The Anonymous Widower

Midland Metro’s £149m Extension To Open In 2021

The title of this post is the same as an article on Global Rail News.

This is the first two paragraphs.

A 2km extension of Transport for West Midlands’ Midland Metro has been given the go ahead in the UK.

The £149 million extension will link Grand Central, in Birmingham’s city centre, with the southern suburb of Edgbaston with five new stops served by up to 10 trams an hour at peak times.

This article in the Birmingham Mail, gives more details.

The locations of five new stops to be built in the next phase of the Midland Metro extension have been confirmed.

The line is being taken an additional 1.2 miles from outside New Street station to Hagley Road.

As previously mooted, there will be stops outside Town Hall Birmingham and at Centenary Square, in Broad Street, where passengers can access the ICC, Library of Birmingham and new HSBC UK head office.

The other stops will be opposite Brindleyplace at the corner of Granville Street, outside the Cineworld cinema in Broad Street and in front of office block 54 Hagley Road, close to the Morrisons supermarket.

I think that the design of the route has been kept fairly simple and also involves some pedestrianisation.

From New Street To Broad Street

This Google Map shows the first section of the route from the current terminus of the Midland Metro at Grand Central outside New Street station to the start of Broad Street.

The blue dot outside New Street station shows the Grand Central tram stop.

The route goes up the hill, to the stop at Birmingham Town Hall before twisting to go down Broad Street to stop in Centenary Square.

Along Broad Street

This Google Map shows Broad Street from the Symphony Hall to the Cineworld Cinema.

Three stops are on this section.

  • Brindleyplace
  • Granville Street
  • Cineworld Cinema

This visualisation shows the route at the cinema.

Note.

  • The view is looking towards Five Ways.
  • Overhead electrification is used on this section.

Will the route be pedestrian only?

Through Five Ways Roundabout And On To 54 Hagley Road

This Google Map shows the last section of the route.

The roundabout looks to have plenty of space to thread the tram lines through.

54 Hagley Road is the office tower in the South West corner of the map, on the South side of Hagley Road. Again there seems plenty of space.

Sections Without Wires

The route bwtween Grand Central and Hagley Road will use a mixture of overhead wiring and onboard energy storage to power the trams.

It has been stated that in the historic centre, the trams will not use wires, as in this visualisation.

It appears that there will be wired sections either side of this section without wires in the centre.

This will ensure, that the onboard energy storage is well-charged before entering the section.

Cost And Timescale

Comments on the Birmingham Mail article, think the line is expensive and it will take a long time to build.

Looking at the route the two tricky sections are around Paradise Street and Five Ways, as there will need to be a lot of reconstruction of the road network.

But the sections running on onboard energy storage should be a lot easier to build.

At £149 million for 3.38 kilometres, the extension will cost £44 million a kilometre.

Manchester Metrolink’s Trafford Park Line will cost £350 million for 5.5 kilometres or £64 million a kilometre.

Is the lower cost/km. of the Birmingham Extension due to the sections without wires?

I suspect, it’s probably more complicated than that!

Conclusion

It looks a good scheme.

My only reservation is what will drivers think about a pedestrianised Broad Street, if that is part of the design.

 

 

 

September 1, 2017 - Posted by | Travel | , , ,

No comments yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s