The Anonymous Widower

Grab Handles On The Bakerloo Line

These pictures show the grab handles for safe entry and exit on the Bakerloo Line.

I do wonder, if the lack of handles, means a few more accidents, especially as there is a serious step-up at some stations.

February 13, 2019 Posted by | Transport | , , | 1 Comment

SA Zinc Mine To Be Converted To Compressed Air Energy Storage Facility

The title of this post, is the same as that of this article on Energy News Biulletin.

This is the first paragraph.

The Australian Renewable Energy Agency has announced a $6 million spend for company Hydrostar Australia to progress the nation’s first energy storage project using compressed air, with another $3 million provided by the South Australian government’s renewable energy fund.

There are other articles about energy storage in Australia, but then I suppose the country, can create lots of solar energy during the day and storing some of it is important.Using compressed air to store energy underground, seems increasing to be mentioned in the media.

 

 

February 13, 2019 Posted by | World | , , | 2 Comments

A406 North Circular Road ‘Most Congested’ In The UK

The title of this post is the same as that of this article on the BBC.

This is the first paragraph.

Motorists on the UK’s most congested road spend an average of two and a half days a year sitting in traffic.

The section of the A406 between the Hangar Lane Gyratory and Chiswick Roundabout has always been a dreadful road to drive on, as long as I can remember.

These pictures show typical traffic around eleven o’clock in the morning.

There does seem to be rather a lot of private cars and small commercial vehicles, with only a few HGVs and buses.

I would love to see an analysis of where these journeys start and finish.

Converting the road to a multi-lane dual carriageway wouldn’t be possible, as much of it is lined with private houses and even if it could be built it would just attract more traffic and would need to be widened even more.

There are circular routes further out of London like the M25 and the A412, but this road is an intractable problem.

Perhaps, it needs to be in a Congestion Charge Zone?

But is a solution at hand?

Crossrail

Crossrail, if and when it opens, will not be a direct solution, as it goes East-West and not North-South like the A406 through the area.

But it will give better access to Heathrow, which is a large traffic generator in West London.

Crossrail will link the following to the Airport.

  • Canary Wharf
  • The City of London
  • East London and Essex
  • South-East London and Kent
  • West End and Paddington

It will do little to help those in North and South London to travel to and from the Airport.

Old Oak Common Station And High Speed Two

The connection of High Speed two and Crossrail could make a difference.

  • Passengers using High Speed Two travelling to and from Heathrow, would have an easy route.
  • North and North-East Londoners will be able to use the North London Line with a change at Old Oak Common.
  • South Londoners will be able to use the West London Line with changes at Old Oak Common and Clapham Junction stations.

But Old Oak Common station won’t open under 2026 at the earliest.

It is needed now.

It also does nothing for those travellers in wide swathes of North-West London.

The West London Orbital Railway

If there is a trusty knight on an immaculate white charger, coming to the rescue, it could be the West London Orbital Railway, although as it would be stitched together from parts of existing and underused infrastructure, it has more of the Dirty Dozen about it.

There would be two routes.

  • West Hampstead Thameslink and Hounslow via Cricklewood, Gldstone Park, Neasden, Harlesden, Old Oak Common, Acton Central, South Acton, Brentford, Syon Lane and Isleworth.
  • Hendon and Kew Bridge via Brent Cross West, Gldstone Park, Neasden, Harlesden, Old Oak Common, Acton Central and South Acton.

The project has various advantages.

  • No substantial amount of new track will be needed.
  • It could be run using battery-powered trains.
  • Costs would be well under half a billion pounds.
  • It would connect to Thameslink and Bakerloo, Jubilee and North London Lines.

When Old Oak Common and High Speed Two open, it would have a direct connection.

I wrote about this railway in detail in New Railway Line For West London Proposed.

North Acton Station

As stated under Development in the Wikipedia entry for North Acton station, there may be reasons to rebuild the station to create a connection between the North London and Central Lines.

This Google Map shows the area around North Acton station.

Note.

  1. North Acton station in the North-West corner of the map.
  2. The North London Line running North-South to the right of the map.
  3. The Dudding Hill Line branches off the North London Line at the top of the map.
  4. The Central Line running East-West through North Acton station and under the North London Line.
  5. Threading its way through North of the Central Line is the Acton-Northolt Line.
  6. The Acton-Northolt Line could be developed by Chiltern Railways to give access to a second London terminal at Old Oak Common.

To develop a successful station at North Acton, that tied everything together would be a hard ask.

  • The bridge carrying the North London Line is very high.
  • The height would make step-free access expensive.
  • The frequency of trains on both the North London and Central Lines could be twelve trains per hour (tph).
  • At least, there does appear to be plenty of space from the map.

On the other hand, an architect with vision might be able to create a station that was affordable and provided high benefits for passengers.

Conclusion

There’s certainly potential in West London to improve the rail routes, although I’m not sure whether rebuilding North Acton station would be viable.

But, we should start building the West London Orbital Railway immediately.

 

 

 

February 13, 2019 Posted by | Transport | , , , , , , , , , | Leave a comment

A Tale Of Two Cities

This article in the Evening Standard is entitled Traffic Will Be Banned From Three Roads Leading To Bank Junction Following Cyclists’s Death.

  • Priority will be given to pedestrians and cyclists at Bank Junction in the City of London.
  • The works will be completed before the works at Bank station are completed in 2022.
  • There may be a street market in front of the Bank of England.
  • The taxi drivers don’t like it.

Compare this to the attitude of London’s other city;Westminster, which has recently, gone against the pedestrianisation of part of Oxford Street and the extension of a Cycle Superhighway.

February 13, 2019 Posted by | Transport | , , , , , | 2 Comments