Today was the first Monday of a new timetable and I took a trip to Rainham (Kent) station from London Bridge on the new Thameslink service,, before returning to Abbey Wood station.

Note.

  1. I took a picture at each station as we went out to Rainham.
  2. There is a lot of housing and commercial development going on by Dartford and Rochester stations.
  3. Thameslink are scheduled to run trains between Luton and Rainham (Kent) stations every thirty minutes.
  4. There were two Class 345 trains at Abbey Wood station.
  5. I went in a Class 700 train with eight-cars.

There was the odd cancelled train on the route, but what surprised me on the return journey, was that my train passed four Class 700 trains going in the other direction.

I must assume, that Thameslink were training more drivers for the route.

The Service I Took

The Thameslink service between Luton and Rainham, that I took from London Bridge to Rainham is a replacement for the Southeastern service between Charing Cross and Gillingham.

  • Both services use the same route between London Bridge and Gillingham.
  • Both services stop everywhere between London Bridge and Gillingham.
  • Both services are well-connected to other services at Abbey Wood (Crossrail), Woolwich Arsenal (DLR), Greenwich (DLR) and London Bridge (Northern and Jubilee).
  • The previous Southeastern service took 66 minutes between London Bridge and Gillingham,
  • The current Thameslink service is timetabled to take 82 minutes.
  • The Thameslink service takes over forty minutes to turn round at Rainham.

Given that the Thameslink Class 700 trains are 100 mph trains and the previous Class 465 trains are only 75 mph trains, I find it extraordinary that faster and more modern trains are delivering a slower service.

Complaints

There have been complaints about the new timetable, so I asked a couple of station staff, what they felt about the new Thameslink service from Luton to Rainham.

They seemed in favour and added, these points about the service.

  • It would help with getting the service out of trouble, when there were delays East of Rainham.
  • It gives a direct connection to Dartford.
  • The extra capacity will help.

The service to Rainham will surely act as a collector service for those changing to Crossrail at Abbey Wood.

Rainham to Bond Street with a change at Abbey Wood, should be under an hour and a half.

May 21, 2018 Posted by | Transport | , , , , | 2 Comments

Abbey Wood Station – 21st May 2018

Abbey Wood station has been progressing and I took these pictures.

The layout of the connecting bridges between the Crossrail and North Kent Line platforms is now clear.

  • At the London End, there is a simple footbridge, with steps to each pair of platforms.
  • At the Main Entrance End, there are wide steps and a lift between the station ticket hall and each pair of platforms.
  • The third bridge in the middle is the unusual one with wide steps and a single escalator to each pair of platforms.

I would assume, that the direction of the escalators is as follows.

  • In the Morning Peak, the North Kent Line escalator is set to Up and the Crossrail escalator is set to Down, to speed passengers from the North Kent Line to Crossrail.
  • In the Evening Peak, the Crossrail escalator is set to Up and the North Kent Line escalator is set to Down, to speed passengers from Crossrail to the the North Kent Line.
  • At other times with less traffic, both escalators would be set to Up.

I have seen a lot of station layouts all over the UK and Europe and never one like this.

I doubt, I’ve even seen a pair of platforms connected by three separate bridges too!

Could it be a design of genius to allow thousands of passengers to change between the two pairs of platforms in a short space of time?

Other station layouts that enable this rate of passenger transfer, like the interchange between Crossrail and the Central Line at Stratford station, arrange for a cross-platform interchange, with lines going in the same direction sharing a common platform.

But that arrangement would have been difficult at Abbey Wood, unless perhaps the Crossrail tunnel emerged closer to the station or a flyover or dive-under were to be built.

Both options would have required more space and would have been a lot more expensive.

The design of Abbey Wood station with its three footbridges and wide platforms, would appear to be a more affordable alternative.

Train Length

In some of the pictures, a Class 345 train is shown in one of the Crossrail platforms.

This is a full-length train, which is 205 metres long.

The pictures show just how long these trains are.

LED Lights On The Stairs

Three of the pictures in the bottom row, show the stair handrails with their light underneath.

I Like them.

 

May 21, 2018 Posted by | Transport | , , , | Leave a comment