The Gibbs Report, looks in detail at services out of Moorgate station on the Northern City Line in detail.

Note that current plans for this line include.

It could also be rebranded as the Great Northern Metro.

Chris Gibbs flags up various issues with this service. He says this about the infrastructure.

25 new Class 717 six-car trains are being built by Siemens as a dedicated fleet for this route, and will be maintained by GTR at their Hornsey Depot. The line between Drayton Park and Moorgate is a former underground line transferred to BR in 1976 and partly converted for main line trains.

It retains various Underground characteristics, such as third rail electrification with a fourth return rail, and tripcocks at all signals, and I believe Old Street and Moorgate stations are owned by London Underground as part of shared stations, and are in need of modernisation. The track and signalling is owned and operated by Network Rail.

I would add a personal observation. Highbury and Islington station is a station where the below-ground platforms are in desperate need of improvement and step-free access. Over the last year or so, with GTR’s labour troubles, the operation of the station at times, has not been smooth, much to the exasperation of London Underground/Overground staff.

Chris Gibbs also notes several issues with the employment of staff after 2018.

Other current Great Northern services run between Kings Lynn, Cambridge, Peterborough and Kings Cross, and these will be part of the Thameslink operation from 2018, with most services continuing to destinations south of London and a few running to Kings Cross. I understand Great Northern drivers will be “temporarily” split between Metro and Thameslink in 2017 to avoid them all having to learn the cross London routes and Class 700 trains, so there may then be a some division for TUPE purposes.

At present it is proposed not to initially train about 100 drivers on Class 700 trains, spread across several locations, and it is proposed to open new drivers depots, for example at Welwyn Garden City and Finsbury Park. These proposals have not yet been approved by DfT, and recruitment has not yet begun. However there is still risk that splitting the driver workforce, who currently enjoy variety of work, may be unpopular, and more work is required to evaluate this. All Great Northern Metro services are currently DOO.

It looks like a disaster waiting to happen to me.

He finishes his discussion on the Great Northern Metro like this.

I believe there is an option to transfer the Great Northern Metro operation to TfL and it’s London Overground concession in 2018. If TfL / the London Overground concessionaire were to take the lead in this transfer, and the implementation of the new trains and service, this could reduce risks associated with the Thameslink programme, led by GTR. 

However to do this, a decision should be made immediately, and discussions commenced with
TfL, GTR and the London Overground concessionaire.

Personally, I think that this would be a very good idea.

In this area of London, we have three stations that need to be dramatically improved; Old Street, Essex Road and Highbury and Islingtont.

All are on the Northern City Line and they could start with a deep clean at Essex Road, which was probably cleaner when it opened in the same year my father was born.

But being serious, these three stations could be serious development opportunities.

  • Highbury and Islington is a major interchange that hasn’t been rebuilt properly since it was bombed in World War 2 and was changed on the cheap to squeeze the Victoria Line through underground.
  • Essex Road could also be redeveloped with a modern step-free station underneath.
  • Old Street is now surrounded by towers and the road layout is being simpified, so why not put a massive tower on the site and build a modern station underneath?

Having only one operator at the stations must surely ease redevelopment.

I think if the split between GTR and the Great Northern Metro was thought through properly, there could be advantages all round.

  • All services North of Welwyn Garden City on the East Coast Main Line and the Cambridge Line would be provided by GTR.
  • All Hertford Loop Line services would be provided by London Overground.
  • All Hertford Loop Line stations would be managed by London Overground.
  • All stations South of Welwyn Garden City on the East Coast Main Line would be managed by London Overground.
  • A turnback platform would be built at Stevenage.
  • Welwyn Garden City and Stevenage stations would be updated to allow easy interchange between GTR and Great Northern Metro services.
  • Alexandra Palace station is developed, so that cross platform interchange is possible between GTR and Great Northern Metro services.

It certainly looks like a properly integrated 100 mph suburban rail route can be built to Stevenage, with similar fleets of 100 mph Class 700 trains and Class 717 trains on Thameslink and the Great Northern Metro respectively.

The East Coast Main Line would work as now.

  • Great Northern Metro services between Moorgate and Welwyn Garden City
  • Outer suburban services between Kings Cross and Stevenage, Peterborough and Cambridge.
  • In 2018, Thamelink will link St. Pancras to Stevenage, Peteborough and Cambridge.

On the Hertford Loop Line, there would just be a Great Northern Metro service between Moorgate and Stevenage, via Hertford North.

There could be possible problems and questions.

  • Would residents of Hertfordshire, object to services being controlled by the London Mayor?
  • Who would pay for the required turn-back platform at Stevenage?
  • Could London Overground absorb the route without too many problems?
  • Would there be enough paths on the East Coast Main Line?
  • Where would the depot for the Class 717 trains be located?
  • How will Siemens respond to the change of operator for their Class 717 trains?

But there are some other factors in favour.

  • The Great Northern Metro service on the Hertford Loop Line would effectively be an independent double-track railway capable of handling as many six-car Class 717 trains as were desired. The current three trains per hour (tph) is probably way below the theoretical capacity, which is probably determined by the single platform at Stevenage.
  • London Overground successfully integrated the Lea Valley Lines into their operation.
  • London Overground and the Great Northern Metro both work under DOO.
  • Hopefully, Transport for London have the knowledge to integrate the Class 717 trains into the tunnels to Moorgate. But they have an excellent museum!
  • London Overground’s working practices would appear to be similar to those on the Great Northern Metro.
  • London Overground’s station manning policies are better for passengers and may even be better for staff, who always seem to be courteous and enjoying their work.

But surely the biggest thing in the transfer’s favour, is that it gives responsibility to new train introduction and updating of the Great Northern Metro to another operator, who has a proven record in this field, so that GTR can concentrate on launching Thameslink services.

Collateral Benefits Of Updating Great Northern Metro Services

After train replacement the Great Northern Metro will be run by modern 100 mph trains, as opposed to 75 mph scrapyard specials.

Currently, the Class 313 trains take the following times.

  • Moorgate and Hertford North – 45 minutes – 13 stops
  • Moorgate and Letchworth Garden City – 79 minutes – 16 stops.
  • Moorgate and Stevenage – 63 minutes – 15 stops.
  • Moorgate and Welwyn Garden City – 49 minutes – 16 stops

As modern trains can save a minute or two on each stop, there must be the possibilities of faster services, with the serious possibility of Letchworth Garden City within an hour from Moorgate, with the new 100 mph Class 717 trains.

Stevenage would certainly be well within the hour and I suspect that because of the extra speed an additional fourth train could be run to both Hertford North and Welwyn Garden City, with all Hertford North trains running on and terminating at Stevenage, once the turnback platform is built.

To run four tph each route would require just eight trains or sixteen trains in total.

If you split the order for twenty-five trains into two, that would mean twelve trains would be available for each route, which are enough trains to have the following service.

  • 6 tph – Moorgate to Welwyn Garden City
  • 6 tph – Moorgate to Stevenage via Hertford North

These are the sort of frequencies that train operating companies like to run in South London.

Alexandra Palace to Moorgate would have a massive twelve tph.

The current timetable handles this frequency in the Peak, so it could be possible all day, with very little work needed on the infrastructure. London Underground would probably laugh at 12 tph, when you consider the Northern and Victoria Lines handle three times as many trains to a two platform below ground terminal.

But is it really needed?

If you look at the timing of the fast Class 387 trains between Stevenage and Finsbury Park, they take around twenty minutes going fast down the East Coast Main Line, as against the Class 313 trains which take forty-four minutes using the Hertford Loop Line. On a rough estimate the new Class 717 trains might be able to do this trip in perhaps twenty-five minutes on an updated Hertford Loop Line.

A fast high-capacity service on this route that has been neglected, must be capable of development with perhaps a Park-and-Ride and a couple of new stations.

It may not be a bad idea to update the Hrtyford Loop Line with modern signalling and to allow faster running, as surely if the normal trains on the loop were modern 100 mph units, then extra paths could be found to act as diversion routes for the bottleneck of the double-track Digswell Viaduct.

It’s amazing how faster trains can unlock the potential of a rail route.

Conclusion

Chris Gibbs has made an interesting proposal.

There are good reasons to transfer the Great Northern Metro to London Overground.

  • London Overground have the expertise to introduce the new trains.
  • Transport for London have the expertise to redevelop the stations on the route at the Southern end.
  • GTR will be able to concentrate on Thameslink
  • Moorgate, Old Street, Essex Road and Highbury and Islington stations become Transport for London-only stations.
  • London would gain a new Metro line between Moorgate and Alexandra Palace via Highbury and Islington and Finsbury Park, that extends into Hertfordshire and has a frequency of at least twelve tph.
  • Crossrail gets another North-South feeder line.
  • Highbury and Islington and Finsbury Park will become high quality interchanges.
  • The Hertford Loop Line can be developed independently of Thameslink and the East Coast Main Line to be a high-capacity North-South Metro from North London to Stevenage.
  • The Victoria Line gets a cross-platform connection to the Great Northern Metro for Crossrail at Highbury and Islington.

The only problem, is that it might remove some of the reasons for extending Crossrail 2 to New Southgate.

Overall it strikes me that GTR have been working totally without any vision or any idea about how their new trains will transform the Great Northern Metro.

 

July 8, 2017 - Posted by | Travel | , , , , , , , ,

No comments yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s