Improvements At Marylebone Station – 15th October 2024
I passed through Marylebone station today and took these pictures of the improvements.
Note.
- The Class 165 and Class 168 trains are being refurbished.
- The Chiltern gate line has been improved.
- A wider ticket gate line has been installed in the Underground station.
- The stairs to the Bakerloo Line has been replaced with a third escalator.
- The last picture shows the lack of grab handles in the doors of Bakerloo Line trains.
It certainly looks like Chiltern Railways and its assets are improving.












I just wish Chiltern Railways would install a travelator between the gateline and platforms 5 and 6. It could be configured to run towards the gateline until, say, 1 pm and then in the reverse direction for the rest of the day. It would save so many people time…
Comment by Chris L | October 16, 2024 |
A low cost travellator would be a good think to design, as there are plenty of places where one could be installed.
I would start between the two Elizabeth Line stations at Liverpool Street and Moorgate would be my first.
Comment by AnonW | October 16, 2024 |