The Bombardier Aventra And Brexit
You might think what is the connection between a radical design of train and the withdrawal of the UK from the European Union.
Great Leap Forward Projects
Both are projects that their promoters would say will create a Great-Leap-Forward for Bombardier and the UK respectively.
The Devil Is In The Detail
Both are in trouble.
- Bombardier’s engineers and software developers can’t get software for the Aventra and particularly the Class 710 train for the London Overground, working in the way the train and its operator need.
- UK and EU politicians, aided by some of the most able and expensive lawyers and consultants, can’t stitch together a workable Brexit agreement that is acceptable to all.
Does this mean that both projects are doomed?
Were The Original Plans Creditable?
I’ll take the Aventra first.
Bombardier had missed out on the Thameslink contract and needed to win the Crossrail contract to survive.
So virtually starting with a clean sheet of paper and knowing very well what technology was the best and could be used to advantage, set about designing a train that could adapt for every possible use.
Bombardier also spoke to all those, who would be using or dealing with the trains in some way, to ascertain what they needed.
The result was that Bombardier won the Crossrail order and have since sold fleets of Aventras to London Overground, Greater Anglia, South Western Railway, West Midlands Trains and c2c.
It should also be said that they probably sold some of these fleets before a large number of Aventras were actually running.
So at least Bombardier’s plans appeared sufficiently detailed and creditable to six train operating companies.
Brexit was sold to the British public, in much the same way that evangelists sell you the latest religion, political philosophy, magic cancer cure or con. Is there any difference between the four?
Was any thought given to the serious problem like the Irish border? If anything was, I don’t remember hearing or reading it!
The major policies I remember was that all the money we give to Europe will go to the NHS and that immigration will be cut to almost zero.
Everything that said you should vote Remain was dismissed as Project Fear!
But the philosophy was enough to win the referendum.
What Were The Risks?
The Leavers would have lost, if they had got the estimates of any of these wrong.
- The power and delivery of their philosophy.
- The dislike of immigrants.
- iThe hatred of all things European, except holidays in the sun.
- The weakness of the Remainers message.
It was an easy sell and a majority of the British public bought it.
Forty years ago, when we created Artemis, we followed a route similar to Bombardier with the Aventra, but on a much smaller scale.
- We did an extensive survey of users of Project Management Systems.
- We laid out our objectives, which I have somewhere on a single A4 sheet of paper.
- We researched and defined what hardware we would need.
- I was then able to program the first system.
And guess what! The software was late, by several months.
But at least, when I got it right, systems were able to be delivered. And the orders started to flow!
Based on my experience, the software that runs the Bombardier Aventra will be the biggest risk in the design of the train.
If I’d put this risk to the engineer in charge of Aventra development, I would have been very surprised, if they didn’t agree.
Getting Back On Track
Bombardier will probably do what I did forty years ago.
Keep at it, until the software is perfect and the Class 710 trains run as it says in the brochure.
As happened with Artemis, once you have one system going, on the signing off of the software, you can create other systems or in Bombardier’s case; trains.
Bombardier can add the software to the scores of trains they have already built and stored and start testing, certification and delivery of individual trains.
Software, is like a magic elixir, that brings inanimate objects to life.
Will a magic elixir be found to solve the Brexit logjam?
Bombardier have to create software, that does the following.
- Controls all parts of the train, so they do as promised.
- Connect all train systems together.
- The software must also work flawlessly.
It only needs to work in one language.
The philosophy and structure for a Brexit deal are more complicated.
- There are a lot more issues to be solved.
- Twenty-eight countries, their governments, parliaments and people must be satisfied.
- How many languages will be involved?
Anybody, who reckons they could get a deal is probably a fantasist.
Why Was Artemis Developed?
We knew that there was a need for a small Project Management System.
But look at the date we started development; 1976. James Callaghan had just taken over from Harold Wilson as Prime Minister.
- The country was not doing well.
- The government didn’t have a large majority.
- Everything was doom and gloom.
- Tax rates were as high as eighty percent.
- There was a housing crisis.
- Many were worried about their jobs.
- There was a lot of industrial unrest.
Surely, it wasn’t the time to risk all on a new venture?
But we were not of the herd and we didn’t hold back and went for it. And the rest as they say is history.
It is now 2019 and many of the issues I listed about the mid-1970s still apply.
- The country is not doing well.
- The government doesn’t have a large majority.
- Everything is doom and gloom.
- There is a housing crisis.
- Many are worried about their jobs.
But there is one big difference. If you have an idea that is worth developing, raising money to develop it, is a lot easier to find.
To me, Brexit is a once in a lifetime opportunity for many to develop an idea and/or create a business to overcome the myriad number of problems leaving the EU will bring.
- As leaving the EU without a deal will create more problems, it might be preferable for job creation.
- Brexit may also create opportunities in Europe for new and innovative businesses.
It will be large industries, that will find times harder.
February 2, 2019 - Posted by AnonW | Computing, Transport/Travel, World | Artemis, Aventra, Bombardier, Brexit, Class 710 Train, Software
No comments yet.
This site uses Akismet to reduce spam. Learn how your comment data is processed.
About This Blog
What this blog will eventually be about I do not know.
But it will be about how I’m coping with the loss of my wife and son to cancer in recent years and how I manage with being a coeliac and recovering from a stroke. It will be about travel, sport, engineering, food, art, computers, large projects and London, that are some of the passions that fill my life.
And hopefully, it will get rid of the lonely times, from which I still suffer.
Why Anonymous? That’s how you feel at times.
Charities
Useful Links
Top Posts
- How Much Power Is Needed To Run A Train At 125 Or 100 mph?
- Beeching Reversal: Fifty Disused Rail Lines On Track To Reopen
- The Barbican Entrance To The Elizabeth Line - 10th June 2022
- Reopening Of Abandoned Merseyside Railway Under Consideration
- Electric Cars Are A Dead End!
- A Message To All Customers Of Currys/Dixons plc
- How Much Water Vapour Is In A Cubic Metre Of Air at A Given Temperature And Relative Humidity?
- Job Scam - Hyde Park Hotel
WordPress Admin
-
Join 1,894 other subscribers
Archives
Categories
- Advertising Architecture Art Australia Banks Battery-Electric Trains BBC Buses Cambridge Cancer Coeliac Construction COVID-19 Crossrail Death Decarbonisation Design Development Docklands Light Railway Driving Electrification Energy Engineering Entertainment Flying Football France Freight Germany Global Warming/Zero-Carbon Good Design Gospel Oak And Barking Line Greater Anglia Great Western Railway Heathrow Airport High Speed Two Housing Hydrogen-Powered Trains Innovation Internet Ipswich Town Law Liverpool London London Overground London Underground Manchester Marks and Spencer My House New Bus for London New Stations Offshore Wind Power Olympics Phones Politics Project Management Religion Research Scotland Shopping Stations Step-Free Stroke Tax Television Thameslink The Netherlands Trains Trams Tunnels United States Walking Weather Wind Power Zopa
Tweets
Error: Twitter did not respond. Please wait a few minutes and refresh this page.
Leave a Reply