three stations shown are from North to South.

Battersea station will sit somewhere to the South West of the Power Station.

This Google Map shows the area in more detail.

The Location Of Battersea Station

The Location Of Battersea Station

Given that there is a redesign at Battersea, that I wrote about in Is A Big Row Developing Over The Northern Line Extension?, I have this feeling that a new Battersea station might be part of the solution. If Transport for London are having to foot the bill for a stronger station box, then connecting it to a new station on the Southeastern lines might generate traffic, that would create some income.

If the Improved South London Line proposed by Centre for London is built, then the new Battersea station will be conveniently between Victoria and Wandsworth Road stations.

  • It would link the Northern Line to the Southeastern  lines.
  • It would improve journeys between South and South East London to Central London.

According to several theories, you can’t have too many stations.

May 27, 2016 Posted by | Transport/Travel | , , , | 4 Comments

Proposed New Stations And Interchanges In South London

In the June 2016 Edition of Modern Railways in an article entitled Turning South London Orange.

In the article, there is a table of Station and Interchange Proposals. I will list them in order.

Battersea

Battersea station is proposed to have platforms on the Southeastern lines into Victoria, close to the Dogs’ Home, that will adjoin the new Battersea Power Station station on the Northern Line extension.

As this station appears to be crucial to a lot of the Centre for London reports proposals, I have given the new station its own post called A New Station For Battersea.

Beddington

Beddington station is proposed between Wallington and Waddon stations on the line between West Croydon and Sutton stations.

I don’t this area well, but here’s a Google Map between Wallington and Waddon stations.

Proposed Beddington Station

Proposed Beddington Station

According to the Centre for London report, there is a long gap between stations and there has been a loot of development in the area.

The rail line runs across the middle of the map and the station is proposed for Plough Lane, South of Bandon Hill Cemetery.

Brixton

One of the proposals in the article is to create an improved station at Brixton, by reopening disused platforms on the Northernmost tracks at the station.

I have written this a separate post at An Improved Station For Brixton

Brockley

The article proposes a new pair of platforms on the South London Line between Nunhead and Lewisham stations, providing interchange with the existing Brockley station.

I gave my views on Brockley station in A Report On The Bakerloo Line Extension, which I now repeat.

This Google Map shows Brockley  station.

Brockley Station

Brockley Station

The Bexleyheath Line between Nunhead and Lewisham stations crosses the East London Line and Brockley station at a high level.

I wrote A Four-Poster Station about connecting these two lines.

It would appear that Transport for London have advanced this project from one word in their 2050 Infrastructure Plan to a proposal.

This is the sort of connectivity, that us plebs in Dalston will like a lot. From 2018, as I wrote in Increased Frequencies on the East London Line, there will be ten services per hour between Dalston Junction and Brockley stations and one change at Brockley, will open up many transport opportunities.

Camberwell

Camberwell station is a new station on the Thameslink Line between Elephant and Castle and Loughborough Junction stations.

This Google Map shows the area around the disused Camberwell station.

Camberwell Station

Camberwell Station

Camberwell station used to be where Camberwell New Road crosses under the railway.

Wikipedia has a section about the re-opening of the station. This is said.

In March 2016 it was reported by Transport for London that proposals to re-open the station are being considered with other stakeholders, including the London Borough of Southwark. Initial feasibility indicates it would be possible to construct a modern station on the site if timetables could be modified to accommodate Camberwell as an additional stop. TfL will be working with Network Rail and the boroughs of Southwark and Lambeth to further develop the feasibility of this proposal.

I would also suspect that being able to open a new Camberwell station, at the same time as Thameslink, would be very easy to justify on a costs basis.

Clapham East

Clapham East station is proposed to be half a mile North-East of Clapham Junction station on the East London Line.

As this station is a new proposal and hasn’t come to my notice before, I have given the new station its own post called A New Station For Clapham East.

 

Clapham High Street And Wandsworth Road

The report suggests putting platforms at Clapham High Street and Wandsworth Road stations on the Southeastern tracks to enable a direct service to Victoria to be reinstated.

I have dealt with these two stations in Improvements To Clapham High Street And Wandsworth Road Stations.

Imperial Wharf

There is an interesting proposal to put a footpath over the Thames to give access to Imperial Wharf station from the South Bank.

This Google Map shows the station and the Thames.

Imperial Wharf Station And Bridge

 

Why not build the footpath?

 

New Cross

New Cross station is just over five hundred metres from New Cross Gate station. This Google Map shows both stations.

New Cross Gate And New Cross Stations

New Cross Gate And New Cross Stations

The Centre for London is proposing stopping East London Line services to New Cross, increasing service to New Cross Gate and building a travolator between the two stations. They say this in the report.

The proposal is to build an underground travolator between New Cross, Goldsmiths College and New Cross Gate interchange. At New Cross Gate a more frequent train service would be available on the ELL and existing Southern route. This would be a practical alternative linking the Southeastern and South Central networks, and it would also create Southeastern lines access via New Cross to the proposed Bakerloo station at New Cross Gate, for those trains which avoided Lewisham.

It is an interesting solution, that possibly could be used in many places.

 

 

May 26, 2016 Posted by | Transport/Travel | , , , | Leave a comment

Leaving Ljubljana

I took an early start as my train left at 09:23 for Munich. But at least the breakfast in the hotel was not bad at all.

The pictures show the station, where at least I was able to get some weak sun after the last couple of days in Croatia.

I must admit, I’ve never seen so many trains with added graffiti. I suppose, if it’s always raining, it passes the time.

May 13, 2016 Posted by | Transport/Travel | , , | Leave a comment

Two Beautiful Seats At West Acton Station

This seat forms the waiting area at West Acton station on the Central Line.

With the rounded window, it must be one of the most beautiful platform shelters on any rail station.

Note the picture of the second one on the other track.

Wikipedia says this about the design of the station.

The current station, replacing the original building, was designed by the Great Western Railway, on behalf of London Transport as part of the LPTB’s 1935-40 New Works Programme improvements and extensions to the Central line, by the GWR’s architect Brian Lewis and was completed by November 1940.

So it was actually designed by the Great Western Railway.

May 4, 2016 Posted by | Transport/Travel | , , | Leave a comment

Simple Art At Blackfriars Station

I’ve been through Blackfriars station many times and have never noticed this art before.

Simple Art At Blackfriars Station

Simple Art At Blackfriars Station

All of the bricks have the names of stations served by trains from the old Blackfriars station.

It must be the only place where Baden-Baden is next to Beckenham.

 

 

April 20, 2016 Posted by | Transport/Travel | , | Leave a comment

Reversal Stations

In Crossrail In East Docklands, I said this about Whitechapel station.

Whitechapel station will be Crossrail’s Jewel In The East and the most important interchange for the line in East London.

  • It links both eastern branches of Crossrail to the Metropolitan and District Lines.
  • It provides an interchange to London’s important but sometimes forgotten East London Line.
  • An extended Whitechapel station would provide much better access to the East of the City of London.

But perhaps more importantly, Whitechapel is the reversal station for passengers travelling between one Eastern branch of Crossrail and the other.

A reader has asked me what I mean by a reversal station.

Look at this map from carto.metro.free.fr, which shows the lines around and through Whitechapel.

Lines Through Whitechapel

Lines Through Whitechapel

The Crossrail tracks, which are shown in blue, come from the West and go through the two platforms at both Liverpool  Street/Moorgate and Whitechapel, before dividing into the two branches to Abbey Wood and Shenfield, a mile or so South of Stepney Green.

Note.

  • Liverpool Street and Moorgate will share a massive doubled-ended Crossrail station with an island platform, that connects to all the lines at the two stations it connects.
  • Whitechapel has a massive underground station with another island platform, where all Eastbound trains use the North side of the platform and the Westbound trains use the South.

I call Whitechapel a reversal station, as it means that any passenger arriving from the East wanting to go West on the other branch, just walks across the platform and gets an appropriate train.

As a dozen trains an hour will be using each branch, that means the maximum wait will be five minutes, but if say the trains were timed to pair up at Whitechapel, so that an Eastbound Shenfield train was always in the station with or just after a Westbound train Abbey Wood and vice-versa, the interchange time would be determined by how long it took passengers to walk across.

The interchange is totally step-free for transferring passengers and can be paired with a very wide platform to make the interchange easy for everyone.

It is a simple but absolutely brilliant concept!

The designer of the station obviously liked it so much, he did it again at Whitechapel.

Arrive at Whitechapel on an Eastbound Metropolitan or District Line train and if you need to go back West on the other line, you just walk across for the train you want. These trains don’t pair up, but then the signalling wasn’t designed to be this sophisticated in the middle of the last century.

This interchange on the Sub Surface Lines has only started recently and I wonder how often it is used by passengers.

Are there any other stations, where this passenger reversal is or could be used?

Hayes And Harlington

A similar technique could have been used at Hayes and Harlington station to link the two Western branches of Crossrail, which have the following services.

  • Four trains per hour serve the Heathrow Branch.
  • Two trains per hour serve both Reading and Maidenhead.

But using a similar layout to Whitechapel with a spacious island platform and scheduling the trains appropriately, might effectively give Reading four services an hour to Heathrow, which would involve nothing more than a step-free interchange at Hayes and Harlington.

It would certainly have been more affordable than tunneling into Heathrow from the West.

This map from carto.metro.free.fr shows the lines through Hayes and Harlington and the Junction for Heathrow.

Lines Through Hayes And Harlington And Heathrow Junction

Lines Through Hayes And Harlington And Heathrow Junction

It’s probably too late now to adjust all the tracks and platforms at Hayes and Harlington station and the Stocley Viaduct, but I do believe that something could be setup at the station to improve access to Heathrow from the West until the full tunnelled link is built.

I believe that good design here, could have enabled a much more affordable Western Link for Heathrow, without any need to tunnel into the Airport.

An ideal solution would incorporate.

  1. Two tracks into Heathrow.
  2. Step-free and preferably step-across interchange at Hayes and Harlington station for passengers from Reading.
  3. Connection to Great Western Railway’s local trains in the Thames Valley.
  4. Contactless ticketing using bank cards between London, Heathrow and London.
  5. All Crossrail trains from London to serve all terminals.

Point five must be possible, as I’m sure the tunnels under Heathrow have a larger capacity than is being used.

But Heathrow are holding Crossrail, London and Londoners to ransom!

But then we hold all the cards, as no Mayor and few Londoners, would ever support the expansion of Heathrow!

This Google Map shows the current Hayes and Harlington station.

Hayes And Harlington Station

Hayes And Harlington Station

This description of platform use is from Wikipedia.

The station has five platforms, four being through platforms and one being a terminus bay platform. Platforms 1-2 are used only during engineering works; platforms 3 & 4 are for stopping services to and from Heathrow Airport, Reading and Oxford; platform 5 is a bay terminus platform, which is sometimes used during peak times, amended services and during engineering works. Platform 5 is capable of holding an eight-car train; platforms 2, 3 and 4 can hold seven-car trains and platform 1 can hold a five-car trains. All lines at Hayes & Harlington are electrified. On platform 5 there is an alternative entrance leading to High Point Hayes, the entrance has Oyster Pay & Go readers, platforms 3 & 4 are connected by a bridge towards the end of the platforms.

Stations are numbered from the South.

What would need to be done is create an island platform between the two relief lines that will be used by Crossrail.

This would mean that a passenger between Heathrow and Reading, would just walk across the platform and wait for their train. As at Whitechapel, the first train would arrive a few minutes before the second left. It would be easy to arrange with Crossrail’s modern signalling and train control.

Under Crossrail in the Wikipedia entry for the station, these modifications are listed.

  1. New station building
  2. 4 new lifts to provide step-free access
  3. Platforms 1-4 extended
  4. New 200m bay platform 5 constructed (replacing existing bay)
  5. New platform canopies to platform 4 and 5
  6. Track work to widen the island platform 2/3 and to provide access to the new bay platform

Does point six mean that Platform 2 is Crossrail for Reading and Heathrow and Platform 3 is Crossrail for London?

I hope so, as that would give a step-across interchange between Reading and Heathrow.

But there is no mention of the layout of the two fast lines, which are currently served by platforms 1 and 2.

In Hayes And Harlington Station – 28th March 2016, there are several pictures of the station and the lines don’t appear to have been slewed to the South to enable the Crossrail Lines to be either side of an enlarged island platform 2/3.

It was probably just too difficult.

Old Oak Common

There are proposals to add a branch of Crossrail that would go up the West Coast Main Line to perhaps Milton Keynes. The logical place for Crossrail to join the West Coast Mail Line (WCML) is near Old Oak Common station.

I believe this could be another reversal station like Whitechapel, where the Western and WCML branches split to the West of the station.

This map shows some of the proposed track and station layout at Old Oak Common.

 

Rail Lines At Old Oak Common

Rail Lines At Old Oak Common

The WCML is off the North of this map.

Get this connection right and there would be step-across access between the WCML to Milton Keynes and all stations to Heathrow on Crossrail.

Willesden Junction On The North And West London Lines

The North London  and West London Lines divide to the west of Willesden Junction station.

Passengers between say Richmond and Imperial Wharf stations can use Willesden Junction station as a step-across to reverse direction. The timetable gives five or six minutes for the change, which is acceptable, but not as quick as I believe Whitechapel will be.

St. Pancras Thameslink

When the Thameslink Programme is completed, the Thameslink platforms at St. Pancras International will become a reversal station for passengers wanting to change between the Great Northern and Midland Main Line branches.

But it will not be a simple walk across a platform, but a hike over a footbridge, albeit one with step-free access.

The only Central London station on Thameslink, which will be an island platform will be London Bridge, where platforms 4 and 5 will serve Thameslink.

East Croydon

In an ideal world all Northbound Thameslink services at East Croydon station would call at the same island platform and all Southbound services would call at the opposite face of the island. I think that sixteen trains per hour will use the various Thameslink routes through East Croydon. On a dedicated platform, that is only one train every four minutes and the East London Line handles that with ease!

I think that the number of Thameslink trains through East Croydon is not very ambitious, in contrast to the number through the core of twenty-four trains per hour, which is ambitious, but not unduly so!

But I can’t find any information as to whether this will happen.

Where will passengers wanting to travel between Caterham and Tattenham Corner stations change trains?

It does strike me, that the care applied to the design of Crossrail, is lacking in the Thameslink Programme.

They obviously used ordinary envelopes, rather than special engineering ones!

Just compare the mess that is East Croydon station to the much larger, more complicated and impressive Reading station.

If Croydon is serious about being important, it needs a gateway station like Ealing Broadway, Huddersfield, Leeds, Liverpool, Manchester Victoria, Northampton, Nottingham, Stratford or Reading, rather than an overcrowded badly-designed stop on the Brighton Main Line, that just makes visitors say, they’ll never return.

East Croydon also needs a proper connection to the East London Line. The current terminus of West Croydon is one of the worst designed pieces of railway infrastructure in the world. It’s equivalent to putting a main station for Liverpool in Birkenhead or one for Newcastle in Sunderland.

West Croydon station should be shut as soon as possible and East London Line services transferred to East Croydon.

Manchester Piccadilly

Whilst I’m in attack-dog mode, the two worst platforms in the country are platforms 13 and 14 at Manchester Piccadilly station.

  • These platforms were designed to get passengers as fit as possible, by locating them some distance from the main station facilities.
  • They are too small and always crowded.

The plans to remedy the overcrowding, include building two new platforms further out at great expense.

This may solve the problem, but I’d like to see answers to these questions first.

  • How many trains per hour stop at each platform? A platform like this should be able to handle sixteen trains per hour both ways, as does Canada Water on the Overground.
  • How many passengers use this island platform to reverse direction?
  • How many passengers get off one train here and get on another in a few minutes? I’ve done that myself on those platforms, a few times.
  • How would platform utilisation change with two and three-car trains changed for larger ones?
  • Could a reorganisation of services and the Ordsall Curve, increase seats on various routes, but reduce the number of trains through these platforms?
  • What difference would contactless ticketing using bank cards make to passenger throughput?
  • Is it necessary that every train stopping at Piccadilly always seems to stop at Oxford Road?

As an aside here, I could rightly claim that I’ve written more successful resource scheduling programs, than anybody else ever has!

I know it was designed in the 1960s, but I believe that by applying some modern data analysis and desjgn, that platforms 13 and 14, with more space, escalators and lifts everywhere, better facilities and perhaps a direct entry to the Metrolink station underneath, could go a long way to handling more traffic.

April 10, 2016 Posted by | Transport/Travel | , , | 3 Comments

A Trip To Aylesbury Vale Parkway Station

Aylesbury Vale Parkway station is one of Chiltern Railway’s termini in Buckinghamshire.

It is on the London to Aylesbury Line with services to Marylebone via Amersham, with a journey time of five minutes over the hour.

Plans also exist for the station to be calling point on the proposed service between Marylebone and Milton Keynes. The plans for the station in Wikipedia say this.

East West Rail plans to extend passenger services northwards to Bletchley and Milton Keynes by 2019 using parts of the former Varsity Line. The platform has been built to accommodate a second track if ever implemented, which would create an island platform. At present trains (currently run only as specials onBank Holidays) between Aylesbury and Quainton Road cannot serve Aylesbury Vale as there is no platform on the through route.

The track between Aylesbury and the new station was upgraded to continuous welded rail with a maximum line speed for DMU passenger trains of 60 mph (97 km/h). It is proposed that when services are extended to the north, trains will run via High Wycombe and not Amersham. Trains currently serving the station will thereafter terminate at Aylesbury.

These are some pictures I took of the station.

It is just a simple affair with a bus stand, car parks and the usual facilities, that appears will be soon surrounded by houses.

Chiltern Railways And Electrification

Before discussing how services will link up and down the London to Aylesbury Line, I will look at Chiltern Railways and electrification.

Under Developments and Announcements in the Wikipedia Entry for the East West Rail Link, this is said.

On 10 January 2013 Network Rail announced its intention to construct the western section between Bedford and Oxford, Aylesbury and Milton Keynes, as part of their five-year strategic business plan (2014–2019). The target date for train services to be operational on this section is December 2017. Electrification of the line between Oxford and Bedford was also included in the budget and target completion date was March 2017.

So electrification of the East West Rail Link is included in the project, even if the dates in the announcement are very much out of date now.

Given the following facts about the Chiltern Main Line, I believe it is likely that at some point, everybody will look seriously at providing electric trains from Marylebone to Birmingham Snow Hill station.

  • The line has a close relationship with the East West Rail Link and other electrified or soon-to-be electrified lines.
  • Chiltern finds it difficult to acquire more diesel-powered trains to fulfil their ambitions.
  • Chiltern would like to run faster, larger, more efficient and greener electric multiple units.

Under Electrification in the Wikipedia entry for Chiltern Railways, this is said.

No section of the line is electrified, but in 2010 the chairman of Chiltern Railways, Adrian Shooter, indicated that electrification is being considered, though not in the immediate future. He added: “We could do some very interesting things with high-acceleration EMUs and possibly some further infrastructure work.

At some time in the next ten years, we’ll probably see electric trains between Marylebone and Birmingham Snow Hill.

But there will not necessarily be full electrification, as I believe IPEMU technology will change the way electrification is carried out.

Consider as well that the Chiltern Main Line is just one hundred and eighty kilometres long and the current maximum range of an IPEMU is being quoted as about sixty miles or just under a hundred kilometres, so with the following electrification.

  • Marylebone and for perhaps twenty miles or so to handle local metro services.
  • Birmingham Snow Hill, Birmingham Moor Street and the Snow Hill Lines, where there are local metro services.
  • Banbury to Leamington Spa and other places, so that freight trains powered by bi-mode Class 88 locomotives,  could use the line efficiently.

The Local lines from Marylebone and the Snow Hill Lines would be electrified using the techniques in A Modern Electrified Metro Network Using IPEMU Technology

IPEMUs would be able to run the full length of the line without the need for full electrification in an environmentally-sensitive area, inhabited by touchy people.

Northward To The East West Rail Link And Milton Keynes

Northward from Aylesbury Vale Parkway station, the Wikipedia entry for East West Rail Link, says that the line will be single track and allow 90 mph working. But as my pictures and a quick gander on Google Maps show, there is quite a bit of space available around the current single track. So as the East West Rail Link seems to be being designed as a double-track 100 mph railway, with full electrification, I think there are three possible options between the East West Rail Link and Aylesbury Vale Parkway and Aylesbury stations.

  • Double-track 100 mph with electrification.
  • Single-track 90 mph with electrification.
  • Single-track 90 mph without electrification.

I think the line will be built with some form of electrification, so that electric trains can run from Aylesbury to Milton Keynes.

The line is also used by some freight trains, so double-track might be a good idea.

Aylesbury To London Via Amersham

Returning from Aylesbury today, I was surprised to see that the train ran from Amersham to Harrow-on-the-Hill on the same tracks as the Metropolitan Line. In fact for sixteen  of the thirty-nine miles of the line from Marylebone to Aylesbury Vale Parkway, the line has full London Underground electrification.

Amersham to Aylesbury is about fifteen miles, with the distance between the two Aylesbury station being four miles, which means that Harrow-on-the-Hill to Marylebone is just a few miles.

So if an IPEMU could use the London Underground’s rail-based electrification, starting at Milton Keynes the train would easily arrive at Harrow-on-the-Hill with a full battery, that would take the train to Marylebone and back.

I don’t believe that the technical problems of an IPEMU starting at any station between Aylesbury and Milton Keynes and going to Marylebone and back are insurmountable.

Aylesbury To London Via High Wycombe

This uses the single-track Aylesbury to Princes Risborough Line, which is about a dozen miles long, before running to Marylebone along the Chiltern Main Line, which is another forty miles or so.

So some electrification will be needed.

According to Wikipedia, Chiltern have various plans to improve their network.

  • The restoration of the quadruple track between South Ruislip (Northolt Junction) and West Ruislip, allowing trains to call at both stations without blocking the line. Triple track currently exists at West Ruislip, with the up platform loop still in situ, and at South Ruislip, with the Down Main through line also in situ. This would involve the reconstruction of the new down platform at West Ruislip, and the reconstruction of the up platform at South Ruislip. This ‘Chiltern Metro’ service was not programmed into the last round of franchising agreements.
  • Restoration of fast through lines at Beaconsfield as part of a longer-term aspiration for a 90-minute journey time between London and Birmingham
  • Double-track the line from Princes Risborough to Aylesbury.
  • New Chiltern Metro Service that would operate 4+tph for Wembley Stadium, Sudbury & Harrow Road, Sudbury Hill Harrow, Northolt Park, South Ruislip and West Ruislip. This would require a reversing facility at West Ruislip, passing loops at Sudbury Hill Harrow, and a passing loop at Wembley Stadium (part of the old down fast line is in use as a central reversing siding, for stock movements and additionally for 8-car football shuttles to convey passengers to the stadium for events)

Some would also fit well with adding electrification, so I think that enough electrification can be added to allow an IPEMU to go from Aylesbury to Marylebone.

Oxford To London

Given that there will be electrification between Oxford and Bicester Village stations courtesy of the East West Rail Link, IPEMUs could start at Oxford and reach Princes Risborough, from where they used the same methods as Aylesbury and Birmingham services to get to London.

This article on the BBC, which is entitled Cowley line passenger train service planned for Oxford, says this.

Chiltern Railways has revealed plans for a passenger service to run on the Cowley branch in Oxfordshire.

The line, currently only used for freight, would see two new stations on the route at Oxford Science Park and Oxford Business Park.

So if this service goes to London, it would certainly be another job for an IPEMU.

Watford Junction To Amersham And Aylesbury

The Croxley Rail Link has been designed so it can have a link to Amersham. Wikipedia says this about the link.

A further proposal is to use the existing but seldom-used Metropolitan line chord which allows trains to run from Watford towards Amersham via Rickmansworth. In conjunction with the Croxley Rail Link, this route would allow direct services between Watford Junction and Amersham, thus improving local public transport in Hertfordshire and Buckinghamshire.

These are pictures I took, as the train passed the  junction of the branch line to Watford.

It would certainly be a new use for a substantial piece of infrastructure, but would it do much more than link Amersham to Watford Junction.

Chiltern Trains could run an IPEMU from Watford Junction to Aylesbury Vale Parkway calling at all stations, but as passengers could also get to Aylesbury from Milton Keynes, I wonder if it would be well used.

 

April 6, 2016 Posted by | Transport/Travel | , , , , , , , , | Leave a comment