It’s all about funding and probably the Government not wanting to finance all of the large rail projects.

  • HS2
  • Crossrail 2
  • Northern Powerhouse Rail
  • East West Rail

HS2 is funded and underway and the last two projects are being sorted, but the cost of Crossrail 2 is too much to digest.

I have believed for some time, that Crossrail 2 is a number of separate projects.

  • Increasing capacity on the Waterloo suburban lines
  • Increasing capacity on the Lea Valley Lines
  • Creation of the mega-station at Euston-St. Pancras
  • New trains
  • The high capacity central tunnel

I will now look at each in detail.

Increasing Capacity On The Waterloo Suburban Lines

In An Analysis Of Waterloo Suburban Services Proposed To Move To Crossrail 2, I showed that it would be possible to run a service with Crossrail 2’s characteristics terminating in Waterloo.

I said the following were needed.

  • More platform capacity in Waterloo.
  • Modern high-performance 100 mph trains like Class 707 trains or Aventras.
  • Some improvements to track and signals between Waterloo and Wimbledon stations.
  • Wimbledon station would only need minor modifications.
  • A measure of ATO between Waterloo and Wimbledon stations.

Much of the infrastructure works have been completed as I reported in It’s All Over Now, Waterloo!.

All it needs is Bombardier to build the new Class 701 trains for South Western Railway.

Increasing Capacity On The Lea Valley Lines

In Could A Lea Valley Metro Be Created?, I looked at the possibility of creating a Lea Valley Metro with the following characteristics.

  • Four-tracks between Tottenham Hale and Broxbourne stations.
  • Step-free stations.
  • Termination in the unused loop at Stratford.
  • 10-15 trains per hour.
  • Links to Crossrail, the Underground and Southeastern Highspeed services at Stratford.

I came to the conclusion it was very much possible.

Creation Of The Mega-Station At Euston-St. Pancras

In Should A Mega-Station Be Created At Kings Cross-St. Pancras-Euston?, I looked at this mega station project for Crossrail 2.

I came to these conclusions.

  • If Crossrail 2 is built, there will obviously be a mega station at Euston St. Pancras.
  • But I believe that all the other improvements that will happen before HS2 opens may well be enough to cope with the extra capacity needed.
  • Obviously though, any improvements must not compromise the building of Crossrail’s mega-station.

In Should A Mega-Station Be Created At Kings Cross-St. Pancras-Euston?, I proposed a four-level mega-station.

  • Surface level – National Rail and HS2
  • Sub-surface level – Circle, Hammersmith and City and Metropolitan Lines
  • Deep level – Northern, Piccadilly and Victoria Lines.
  • Very deep level – Crossrail 2

Lines would be connected by escalators, travelators and lifts going all over the place.

It would not be that different to the double-ended Crossrail station at Moorgate-Liverpool Street station, which I described in London’s First Underground Roller Coaster, except that it connects three stations instead of two.

This would enable Crossrail 2 to be bored through at a deeper level after Euston station had been rebuilt for HS2.

In terms of Crossrail 2, the creation of the mega station at Euston St. Pancras could be the last project to be completed.

New Trains

This should be the easy bit, as surely using the same Class 345 trains on Crossrail and Crossrail 2, would be an objective, if it were possible.

The High Capacity Central Tunnel

I’ve never built a tunnel, although my software; Artemis helped to build the Channel Tunnel, but I would suspect that building the central tunnel for Crossrail 2 will be easier than building that for Crossrail.

So many things like riding a bike or sex are a lot easier the second time.

There must be so many lessons from Crossrail that can be applied to Crossrail 2.

If all of the central stations on the tunnel, from Dalston to Wimbledon, where there is interchange with Crossrail 2 can be made tunnel-ready, then I don’t see why boring the central tunnel can’t be one of the last jobs to be started.

The tunnel boring machines would then just pass through the stations to link them all together.

It’s probably not as simple as that, but it is going to be a lot easier job than Crossrail.

The Importance Of The Victoria Line

I’ve never seen this said before, but one of the keys to building Crossrail 2 is the Victoria Line or Dear Old Vicky.

I believe the Victoria Line should be updated as follows to be as near the standard of Crossrail as possible, by using the existing trains, track and signalling  and by updating the stations.

  • Addition of the missing escalators and other features left out to save money in the 1960s..
  • Full step-free access at all stations.
  • Addition of new  entrances at Oxford Circus, Highbury and Islington and Walthamstow Central.
  • Better interchange with the Overground at Blackhorse Road and Walthamstow Central.
  • Better interchange with National Rail at Brixton, Vauxhall, Finsbury Park, Seven Sisters and Tottengham Hale.
  • Forty tph between Brixton and Walthamstow Central.

Forty tph may need a reversing loop at Brixton and an extra one-platform station at Herne Hill.

I believe that an update of this type and scale could be applied to the Victoria Line without causing too much grief for passengers. The work on the stations is necessary to cope with the current and increased passenger numbers and could be carried out in much the same way as the upgrade at Victoria station has been done in the last few years.

The Victoria Line would then offer a high capacity link between Tottenham Hale and Vauxhall prior to the building of Crossrail 2’s central tunnel.

Passengers from say Broxbourne to Hampton Court would take the following route.

  • Lea Valley Line from Broxbourne to Tottenham Hale – (10 tph)
  • Victoria Line from Tottenham Hale to Vauxhall – (>30 tph)
  • South Western Railway from Vauxhall to Hampton Court – (4 tph)

Two changes (both hopefully step-free) would be needed, but with improvement to the National Rail routes at both ends, it would be faster than now.

The Importance Of The Bakerloo Line

Ask TfL’s Journey Planner, which is the quickest way from Tottenham Hale to Waterloo and it gives the following route.

  • Victoria Line from Tottenham Hale to Oxford Circus
  • Bakerloo Line from Oxford Circus to Waterloo

There is a simple cross-platform interchange at Oxford Circus, with the two legs taking 16 and 8 minutes respectively.

Currently, the Bakerloo Line has a frequency of twenty-two tph and plans have been mooted, that will see this going to twenty-seven tph by 2033.

It looks like when combining an updated Victoria Line with the current Bakerloo Line, you get a excellent connection that can stand-in for the Crossrail 2 central tunnel between Tottenham Hale and Waterloo.

But the Bakerloo Line might be extended to Lewisham, so will this extension make the combined Victoria/Bakerloo route more important.

The extended Bakerloo Line is not planned to have a connection with Crossrail 2, so using the Victoria Line across Central London will probably be the fastest way from say Lewisham to Enfield Lock.

It looks to me, that the cross-platform interchange at Oxford Circus between the Bakerloo and Victoria Lines is more important than anybody thinks and will continue to be so.

The Splitting Of The Northern Line

TfL would like to split the Northern Line into two branches, but this can’t be done until Camden Town station is rebuilt around 2024.

The only effect this split will have on Crossrail 2, is it will give extra routes to Euston station, which may probably make it less important that Crossrail 2 is completed before HS2.

A Possible Timetable

This is very much speculation on my part.

  • 2020 – Improved Overground services to Cheshunt, Chingford and Enfield Town using new Class 710 trains.
  • 2021 – Increased Greater Anglia services on the Lea Valley Lines using new Class 720 trains.
  • 2021 – Waterloo suburban branches running at four tph using new Class 701 trains.
  • 2024 – Extended Camden Town station opens.
  • 2024 – Splitting of the Northern Line
  • 2024 – More capacity on the Victoria Line
  • 2025  – Increased services on the Lea Valley Line after four-tracking.
  • 2025 – Upgraded Euston station opens with better connection to the Underground.
  • 2026 – Old Oak Common statio opens
  • 2026 – HS2 opens to Birmingham

The Crossrail 2 central tunnel could be built, when traffic levels are predicted to be too much for the Victoria Line.

Conclusion

This analysis says to me that Crossrail 2 could be planned as a series of much smaller projects, that would give passengers benefits from the early-2020s and also ease the funding problems for the line.

But the analysis also says that if the central tunnel is not built before the 2040s, then the Victoria Line must be upgraded to create a high capacity link between Tottenham Hale and Vauxhall or Waterloo using the Bakerloo Line.

 

 

 

 

 

 

October 3, 2017 - Posted by | Travel | , , , , , , , ,

No comments yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s