Expanding Charing Cross Station

Network Rail have published the Kent Route Study, which says the following about Charing Cross station.

Charing Cross and Cannon Street stations are effectively full.

Only Platform 1-3 can take the longest trains at Charing Cross station.

The study suggests this as a solution at Charing Cross.

Charing Cross has just six 12-car platforms and Platforms 4, 5
and 6 are very narrow, leading to operational restrictions. Class 465
units cannot operate in 12-car into these platforms and selective
door operation is used on Class 375 units. A major rebuild of the
station could allow it to be extended south over the river, like
Blackfriars, providing compliant platforms and greater passenger
circulation. At concept level, a new link to Waterloo from a southern
entrance to Charing Cross may supersede Waterloo East allowing
the station area to be used for additional track capacity, but there
are likely to be many issues with a project on this scale.

This Google Map shows the station and the Northern |end of the Hungerford Railway Bridge.

Note.

  1. Platforms are numbered 1 to 6 from top to bottom.
  2. The two Golden Jubilee footbridges on either side of the Hungerford bridge.
  3. There appear to be four or five tracks on the bridge.
  4. The bridge appears to tracks on either side of a central truss.

I went to Charing Cross station on the train and then walked across the downstream Golden Jubilee Bridge, which is the top one in the Google Map.

The Hungerford Bridge is certainly a good example of Victorian engineering, which appears to be two separate sections separated by a big truss, with trains running o either side.

A Cross River Charing Cross Station

Network Rail obviously feel that it will be possible to create a cross-River station, as they have published the idea in the Kent Route Study.

I shall outline some thoughts.

Will The Hungerford Bridge Have To Be Replaced?

Consider.

  • Replacing the bridge and all the associated steel-work, would be an extensive and expendive project.
  • The state of the bridge, which was refurbished about three decades ago, will be very important.
  • Modern structural engineering can probably give the bridge sufficient integrity and possibly more space.
  • The Golden Jubilee Footbridges, which are some of the busiest pedestrian crossings of the Thjames would obviously stay.

I feel that unless the bridge was in a really poor condition, that the current bridge won’t be replaced, but it will probably be substantially rebuilt.

Will Waterloo East Station Be Closed?

The Kent Route Study said this about Waterloo East station.

At concept level, a new link to Waterloo from a southern
entrance to Charing Cross may supersede Waterloo East allowing
the station area to be used for additional track capacity, but there
are likely to be many issues with a project on this scale.

The issues could include.

  • A double-ended Charing Cross station would give benefits similar to those at Blackfriars.
  • A Southern entrance to Charing Cross station would possibly be better than Waterloo East station for entertainment on the South Bank.
  • Passengers transferring between Charing Cross and Waterloo services might have further to walk.
  • Underground connections.
  • Cutting out the stop at Waterloo East would save time. It would probably make it easier to stick to the timetabe.
  • Some of the Waterloo East site could be released for development.

I wouldn’t be surprised to see Waterloo East station closed.

How Many Trains Could Use Charing Cross Station?

Currently, the six platforms at Charing Cross handle sixteen trains per hour (tph) in the Off Peak.

A well-run platform can turnback four tph, so it could be that the capacity of a well-laid out Charing Cross station could be 24 tph.

Other factors could increase the capacity of the station.

  • The platforms could be long enough to handle two full length trains.
  • Entrances on both sides of the river would ease passenger flows.
  • The next generation of trains will hold more people in a train of a given length.
  • Automatic Train Operation could be employed on trains out of Charing Cross.

Obviously, the engineers and architects will have to get the design right, but I believe this frequency could be possible.

Conclusion

I think expanding Charing Cross station across the river is a good plan and not impossible.

But the design could be tricky!

It also looks like the passenger capacity at Charing Cross could be substantially increased.

 

 

 

 

January 10, 2018 Posted by | Travel | , , , | 2 Comments

Custom House DLR Station Reopens – 10th January 2017

Custon House  DLR station has now reopened and trains are now stopping again.

As the pictures show, there is still a fair bit of work to do.

I’m curious, as to what the structure on top of the station is for.

At the moment, it’s just a framework of steel beams, but is it for retail or a ticket office for either Crossrail or Excel.

Crossrail’s information on the design of the station is non-existent.,

 

January 10, 2018 Posted by | Travel | , , , | 2 Comments

Plastic Bag Charge: 5p Levy To Be Extended In England

The title of this post is the same as that on this article on the BBC.

It’s a good idea.

And while we’re about it, why not put a 5p levy on every takeaway meal, as most the the packaging seems to be dropped on the street!

January 10, 2018 Posted by | Food, World | , | Leave a comment

A Good Summary Of What’s Happening In Creating New And Updating Old Stations

This article on Rail Engineer is entitled Stations: what happened in CP5 and what’s happening in CP6?

It is an article to read. Especially, if you’re thinking of moving house to a new area!