The Anonymous Widower

Lancaster Station – 23rd May 2025

I finally got to Lancaster station today, after my failure that I wrote about in An Annoying Day.

I took these pictures.

I shall deal with the features of the station in separate sub-sections.

The Original High Speed Two Schedule Through Lancaster Station

This diagram shows High Speed Two services, as they were originally envisaged before Phase 2 was discontinued.

Note.

  1. Trains to the left of the vertical black line are Phase 1 and those to the right are Phase 2.
  2. Full-Size trains are shown in blue.
  3. Classic-Compatible trains are shown in yellow.
  4. Blue circles are shown, where trains stop.
  5. The dotted circles are where trains split and join.
  6. In the red boxes routes alternate every hour.

Click on the diagram to enlarge it.

If I look at the trains counting from the left of the diagram, I see the following trains passing or terminating at Lancaster station.

  1. Train 4 is a pair of classic-compatible trains, that split and join at Crewe, with one train going to Lancaster and the other to Liverpool Lime Street.
  2. Trains 10 and 11 are pairs of classic-compatible trains going between London and Scotland.
  3. Train 12 is a single classic-compatible train going between Birmingham and Scotland.

Only the Lancaster portion of Train 4 stops in Lancaster station.

The Track Layout

This OpenRailwayMap shows the track layout through the station.

Note.

  1. Tracks shown in red are electrified and tracks in black or not.
  2. In the North-West corner of the map the two bay platforms 1 and 2, that are used for local services can be seen.
  3. Platform 3 is a long platform on the Western side of the station, which is generally for Northbound through stopping trains, that can take 265 metre long eleven-car Class 390 trains.
  4. Paired with the track through Platform 3, there is a Northbound avoiding line, that allows faster trains to overtake trains stopped in the station.
  5. Platform 4 is a long platform on the Western side of the island platform on the Eastern side of the station, which is generally for Southbound through stopping trains, that can take 265 metre long eleven-car Class 390 trains.
  6. Paired with the track through Platform 4, there is a Southbound avoiding line, that allows faster trains to overtake trains stopped in the station.
  7. Platform 5 is a long platform on the Eastern side of the island platform on the Eastern side of the station, that is over two hundred metres long.
  8. All through tracks have a 75 mph maximum speed, except for Platform 5, which is just 30 mph.

Click on the diagram to enlarge it.

How Will High Speed Two Operate At Lancaster Station?

I would expect that the three High Speed Two services to and from Scotland will go through Lancaster station on the avoiding lines, which will mean that each avoiding line will handle one High Speed Two classic-compatible train every twenty minutes.

The train, that terminates at Lancaster has a few options.

  • It could terminate from London in any of platforms 3, 4 or 5.
  • It could leave for London from any of the platforms 3, 4 or 5.

Note.

  1. All three platforms are long enough to accept a single High Speed Two classic-compatible train, which is only 200 metres long.
  2. There would probably need to be some works to the tracks so that trains could terminate in platforms 4 or 5.
  3. There might need to be some works to the tracks so that trains could leave from London from platform 3.

The logical way to terminate the train would probably for the train to arrive and leave in Platform 5, but then this would need improvements to the tracks and also to the passenger footbridge across the tracks.

Eden Project Morecambe And The Morecambe Branch

In a few years time, both the Eden Project Morecambe and High Speed Two will be open and I suspect, a day out could be to take High Speed Two to Lancaster and the local train to Morecambe for a day at the Eden Project Morecambe.

This paragraph from the Eden Project Morecambe web site, describes the current status of the project.

Eden Project Morecambe, previously known as Eden Project North, has been awarded £50m in the second round of the UK Government’s Levelling Up Fund. The funding allows the project to move into its next phase and begin the process of finalising the remaining funds required from private and philanthropic sources identified as part of the bidding process.

I had intended to take a train to Morecambe to have a look round, but the train, that I would have needed to catch to get back to London at a reasonable hour, didn’t run due to lack of train crew.

As High Speed Two will provide connections at Lancaster to Birmingham, Carlisle, Crewe, Edinburgh, Glasgow, London, Preston, Warrington and Wigan and other trains will provide connections to Leeds, Liverpool and Manchester, the Eden Project Morecambe will be well connected to those who might like to visit by rail.

A day out with the kids, could involve a trip on High Speed One to Lancaster, a trip on a battery-electric shuttle train to Morecambe and a day out at the Eden Project Morecambe.

The Eden Project Morecambe could be a big money earner for High Speed Two and other rail companies.

I would envisage, that you would be able to buy an All-in-One ticket to the Eden Project Morecambe, which included your rail tickets.

The Passenger Footbridge

There is a lift on the Southbound side, but on the Northbound and bay platform side, there are only steps.

If substantial numbers of passengers visit the station and need to cross the tracks on the footbridge, as you would from arriving in Platforms 4 or 5 and wanting to go to Eden Project Morecambe, the footbridge is totally inadequate.

Lancaster Station Architecture

Lancaster station is Grade II Listed and you can see why from the pictures.

Work appears to be ongoing to refurbish the station.

The stonework appeared immaculate and very much High Speed Two-ready.

These picture shows part of the Costa coffee shop.

It was not what I expected.

 

 

May 24, 2025 Posted by | Transport/Travel | , , , , , , , , | 2 Comments

An Annoying Day

My plan was simple on Saturday May the 10th.

I intended to go to Liverpool Lime Street on a Day Return ticket.

I would then buy a Lancashire Day Ranger ticket and visit Wigan North Western, Preston and Lancaster stations, to see how ready, they are for High Speed Two services.

I also intended to go to Morecambe to see how the Eden Project Morecambe was getting on.

I did get to Wigan North Western station and later wrote Is Wigan North Western Station Ready For High Speed Two?

But then there was a points failure at Preston and after waiting at the station for over an hour for tranport to Preston, I changed plan.

I decided to go back to Liverpool by way of Wigan Wallgate and Headbolt Lane stations.

On return home, I wrote Wigan Wallgate To Headbolt Lane – 10th May 2025.

A Quick Run Back To London

At Lime Street station, I walked into the Wetherspoons pub at the station, with the intension of buying a bottle of my favourite brew, which all of the chain stock. But not this one!

So I got an early train back to London.

The Most Expensive Taxi Back From Euston

I paid over thirty pounds, when under twenty is the norm, not because I was being ripped off, but by the number of roadworks, that slowed our journey.

May 11, 2025 Posted by | Transport/Travel | , , , , , , , , , , | 2 Comments

Platform Canopies To Be Renovated For Passengers At Lancaster Station

The title of this post is the same as that of this press release from Network Rail.

These are the first two paragraphs.

Station platform canopies are being renovated at Lancaster to improve passenger journeys on the West Coast Main Line.

Network Rail is investing £9.5m to restore and upgrade the station building for the future.

This picture from Network Rail shows an aerial view of the station.

Note that the camera is looking South.

This picture shows the current canopies.

Network Rail can surely do better on a Grade II Listed Building.

The press release lists that this work will be done.

  • Replacing all glazing in the platform canopies
  • Repairing and strengthening the structure of the canopy structures
  • Repainting across the station

The press release says the work won’t affect train services, but will be done when trains aren’t running.

These are my thoughts.

Lancaster Station and High Speed Two

Lancaster station will be a terminus on the High Speed Two Network.

Note.

  1. Train 4 , which is a pair of 200 metre High Speed Classic Compatible trains, leaves London Euston  and splits at Crewe, with one train going to Liverpool Lime Street and the other to Lancaster.
  2. Train 12, which runs between Birmingham Curzon Street and Scotland, also calls at Lancaster.

Both trains will be single 200 metre High Speed Classic Compatible trains at Lancaster station and platforms 3, 4 and 5 can handle them.

But how will the Lancaster train terminate?

This map from OpenRailwayMap shows the lines through Lancaster station.

Note.

  1. The red lines are electrified with 25 KVAC overhead wires.
  2. In the North-West corner of the station are the bay platforms 1 and 2, which handle Morecambe services.
  3. West Coast Main Line services between London Euston and Scotland, go through platforms 3 and 4 in the middle of the station.
  4. On the East side of the station is platform 5 which is on a loop off the West Coast Main Line.

I would expect that the London Euston and Lancaster service will generally terminate in platform 5.

Wikipedia says this about platform 5 and the signalling.

Platform 5, which can be used by both northbound and southbound trains or by terminating services.

All platforms are signalled for arrivals and departures in either direction.

That all sounds very convenient.

There may be some minor changes for the longer High Speed Two trains, but I doubt it would be too challenging.

Onward To Morecambe

The Eden Project North at Morecambe  could attract a lot of traffic.

  • Lancaster will be just two hours and three minutes from London by High Speed Two.
  • There are numerous rail connections from Lancaster to all over the North of England and Scotland.
  • Would you drive for two hours to the Eden Project North, if there was a convenient and quicker train?
  • Train companies may offer combined tickets for the attraction with rail tickets.

Wikipedia says this about the development and opening of the attraction.

Having been granted planning permission in January 2022 and with £50 million of levelling-up funding granted in January 2023, it is due to open in 2024 and predicted to benefit the North West economy by £200 million per year.

I’ve always wanted to go to the Eden Project in Cornwall, but it’s difficult if you don’t drive.

However, I might manage to get to Eden Project North.

Trains between Morecambe and Lancaster are at least hourly.

  • I think they can use any platform at Lancaster.
  • Morecambe station has two platforms.
  • Morecambe and Lancaster stations are four miles apart, with probably half electrified.
  • A battery-electric train could work between Morecambe and Lancaster.

I can envisage two main ways to arrange the connection between Morecambe and Lancaster.

  • Trains arrive in Lancaster and passengers for Morecambe catch the next Morecambe train for two stops, that take ten minutes.
  • When High Speed Two serves Lancaster from Euston, the shuttle train can wait in the Northern end of Platform 5 and when the High Speed Two train arrives passengers can just walk up the platform to the shuttle.

But if the Eden Project North is as successful as the Cornish original, there is going to be a need for more trains between Morecambe and Lancaster.

This Google Map shows Morecambe station.

Note that the island platform is probably about 160 metres long.

This would accommodate.

  • A five-car Class 802 or Class 805 train.
  • A pair of four-car Class 319, Class 321 trains.
  • A pair of three-car Class 331 trains.

But why not be bold and lengthen at least one platform to the full two hundred metres, so that it can accommodate a High Speed Classic Compatible train?

This would also accommodate.

  • A seven-car Class 807 train.
  • A pair of four-car Class 331 trains.

All of these electric trains would need the Morecambe branch line to be electrified to Morecambe station.

But the Eden Project North would get the public transport access it needs.

Electrifying To Morecambe

This map from OpenRailwayMap, shows the Morecambe Branch Line between the West Coast Main Line and Morecambe station.

Note.

  1. The tracks shown in red on the Eastern side of the map are the West Coast Main Line.
  2. The black lines are the unelectrified tracks of the Morecambe branch line.
  3. Morecambe station is marked by the blue arrow.
  4. Much of the Morecambe branch line is single track, with some sections of double track.
  5. The distance between the West Coast Main Line and Morecambe station is around 2.1 miles.

I don’t think it would be the most challenging of electrifications.

A Green Route To The Isle Of Man And Ireland

This map from OpenRailwayMap, shows the terminal of the Morecambe Branch Line at Heysham Port.

Note.

  1. There is a rail connection to the West Coast Main Line via Morecambe, which is shown in yellow.
  2. The port appears to have three berths for ferries.
  3. There are only a couple of train services per day.
  4. South of the port is the Heysham nuclear power station, which has a capacity of 2.5 GW.

At a first glance, it would appear, that a rail-served passenger terminal could be built close to the port.

I suspect most passengers using Heysham are travelling with a vehicle.

The problem is also that the ferry crossing to Belfast takes around eight hours and there are faster and more convenient routes.

The ferries could be decarbonised by using ammonia or hydrogen fuel, but I doubt that they would be any faster.

I suspect that getting more passengers to use Heysham for the Isle of Man or Ireland will be a difficult proposition to sell to passengers.

And it is made even more difficult with such an infrequent train service.

Before High Speed Two

Avanti West Coast might like to run a train between Euston and Morecambe for the Eden Project North.

Are National Rail Promoting Theme Parks?

I found this page on the National Rail web site, which is entitled Theme Parks.

It gives a list of most theme parks and their nearest stations.

Does such a page exist for hospitals, cathedrals and other similar groups.

 

 

 

 

 

March 20, 2023 Posted by | Transport/Travel | , , , , , , , , , , , , , | Leave a comment