Dore And Totley Station – 13th July 2020

These pictures show Dore and Totley station.

These are my thoughts on the station and the tracks through it.

The Midland Main Line And High Speed Two

The two tracks, that are furthest away from the station platform are the Midland Main Line between Sheffield and Chesterfield, Derby and the South.

  • These tracks will be taken over by High Speed Two.
  • They will be electrified with 25 KVAC overhead electrification.
  • The trains on the Midland Main Line will continue to use the electrified tracks.
  • East Midlands Railway have ordered bi-mode Class 810 trains, which will each be 120 metres long or 240 metres long, when running as a pair.
  • CrossCountry’s Class 220 trains are 187 metres long running as a pair.
  • I estimate that the faster trains were doing around 100 mph, as they passed Dore and Totley station. I shall measure it properly next time, I go to Sheffield on a train.

Note.

  1. High Speed Two’s trains will probably be going through at the same speed as East Midlands Railway’s Class 810 trains.
  2. High Speed Two will be running their 200 metre long classic-compatible trains to and from Sheffield, so except that there will be two more trains in every hour, there will be little difference.
  3. Both the High Speed Two and the East Midlands Railway trains will be running on electric power between Sheffield and Chesterfield stations.
  4. It is likely that other services will use electric power on the Midland Main Line.
  5. There will be no platforms on the High Speed tracks at Dore and Totley station.

I would suspect that there will be little disruption to train services through the area, whilst the electrification is installed, judging by the disruption caused during electrification between Bedford and Corby.

Dore Junction

Dore Junction is a triangular junction, that connects the Hope Valley Line and the Midland Main Line to the South of Dore and Totley station.

This Google Map shows Dore Junction.

Note.

  1. Dore and Junction station is at the North of the Map.
  2. Dore West Junction is in the South West corner of the map and leads to the Hope Valley Line.
  3. Dore South Junction is in the South East corner of the map and leads to Chesterfield on the Midland Main Line.

This second Google Map shows Dore South Junction.

Could this junction be improved to increase capacity and efficiency?

  • The Southern track of the triangular junction is only single track.
  • It is a major route for stone trains between Derbyshire and London and the South.

If Network Rail have any ideas for Dore Junction, then surely, when the works in the area are being carried out, is the time for them to be performed.

Platform Length At Dore And Totley Station

I took these two pictures when I arrived at Dore and Totley station.

As the train was formed of two two-car Class 150 trains and the train fits the platform, it would appear that the platform is about eighty metres long.

An Extra Platform At Dore And Totley Station

There may be no plans to put platforms on the Midland Main Line, but plans exist for an extra track through the station, that will connect to the Hope Valley Line.

This Google Map shows Dore and Totley station and the Midland Main Line.

 

The second platform wouldn’t be the widest platform,. but I’m sure a second track and a safe platform could be squeezed in.

I wonder if more space is needed, the Midland Main Line could be realigned to give more space and better performance.

A Turnback At Dore And Totley Station

In Beeching Reversal – Sheaf Valley Stations, I said this about a possible turnback at Dore and Totley station.

This Google Map shows Dore & Totley station and the area to the South.

Note.

    1. There would appear to be a lot of space between the Midland Main Line and the single track, that leads between Dore & Totley station and the Hope Valley Line.
      Flying my helicopter, as low as I dare, it looks like the area is either a rubbish dump or very low grade businesses.
      Crossrail has designed turnbacks at Abbey Wood and Paddington stations, that will handle twelve tph.
      I believe that it would be possible to design a turnback at Dore & Totley station, that would handle eight trains per hour, if not twelve tph.

It might even be possible to squeeze in some overnight stabling.

Whilst I was at Dore and Totley station, I met a couple, who were perhaps a few years older than me, who had grown up in the area.

He could remember local steam services between Sheffield and Dore and Totley stations, where there had been a turntable to the South of the station to reverse the locomotive.

Conclusion

After what I saw on my visit to Dore and Totley station, I would suspect that the station can be updated to the standard required to allow four tph between Manchester Piccadilly and Sheffield stations.

It could also be a station that will attract passengers.

 

July 14, 2020 - Posted by | Transport | , , , , , ,

1 Comment »

  1. Interesting information on the lines early days on the Friends of the station pages.http://www.fodats.net/html/history.html

    Comment by jagracer | July 15, 2020 | Reply


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.