Should Phase One Of High Speed Two Go To Birmingham Or Crewe?

The important Crewe station is currently planned to be reached from London in Phase 2a of High Speed Two, with the first train scheduled for 2027, according to Wikipedia.

There have been changes over the years and the delivery of the line at Crewe was brought forward by a few years, so that now it is just twelve months after the line opened to Birmingham.

So is it better that Phase 1 of High Speed Two goes to Birmingham or Crewe?

The Route Of High Speed Two Between Birmingham And Crewe

This map clipped from the High Speed Two web site, shows the route between Birmingham and Crewe.

Note.

  1. Phase 1 is shown in dark blue
  2. Phase 2a is shown in a lighter blue.
  3. Phase 2b is shown in orange.
  4. Crewe is in the North-West corner of the map.
  5. Of the two routes in the middle Phase 2a is to the East with the West Coast Main Line to the West.
  6. Birmingham is in the South-East Corner of the map, where two stations are shown; Birmingham Curzon Street in the West and Birmingham Interchange slightly to the South.

This second map, shows High Speed Two to the East of Birmingham.

Note.

  1. The colours are the same.
  2. The Eastern leg to Nottingham and Leeds, which is shown in orange, goes off to the North-East.

This third map shows the route around Lichfield.

Note.

  1. Phase 1 is shown in dark blue
  2. Phase 2a to Crewe is the branch going North and is shown in a lighter blue.
  3. The other branch going to the North West is the existing West Coast Main Line.

This fourth map shows the routes between Lichfield and Crewe

Note

  1. The colours are the same.
  2. Phase 2a of High Speed Two is the straighter route to the East.
  3. The more curvy route is the existing West Coast Main Line.

This fifth map shows the section of the route through Crewe.

Note.

  1. At the North of the map, the blue line is the West Coast Main Line and the orange line is the High Speed Two route to Manchester.
  2. Through Crewe the two lines share a route and may even share tracks.
  3. At the South of the map the High Speed Two route is on the East, with the West Coast Main Line to the West.

Click here to access High Speed Two’s interactive map, that I used to obtain these maps.

 

Phase One Services

Currently the following services are planned for Phase One of High Speed Two.

  • Three trains per hour (tph) – Birmingham Curzon Street, via Old Oak Common (OOC) and Birmingham Interchange.
  • Three tph – Birmingham Interchange via OOC.
  • Two tph – Liverpool Lime Street via OOC, Stafford (1tph), Crewe (1tph) and Runcorn
  • Three tph – Manchester Piccadilly via OOC, Wilmslow (1tph) and Stockport
  • One tph – Preston via OOC, Crewe, Warrington Bank Quay and Wigan North Western
  • One tph – Glasgow Central via OOC and Preston

Summing these up, the following totals are calculated.

  • 6 tph – Birmingham Interchange
  • 2 tph – Crewe
  • 2 tph – Preston

Most other stations get two tph or less.

Birmingham Or Crewe?

In the following sections I will discuss various points.

Service Between Euston And Stafford

There is an interesting point shown up by the maps and the proposed services for Phase One.

Trains using High Speed Two won’t be able to call at Stafford unless they take a diversion along the West Coast Main Line. So after Phase 2a has been built between Lichfield and Crewe, Stafford could lose its High Speed Two service, unless they use the classic route.

Birmingham Interchange Station

Birmingham Interchange station will be unaffected by the decision of the terminus of Phase 1 of High Speed Two.

  • It will be a Parkway station, with probably lots of parking.
  • It will be connected to the National Exhibition Centre, Birmingham International station and Birmingham Airport by means of a people mover.
  • All High Speed Two services go through the station and six tph are proposed to stop in Phase 1.
  • The West Midlands Metro could serve the station.
  • It will be thirty-eight minutes from London. Stansted Airport is fifty and Gatwick is around thirty!

I suspect that the time to and from London and a four-hundred metre long train every ten minutes, will mean that this will be a very busy station.

  • Will Londoners treat Birmingham Airport, as a London Airport?
  • Motorways to the East of Birmingham could mean the West Midlands treats the station as a Park-and-Ride station for London.
  • Birmingham International station is a well-connected station with five platforms.

This station could become the busiest in the UK.

Birmingham Curzon Street Station

Birmingham Curzon Street station will be an unusual station for the UK, in that will be a city-centre terminal station running East-West, with services going both North and South, using a junction with the main High Speed Two.

  • It will have seven platforms.
  • It will be a short walk to Birmingham Moor Street station.
  • It will have a stop on the West Midlands Metro line between Digbeth and Grand Central

Birmingham are hoping the station will be a catalyst for redevelopment of the area around the station.

After Phase 2 of High Speed Two services to the South are planned to include.

  • Three tph – Euston via Birmingham Interchange and OOC.
  • One tph – Birmingham Interchange direct

The hourly shuttle between the two stations makes up the service between them to a Turn-Up-And-Go frequency of four tph.

After Phase 2 of High Speed Two services to the North are planned to include.

  • One tph – Stafford or Crewe direct
  • One tph – Manchester Piccadilly via Crewe and Manchester Interchange
  • Two trains per day – Preston via Crewe, Manchester Interchange and Wigan North Western
  • Two trains per day – Carlisle via Manchester Interchange, Wigan North Western and Preston.
  • One tph – Glasgow via Warrington Bank Quay, Wigan North Western, Preston and Carlisle.
  • One tph – Edinburgh via Crewe, Warrington Bank Quay, Wigan North Western, Preston and Carlisle.
  • One tph – Leeds via East Midlands Hub
  • One tph – York via East Midlands Hub and Sheffield
  • One tph – Newcastle via York

Summing up four tph go via the Western leg and Crewe to the North and three tph go via the Eastern leg and East Midlands Hub.

I suspect it is all about balancing the services between the three legs of High Speed Two.

  • London and Birmingham
  • Birmingham and North West England and Scotland
  • Birmingham and North East England.

High Speed Two has been designed for fifteen tph running into Euston, so if all parts of the route can handle that number of trains, there must be a lot of scope to add extra services.

Birmingham Curzon Street with its seven platforms would balance all the services and probably help to sort things out in times of disruption.

Between Birmingham International Station And Lichfield

The maps show that this section must be built to connect High Speed Two to the West Coast Main Line just to the North of Lichfield Trent Valley station on the Trent Valley Line, as there is no other possible connection between the two routes.

This map clipped from the High Speed Two map, shows where the two lines join.

It is obviously designed for speed.

I estimate that the distance between Birmingham Interchange and this junction is not far short of twenty miles.

Between Lichfield And Crewe Station

Along the West Coast Main Line, the distance is around forty-two miles, but the straighter route proposed for High Speed Two could be a few miles shorter and several minutes faster.

If Phase 1 of High Speed Two were not to be built, trains would have to share the West Coast Main Line through Stafford station.

Currently, Stafford station can have as many as fifteen tph through the station.

Phase 1 of High Speed Two will have these trains going North of Birmingham Interchange station.

  • Two tph – Liverpool Lime Street
  • Three tph – Manchester Piccadilly
  • One tph – Preston
  • One tph – Glasgow Central

Which is a total of seven tph, with one tph stopping at Stafford.

I doubt they could all be squeezed through Stafford.

There would certainly be no space for any trains starting at Birmingham Curzon Street.

This is a very simple example of the capacity problems on the West Coast Main Line, which can only be solved by extra tracks to the North.

Crewe Station

Consider these points about Crewe station.

  • It is not of a design that reflects its status.
  • Currently, it handles 23 tph, that go all over the North West and much further.
  • Phase 1 of High Speed Two would add another seven tph
  • New services are planned.
  • A rebuilding of the station would surely improve both capacity and operational efficiency.
  • Looking at the fifth of the maps, it appears that the West Coast Main Line and High Speed Two share a corridor , if not tracks, through Crewe station.

For all these reasons, I am convinced that if High Speed Two passes through, then the station will need a rebuild.

So it looks like whether High Speed Two goes ahead or not, Crewe station will need an expensive rebuild.

Extra High Speed Two Services Through Crewe

Once Phase 2a has been completed, this will allow some extra Phase 2 services to be run along the route from Euston.

  • Two tph from one tph – Glasgow Central via OOC, Birmingham Interchange (1tph), Preston and Carstairs
  • Two tph – Edinburgh via OOC, Birmingham Interchange (1tph), Preston, Carstairs and Edinburgh Haymarket

I suspect these might run as a pair of trains as far as Carstairs and split and join there.

There will also be extra services between Birmingham Curzon Street, Crewe and Stafford to Edinburgh, Glasgow, Liverpool Lime Street, Manchester Piccadilly and Preston.

It is worth noting, that when all the services going North from Birmingham are summarised, you get the following.

  • Four tph – Manchester Piccadilly
  • Three tph – Liverpool Lime Street
  • One tph – Preston
  • Four tph – Glasgow/Edinburgh
  • One tph – Stafford or Crewe

It looks a bit complicated North of Crewe, but it will create a frequent service between Crewe and Scotland.

High Speed To Chester

It should also be noted, that if between Crewe and Chester were to electrified, High Speed Two trains could serve Chester.

  • Chester is a major rail interchange for the Border areas between England and Wales, North Wales and the Wirral.
  • It is also connected to Merseyrail.
  • Chester is an important tourist destination, with the city centre close to the station.

Electrification might also allow battery-electric versions of Avanti’s new Hitachi trains to serve some of their routes, without using diesel.

This simple example of Chester, says to me that opening High Speed Two to Crewe could allow extra services to be developed.

Conclusion

It appears from this analysis, that the only advantage of not building Phase 2a is that about forty miles of line between Lichfield and Crewe can be pushed back for a few years.

 

 

 

 

 

January 20, 2020 - Posted by | Transport/Travel | , , , , , ,

3 Comments »

  1. One thing that is lacking from the plans is what will happen to the services on the lines which are freed up by the moves to HS2. There is a vague promise that more local services will be possible but I think if the government actually spelled out what they think could happen it might help to make the case for HS2. Do you know if anyone has had a go at that?

    Comment by Kevin Roche | January 24, 2020 | Reply

    • I saw plans for London to the Midlands a few years ago and some of the paths were to be given to London Midland to serve other places from London.
      But I think the effects of HS2 will be more than the obvious. HS2 will be digitally signalled with ERTMS and I suspect that for Phase 2, al lines used by HS2 trains will be so equipped. They are already installing ERTMS on the ECML and I wouldn’t be surprised to see by 2026, installation has started on the WCML and MML.
      This will allow 140mph running an will further increase capacity.

      I can see a lot of extra services being squeezed in.

      There will also be a lot of new trains, with for example the Pendolinos being replaced by perhaps even classic-conpatinle HS2 trains. Surely, running a few early between London and Manchester would be the best way to fully test and debug the trains. After all at 200 metres, they are shorter than nine-car Pendelinos at 216 metres or so.

      There could also be 140 mph battery or hydrogen trains to make full use of the ERTMS-eqipped WCML, MML and ECML.

      Comment by AnonW | January 24, 2020 | Reply

  2. just to update specifically on Crewe:

    2a was approved last year, and includes 2 improvements in Crewe: extending platform 5 (southbound main line) for the longer HS2 trains; and building a new platform on the so-called independent lines to the W of the current station. These are used solely by freight atm, and bypass the station with, most importantly, a dive under the main line to the Manchester line. This will enable Man-Shrewsbury services, which currently cross over the main line, to use this dive-under. https://www.openrailwaymap.org/?style=standard&lat=53.08720713325794&lon=-2.4320340156555176&zoom=15 shows this: trains from Shr currently join the main line and then branch off to Man at the jcn N of the station. In future, they will turn left after Gresty and run on the most westerly line to the new platform, continuing under the main line to Man. This is such a sensible idea, I wonder why it wasn’t done years ago.

    The revised proposal for 2b has now been formally submitted to parliament
    https://mediacentre.hs2.org.uk/news/hs2s-journey-north-accelerates-as-bill-extending-the-route-to-manchester-is-handed-to-parliament This does not include the Golborne link on to Wigan, which is being reviewed in line with the UCR, which suggested extending it to S of Preston (around Euxton somewhere presumably). It does though include the grandly titled Crewe Northern Connection.

    Rather confusing the map on this proposal shows a separate HS2 line running E of Crewe. In fact, HS2 runs in a tunnel under the station, emerging on the N outskirts of Crewe. There’ll be a new jcn S of Crewe to enable trains to stop at the station. A new stabling depot will be built where HS2 leaves the line of the WCML near the village of Wimboldsley, and the N Connection is a new grade-separated jcn to enable HS2 trains to rejoin after stopping at Crewe.

    I’ve not seen any detailed plans, but there’ll have to be a major revamp of the current station, which is ridiculously small for such a major junction.

    Comment by Peter Robins | January 25, 2022 | Reply


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.

%d bloggers like this: