The Anonymous Widower

Moorgate Station – 26th April 2022

In July 2021, I wrote Down Into The Depths At Moorgate Station and I included this picture of the lift that connects the Northern and Elizabeth Lines.

For much of the last few months, this lift lobby has been full of builders junk piled along the right hand side.

But today, everything looked finished.

The yellow bars are the barrier to stop passengers taking a closer look.

When Will Crossrail Open?

Between Angel and London Bridge stations, there are four projects underway on the Northern Line.

The Rebuilding Of Old Street Station

This page on the Transport for London web site, describes the rebuilding of the station.

This is an extract.

In summer 2022 we will:

  • Create an interim exit route through the main station entrance stairs while works continue on the above-ground part of the new entrance
  • Complete final changes to the traffic layout and close Subway 3 over the weekend of 10, 11 and 12 June 2022.

Transport for London’s journey planner also indicates that up to the end of June, there will be no closures of Old Street station or the Northern Line through the station.

It would appear that this project is totally independent of the trains and access to the platforms.

The Bank Station Upgrade

As far as Angel, Old Street, Moorgate and London Bridge stations are concerned, these stations are generally not affected by the work at Bank, as one line between Moorgate and London Bridge stations is being replaced by another.

  • The signalling will have to be thoroughly checked.
  • Drivers will have to be trained.
  • Station staff will have to be trained in the procedures in the new platform at Bank.

I have checked the closed sections of the Northern Line on Transport for London’s journey planner and found this.

  • May 1st to May 19th – Northern Line closed between Moorgate and Kennington. As now!
  • May 20th – Northern Line fully open
  • May 21st to May 22nd – Northern Line closed between Archway and High Barnet
  • May 23rd to May 31st – Northern Line fully open

Note.

  1. I haven’t checked June yet!
  2. Archway has a turnback siding to allow the High Barnet branch to be closed.
  3. All dates are 2022.

It does look that the new Southbound tunnel through Bank station could open on May 20th, which is a Friday.

Crossrail Opening

Transport for London’s journey planner provides some interesting information about TfL Rail services.

  • May 1st – Slightly reduced service
  • May 2nd to May 6th – Normal service
  • May 7th to 8th – Slightly reduced service
  • May 9th to May 19th – Normal service
  • May 21st to 22nd – Slightly reduced service
  • May 23rd to May 31st – Normal service

Note.

  1. The slightly reduced service has a few less early morning services and a possible reduced frequency. It only applies at weekends.
  2. Normal service is just that, although trains might not be stopping at all stations.

I wouldn’t be surprised to find, that Crossrail can open on any day, where normal service is running.

With the new Southbound tunnel of the Northern Line possibly opening on the 20th May, I wouldn’t be surprised to see Crossrail opening a few days before, so as to give the very busy part of the London Underground in the City of London, a good test.

The Crossrail Pedestrian Route Between Liverpool Street And Moorgate

I described this pedestrian route in London’s First Underground Roller Coaster and as it is part of the Crossrail pedestrian routes, I suspect it will open with Crossrail.

This picture shows a cross-section of the massive Liverpool Street Crossrail station, which will connect Moorgate and Liverpool Street stations when it opens in December 2018.

Note.

  1. Moorgate station is on the left.
  2. Liverpool Street station is on the right.
  3. In the middle looking like a giant juicer is the ventilation shaft in Finsbury Circus.
  4. The Crossrail tunnels, which consist of two running tunnels and a pedestrian walkway between them are at the deepest level.
  5. There are escalators and lifts all over the place.

The route will become an ideal walking route between Liverpool Street and Moorgate stations in heavy rain, for those who don’t want to get wet.

But it could open earlier, as it would test the pedestrian tunnels.

April 26, 2022 - Posted by | Transport/Travel | , , , , , , ,

No comments yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.

%d bloggers like this: