The Anonymous Widower

Grand Union Sets Out Stirling Ambitions

The title of this post, is the same as that of an article in the December 2022 Edition of Modern Railways.

This is the first paragraph.

Grand Union Trains has updated its plans to operate services between Stirling and London Euston. It is targeting a 10-year track access agreement with services starting in May 2025.

I have a few thoughts.

The Route

The route between Stirling and Euston is as follows.

  • Trains will call at Larbert, Greenfauds, Whifflet, Motherwell, Lockerbie, Carlisle, Preston, Nuneaton and Milton Keynes.
  • Station upgrades are proposed for Larbert, Greenfauds, Whifflet and Lockerbie.
  • The route is fully-electrified.
  • There will be four trains per day in both directions, with a slightly reduced service on Saturday evenings and Sunday mornings.

This sentence from the article sums up the philosophy of Grand Union Trains.

The company says the aim is to link towns which have no or limited long-distance services and to improve connectivity for some station pairs on the West Coast Main Line.

Note.

Currently Larbert, Greenfauds and Whifflet don’t have services running past Stirling or Motherwell.

  1. Currently, Nuneaton and Milton Keynes have no Scottish services.
  2. Nuneaton is well connected to Peterborough and the East.
  3. Milton Keynes will be on the East-West Railway to Oxford and Cambridge.

It looks to be a service that has been well-planned and offers good possibilities for travel.

The Trains

The article says this about the trains.

New bi-mode rolling stock would be used and GUT says discussions with potential suppliers and manufacturers are ongoing.

Why Are Bi-Mode Trains Needed?

I can think of these reasons.

  • Grand Union Trains want to run their South Wales services with the same trains.
  • They might want to extend Scottish services from Stirling to perhaps Perth or Dundee.
  • They want to offer a reliable service, when the electrification is damaged.

Bi-mode trains will certainly offer flexibility and reliability.

How Long Will The Trains Be?

Consider.

I suspect a train has a maximum length of 260 metres and these can be run between London Euston and Stirling.

Could it be that station upgrades are needed for Larbert, Greenfauds, Whifflet and Lockerbie, is that these stations have short platforms?

Could the trains and platforms start short and grow with the business?

 

The Trains Will Have Three Classes

These classes will be offered.

  • First Class in compartments
  • Standard in a 2+1 arrangement
  • Standard Economy in a 2+2 arrangement

You pays your money and you make your choice.

Vanload Freight May Be Carried

Consider.

  • There has been a lot of speculation and some serious train conversions, looking at the possibilities of high speed freight.
  • Imagine a train of perhaps five passenger cars and one freight car for containerised freight.
  • I suggested earlier, that the trains might grow with the business.
  • As business develops, extra cars can be added as appropriate.
  • If business booms, then it might be best to run separate passenger and  freight services.

Modern trains and refurbished older ones, offer a multitude of solutions.

The Finance

The article says this about finance.

Grand Union Trains has linked with European independent investment firm Serena Industrial Partners to support its ambitions for its new Great Western service, and the project is supported by Spanish operator RENFE.

Serena Industrial Partners are Spanish, so does that mean, that the trains could be Spanish too?

November 24, 2022 - Posted by | Finance, Transport/Travel | , , , , , , ,

3 Comments »

  1. Palletised freight or in roll cages if in a goods “van”. There is another problem in that the 390 and 802 class trains have passengers in every carriage, so if a goods van were inserted people would not be able to move up and down the train, or space would be lost in the van.

    Comment by R. Mark Clayton | November 25, 2022 | Reply

  2. I could see a two five-car Class 802 trains coupled together and running as a ten-car formation, with one train for passengers and the other for freight. Hitachi have a very comprehensive system, that tells the driver what he’s got and I could see as passenger traffic grows, the passenger train would have six-cars and the freight has four.

    The 390 would be useless for freight, as the tilting mechanism intrudes into the car.

    Trains could also split, so that freight and passengers went could go to different stations or terminals.

    Comment by AnonW | November 25, 2022 | Reply

  3. […] away beside the Grand Union Sets Out Stirling Ambitions article in the December 2022 Edition of Modern Railways is a report on Avanti West Coast’s […]

    Pingback by Avanti West Coast Applies For Second Hourly Euston And Liverpool Service « The Anonymous Widower | November 25, 2022 | Reply


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.

%d bloggers like this: