Beeching Reversal – Reopening Harston Station

This is one of the Round 3 bids of Beeching Reversal projects that the Government and Network Rail are proposing to reverse some of the Beeching cuts.

Harston is a Cambridgeshire village, which is shown in this Google Map.

Note.

  1. The A10 winding its way North and South through the village.
  2. Cambridge is five miles to the North.
  3. The triangular road junction in the middle of the village with Station Road leading off to the South East.
  4. The Cambridge Line crosses the South-East corner of the map, at a right angle to Station Road.

This Google Map shows the former station site at an enlarged scale..

Note.

  1. There is plenty of space.
  2. There is a level crossing.
  3. The railway is double-track.

There’s even a Harston History page for the station, so if the architect’s decide to go retro, they can visit it for design inspiration.

My initial thoughts are that compared to some of the proposals for Beeching Reversal this one is practical and not over ambitious.

These are some of my thoughts.

Car Parking

Currently, there are the following stations between Cambridge and Hitchin.

Note.

Only Royston station has more than minimal parking provision.

The addition of Harston and Cambridge South stations will probably mean, that a lot of thought will be given to parking at all the stations between Cambridge and Hitchin.

Cambridge South like Cambridge North will probably have extensive parking to also serve Addenbrooke’s Hospital and Cambridge Bio-Medical Campus.

Whittlesford Parkway station on the line between Cambridge and Liverpool Street has very adequate parking provision.

I wouldn’t be surprised to see Harston station having a couple of hundred parking spaces.

East West Railway

In Looking At The East West Railway Between Bedford And Cambridge, I looked at the route of the East West Railway as it approaches Cambridge.

I very much doubt that this new railway will go through Harston station.

But Harston station will beef up the capacity on the Cambridge Line to bring more workers to one of the science and engineering capitals of the world.

Cambridgeshire Autonomous Metro

There are also plans for the Cambridgeshire Autonomous Metro.

This map shows the proposed layout of the Cambridgeshire Autonomous Metro.

Note that the green section will be in tunnel.

I doubt that the Cambridgeshire Autonomous Metro will run to Harston, as it most likely will run on rubber-tyred wheels and probably wouldn’t mix well with heavy rail.

Train Service

Currently, the current trains run through the station in the Off Peak.

  • Thameslink – 2 tph – Cambridge and Brighton
  • Thameslink – 2 tph – Cambridge and King’s Cross
  • Great Northern – 1 tph – King’s Cross and Ely
  • Great Northern – 1 tph – King’s Cross and King’s Lynn

Note.

  1. tph is an abbreviation for trains per hour.
  2. All trains are fast services, except for the Cambridge and King’s Cross service, which stops at all stations.
  3. When Cambridge South station opens, I suspect nearly all services will stop at that station.
  4. The Great Northern services also stop at Cambridge North station.
  5. In Call For ETCS On King’s Lynn Route, I talked of the possibility of running 125 mph trains on Great Northern services between King’s Cross, Cambridge, Cambridge North, Ely and King’s Lynn.

I suspect that it will be likely only the Thameslink stopping train will call at Harston station, just as it is the only service that calls at Foxton, Shepreth and Meldreth stations.

  • But is two tph enough for a Park-and-Ride station?
  • Whittlesford Parkway station already has three tph to and from Cambridge.
  • I suspect there will be a second Stansted and Cambridge service which mean Whittlesford Parkway station gets four tph to Cambridge,

I suspect Hartston station needs four tph to give a Turn-Up-And-Go service.

Barrington Quarry And Landfill

This Google map shows the location of the Barrington Quarry and Landfill, with respect to Harston.

Note.

  1. Barrington Quarry and Landfill is in the North-West corner of the map.
  2. Harston is in the North-East corner of the map.
  3. The A10 road runs South-West from Harston to Foxton station, where there is a level crossing, where the Cambridge Line crosses the road.
  4. Foxton station has a freight-only line linking it to the quarry.

This second Google Map shows Foxton station in detail.

Note the rail line to Barrington curving away to the North West.

This document from CEMEX is entitled Barrington Quarry – Restoration Project.

It appears that the quarry will be restored and some of the land will be used for new homes.

As all the track is already in place, would it be possible to run a 2tph service between Barrington and Cambridge North station?

  • It could call at  Harston, Cambridge North and Cambridge stations.
  • Harston station would get a four tph service.
  • Cambridge gets more much-needed housing connected to the city.

It could also be run using battery-electric trains that would be charged using the electrification between Foxton and Cambridge North stations.

Conclusion

Taking everything together, it appears to me, that Harston station could improve the rail network to the South West of Cambridge.