If Crossrail Opens To Reading In December 2019, How Will It Terminate In Paddington?

If you look at the Services in the Wikipedia entry for Crossrail, the services on the Western Branch are the following in trains per hour (tph).

  • Reading and Abbey Wood (5 stops) – Two tph in the Peak, None in the Off-Peak
  • Reading and Abbey Wood (12 stops) – Two tph all day
  • Maidenhead and Abbey Wood (10 stops) – Two tph all day
  • Heathrow Terminal 4 and Abbey Wood (6 stops) – Four tph all day
  • Heathrow Terminal 5 and Abbey Wood (6 stops) – Two tph all day

If these services terminate in Paddington station, then the station must be able to handle twelve tph in the Peak and ten tph at all other times.

Perhaps two platforms could be used as follows.

  • Reading and Maidenhead services handling six tph in the Peak and four in the Off Peak.
  • Heathrow Terminal 4 and Heathrow Terminal 5 services, handling six tph all day.

Or to give a bit of spare capacity and make it easier for passengers, three platforms could be used as follows.

  • Reading and Maidenhead services handling six tph in the Peak and four in the Off Peak.
  • Heathrow Terminal 4 services, handling four tph all day
  • Hesthrow Terminal 5 services, handling two tph all day

For convenience, services could terminate in the two Northernmost platforms 12,and 14. 13 hseems to have disappeared.

  • These platforms have their own short gate line.
  • They are on the same side of the station, as the slow lines that Crossrail will use to leave the station.
  • Platform 14 is 164 metres long, with platforms 11 and 12 longer.

Could these two platforms be turned into a self-contained Crossrail station?

  • Each platform could handle six tph.
  • I don’t think full-length nine-car Crossrail trains could be used, but seven-car trains could fit a 164 metre platform.
  • The lighting needs to be improved.
  • If these platforms could be used for exclusively for Crossrail, there would be no crossing of tracks outside the station involving Crossrail trains.
  • It would be convenient for passengers as they’d just go to the Crossrail station and through the gate.

But above all, there would not be a lot of work needed to create a Crossrail station.

Unless it was decided to make all platforms capable of handling full-length trains. But hopefully, it would only be needed for a couple of years.

Conclusion

Platform 12 and 14 at Paddington could be converted into a two-platform Crossrail station handling seven-car Class 345 trains, at a frequency of twelve tph, with its own gate line.

 

 

 

April 20, 2019 - Posted by | Transport | , , , , ,

No comments yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.