The Anonymous Widower

Exceptionally Low River Levels Raise Fears Over Water Supplies

The title of this post is the same as that of this article on the BBC.

This is the sub-heading.

Many of the UK’s rivers have hit exceptionally low levels and that could worsen in the next three months, according to the Centre for Ecology & Hydrology (CEH), raising questions over supplies to households, farmers and businesses.

These three introductory paragraphs add more details.

The warning comes after the driest spring in England since 1961, with northern regions experiencing the driest start to the year in nearly a century.

Almost all of the UK is expected to have below normal or low river levels in May, apart from the south-west of England.

The Environment Agency has said that the UK is at medium risk of drought and warned households of the risk of water restrictions.

In the 1970s, I was involved in a marginal way, in the planning of the water supply network in the UK, by the then Water Resources Board. My software called SPEED was used to solve the hundreds of differential equations involved.

Since the 1970s, I have felt, that as water supply in the UK has been fairly good, that the engineers, planners and mathematicians of the Water Resources Board didn’t do a bad job.

I don’t think, I can remember a period as long as this without rain.

I am drinking heavily to keep hydrated and I’m already today on my second bottle of Adnams Ghost Ship 0.5 % Beer.

But it just seems to go straight out through my skin, which I talked about in My Strange Skin.

I am Jewish in my father’s male line and Huguenot in my mother’s, so I have lots of ancestors, who lived in poor living conditions. So did Darwinian selection produce my leaky skin, that also heals itself quickly, in the harsh living conditions.

But on the other hand does it make me dehydrated all the time? And also create lots of red spots all over my body?

It’s not something new, as I can remember feeling this this as a child and helping my mother to count all the spots.

I hope that I will be fine, when we get some rain.

 

May 14, 2025 Posted by | Environment, Health | , , , , , , | Leave a comment

An Alternative Lift At Caledonian Road and Barnsbury Station

I went to look at something this morning, that might have made a post for this blog.

But as it wasn’t worth photographing, I decided to come home and decided to take a train home from Caledonian Road and Barnsbury station.

The station is of a slightly unusual design, which is described in Is Caledonian Road And Barnsbury An Ideal Four-Track Station?.

There is a wide island platform, where the Overground trains call on either side, which is connected to the station exit, by a half-bridge with lifts.

It was an affordable way to make the station accessible for all.

But today the lift on the island platform had failed.

  • As I approached the bridge on entering the station, a London Overground station-man was waving at me from the island platform.
  • He shouted at me, that the lift on the island platform had failed.
  • So I took the working lift and then walked across to the central lift tower, with its failed lift.
  • He met me at the top of the stairs and offered to escort me down.
  • But I said, that if I could go down the right hand side, with my good arm on the rail, I’d be OK.
  • He said that would be fine and he watched me descend, which I did safely.
  • Whilst I was there, two mothers with young children in buggies arrived on a train. So after a quick chat, the mothers carried their children up the stairs and he carried the buggies.

London Overground had certainly setup an alternative approach, that should work well until the lift is repaired.

Getting Home From Caledonian Road and Barnsbury Station

The Balls Pond Road of Round The Horne and Beyond Our Ken fame in the 1950s and 1960s, runs between Highbury and Islington and Dalston Junction stations.

  • I live about half way between the two stations and as, what would have been my nearest station; Mildmay Park closed in 1934, I have to get a bus from Dalston Junction to get home.
  • Today, though, I took a slightly longer route, but one with minimal walking.
  • I took a train four stops to Hackney Central station.
  • I used the bridge with lifts to cross the tracks at Hackney Central station.
  • I exited Hackney Central station through the second exit on Graham Road, that was opened in 2022.
  • After crossing Graham Road on a light-controlled crossing, I was able to catch a 38 bus to within a hundred metres of my house.

There would be no case for reopening Mildmay Park station, but as I get older this route is the easiest.

May 14, 2025 Posted by | Transport/Travel | , , , , , , , , , | Leave a comment

Haventus, Sarens PSG Unveil ‘On-Land to Launch’ Floating Wind Solution

The title of this post, is the same as that of this article on offshoreWIND.biz.

This is the sub-heading.

UK companies Haventus and Sarens PSG have developed a low-cost solution for the integration and launch of floating offshore wind turbines.

These two introductory paragraphs add more details.

Haventus said that it is working to enable offshore wind project developers to acquire fully assembled floating bases and turbines at Ardersier, Scotland, as well as providing dry storage which does not require complex licensing.

A heavy-lift solution will enable safe on-land integration and launch to the harbour of fully integrated floating offshore wind turbines.

Note.

  1. Haventus introduce themselves on their web site, as an energy transition facilities provider, offering pivotal infrastructure for the offshore wind industry. The first facility, they are developing is the Port of Ardesier in the North of Scotland, to the North-East of Inverness.
  2. Sarens PSG introduce themselves on their web site, as specialists in turnkey heavy lifting and transportation solutions for offshore wind component load-in, marshalling, assembly, deployment, and integration.

It looks to me that the two companies are ideal partners to put together flotillas of large floating wind turbines.

These two paragraphs seem to describe the objectives of the partnership.

This should shorten supply chains through single-site sourcing of key components and remove the operational, safety, logistical, and engineering complexity that comes with storage and integration activities in the marine environment.

The companies also said that the solution can also drive down the costs and accelerate floating offshore wind deployment by simplifying transport and installation requirements and remove the obstacles of weather and design life variables that must be considered with ‘wet’ storage and integration.

I was always told as a young engineer to define your objectives first, as you might find this helps with the design and costs of the project.

I do wonder sometimes, if the objectives of High Speed Two smelt too much of a project designed by lots of parties, who all had different objectives.

The Location Of The Port Of Ardesier

This Google Map shows the location of the Port of Ardesier in relation to Inverness, the Orkneys and Shetlands, and Norway.

The Port of Ardesier would appear to be ideally placed to bring in business for the partnership.

 

May 14, 2025 Posted by | Design, Energy | , , , , , , , , , , | Leave a comment