The Anonymous Widower

Go-op Plans New Services From Summer 2020

The title of this article is the same as that of this article on Modern Railways.

This is the first sentence.

Community-owned rail operator Go-op Co-operative Ltd is seeking views on proposed new open access rail services in Somerset and Wiltshire. Services, which it hopes could start in summer 2020, would be operated by two refurbished Class 769 units working ‘a complex series of trips between Oxfordshire and Somerset’

I wrote about this before in An Ambitious Proposal For A New Train Service?

In the intervening three years, their plans have developed with more detail and a change to Class 769 trains.

I suggested the latter trains in my original post about Go-op, would be an idea.

Given the proposed route structure, they would be able to run at 100 mph on the electrified sections.

April 2, 2019 Posted by | Transport/Travel | , , , | 1 Comment

The Shape Of Things To Come

Yesterday, I needed to go between Moorgate and Tottenham Hale stations.

It was just before the evening Peak and I took the escalators down to the Northern City Line platforms, where a new Class 717 train was waiting.

The increased capacity meant I got a seat and I took the train three stops to Highbury & Islington station.

It was then just a walk through a very short tunnel to the Victoria Line and a train to Tottenham Hale.

It was so much more relaxed than squeezing into a crowded and very elderly Class 313 train.

After the timetable change in May, there will be eight trains per hour (tph), as there is now, but given the number of trains in the new fleet and signalling improvements in the pipeline, I feel that this frequency will be increased.

It should also be noted that in the Peak there are twelve tph, which in the future could be used all day.

But in the interim, trains with extra capacity will be very welcome.

From An Ugly Ducking To A Swan

These developments are either underway or planned for the next few years.

  • Improved signalling on the Northern City Line.
  • Full step-free interchange at Finsbury Park between Moorgate services and Thameslink, Piccadilly and Victoria Lines.
  • Higher frequencies on Thameslink and the Piccadilly Line through Finsbury Park
  • Full step-free access to the Northern City and Victoria Lines at Highbury & Islington station.
  • Full step-free access at Old Street station.
  • Hopefully, Essex Road station will be cleaned.
  • Crossrail will finally arrive at Moorgate station.

North London’s ugly ducking, which has caused passengers, British Rail and London Underground, so much trouble, will finally have turned into a swan.

I always wonder if the City of London’s transport planners, wish that the Victorians had built the planned extension to a new Lothbury station, close to Bank.

What Will Be The Ultimate Frequency?

Currently the frequency between Alexandra Palace and Moorgate stations in the Peak is twelve tph.

Compare this with the following frequencies.

  • Crossrail will be initially 24 tph.
  • The East London Line is planned to go to 20 tph
  • The Piccadilly Line is currently at 24 tph between Arnos Grove and Acton Town stations in the Peak.
  • Thameslink will soon be at 24 tph
  • The Victoria Line is currently at 36 tph.

I don’t think it unreasonable that a frequency of at least sixteen and possibly twenty tph between Alexandra Palace and Moorgate stations is achievable.

  • Digital signalling and Automatic Train Control will be possible.
  • If Dear Old Vicky can turn 36 tph at Brixton and Walthamstow Central stations, with two platforms, then surely 20 tph at Moorgate is possible, once there is better access for passengers to the platforms.
  • Alexandra Palace to Moorgate is a double-track railway, that is almost exclusively used by Moorgate services.
  • 16-20 tph would make the cross-platform interchange with the Victoria Line at Highbury & Islington station very efficient.
  • There are two branches North of Alexandra Palace station. I’m sure each could handle 8-10 tph.
  • The Hertford Loop Branch has three terminal stations; Gordon Hill, Hertford North and Stevenage stations.
  • The East Coast Main Line has two terminal platforms  at Welwyn Garden City station.

I could see the following frequencies.

  • Moorgate and Gordon Hill – four tph
  • Moorgate and Hertford North – four tph
  • Moorgate and Stevenage – four tph
  • Moorgate and Welwyn Garden City – four to eight tph

It will be a very high-capacity Metro into Moorgate. There could be a need for a few more trains.

But with increased speed.

Should The Northern City Line Be Shown On The Tube Map?

Increasingly, passengers will use the high-frequency Southern section of the Northern City Line between Alexandra Palace and Moorgate stations, as a new tube line.

So like Thameslink, the arguments will start as to whether this line should be on the Tube Map.

If Crossrail is to be shown, it is my view that nThameslink and the Northern City Line should be shown too!

April 2, 2019 Posted by | Transport/Travel | , , , , , , , | 4 Comments

McPhy Launches “Augmented McFilling”, Its New Smart Hydrogen Station Architecture For Heavy Duty Vehicles

The title of this post, is the same as that of this article on Nasdaq.

It shows the way that lots of individuals and companies are putting effort into the hydrogen economy.

April 1, 2019 Posted by | Transport/Travel | , , | Leave a comment

From Groningen To Leer By Train

On my recent trip to the Netherlands and Germany, I didn’t get to do this trip by train and had to make do with a slow bus ride.

However I’ve just found this video on YouTube.

The Freisenbrücke is about an hour from the start of the video.

I should fast forward, as there is only so much travelling on a single-track rail line, that you can watch before falling asleep.

I got this impression of the route in the video, which was made in October 2014.

  • The route is mainly single-track, with some passing loops at stations.
  • the track is not electrified, except for short sections at either end.
  • The track was almost straight.
  • The track, stations and signalling appear to be in good condition.
  • There were a large number of level crossings.
  • The train took around one hour and twenty minutes between Groningen and Leer stations.

I can imagine that Deutsche Bahn and Arriva Netherlands were a good bit more and just annoyed, when the MV Emsmoon destroyed the bridge.

Wikipedia says this about the accident.

On 3 December 2015, Emsmoon collided with the Friesenbrücke [de], which carries the Ihrhove–Nieuweschans railway over the Ems. The cause of the accident was reported to be miscommunication between the bridge operator and pilot on board the ship. The bridge could not be raised as a train was due, but the ship failed to stop and collided with the bridge, blocking both railway and river. The bridge was so severely damaged that it will have to be demolished. Replacement is expected to take five years

I suspect, it’s not just an massive inconvenience for the railway, as a couple of miles South on the River Ems, is the Meyer Werft shipyard, where cruise ships up to 180,000 tonnes are built.

I found this document on the NDR.de web site and gleaned the following information.

  • The cost of rebuilding could be up to eight million euros.
  • The new bridge will be finished in 2024, if all goes well.
  • Environmentalists are bringing lawsuits against the construction of the bridge.

It will be a challenge to rebuild this bridge.

This video shows the new bridge

Let’s hope that one of those large cruise ships doesn’t hit the bridge.

Conclusion

This surely has been a very costly accident.

April 1, 2019 Posted by | Transport/Travel | , , , , , | 4 Comments

Third Degree Murder

The title of this post is the same as that of an article by Ian Walmsley in the April 2019 Edition of Modern Railways.

In the article Ian has a heavyweight go at the Office of Road and Rail about their policy towards third rail electrification.

As a Control and Electrical Engineer, I agree with a lot he says, especially as I believe modern control systems and good design can improve safety of third rail systems to a high level.

I also believe the following.

  • In some places third-rail electrification, which is only live when a train is protecting the rails from morons, is safer than any other electrification system.
  • In some places, like on top of high viaducts third-rail electrification is safer for engineers installing and maintaining it,  than overhead electrification.
  • Some battery charging systems will be designed around third-rail electrification.

Ian’s article gives various reasons for using third-rail electrification.

He also proposes the radical innovation of using a voltage of 1500 VDC, which he calls 2XV.

I like it and agree with his reasoning..

It sounds radical, but it is not a new idea.

An article on Wikipedia is entitled Rail Transport In The Netherlands.

This is said.

Most of the network is electrified at 1.5 kV DC (which limits interoperability with neighbouring countries), although Belgian trains – built for 3 kV DC – can run on the Dutch network at reduced power. Both the HSL-Zuid and the Betuweroute have been electrified at 25 kV AC; although conversion of existing electrified lines to 25 kV AC was considered in 1997, 2005 and 2012 at a cost of over €10 billion, a 2015 proposal (revised in 2017) is to convert to 3 kV DC at a 2017 cost of €1 billion. The higher DC voltage would reduce power losses and have faster acceleration above 60 to 70 kilometres per hour (37 to 43 mph), so stopping trains would save seven to 20 seconds per stop.

Are the Dutch implementing their proposal?

April 1, 2019 Posted by | Transport/Travel | , , | 2 Comments