The Anonymous Widower

Sorting Out The Kirkby, Ormskirk And Southport Branches Of Merseyrail’s Northern Line

A Lot of changes will and could happen at the Northern end of Merseyrail‘s Northern Line in the next few years.

  • New bespoke Stadler trains will be introduced, that will run services from Liverpool to Kirkby, Ormskirk and Southport stations.
  • Class 319 and Class 319 Flex trains will start to appear at stations like Kirkby, Ormskirk and Southport, where Merseyrail’s network joins Northern Rail’s lines from Bolton, Manchester, Preston and Wigan.
  • A new station at Maghull North will be built.
  • Skelmersdale, which is one of the largest towns in the North-West without a rail connection, could be linked to Merseyrail’s  network.
  • A new Headbolt Lane station could be built to create a proper connection between Merseyrail and Northern’s trains using the Kirkby Branch Line to Wigan Wallgate station and onwards to Bolton, Manchester and Manchester Airport.
  • Ormskirk station could be remodelled to allow direct services Liverpool and Preston.
  • The Canada Dock Branch could be electrified and be opened to passenger trains.
  • The Burscough Curves could be reinstated.
  • The Southport to Manchester Line could be electrified.
  • Everton could be building a new stadium at Bradley Moore Dock.

In the next series of sections, I will cover some of these changes and issues raised in more detail.

Turn-Up-And-Go Services

Where I live in Dalston in East London, the London Overground run services at what they call a Turn-Up-And-Go service of four trains per hour (tph).

Merseyrail use this frequency on some of their lines, as do Birmingham and Leeds.

I wouldn’t be surprised to see this on some more routes in the North-West, where there is sufficient demand.

Can Stadler’s New Trains And Class 319 Trains Share The Same Tracks and Platforms?

I’m not sure about this, as until we see the new trains and/or their specification making a comparison is difficult.

  • Both trains can run on third rail electrified lines, although most of the current Class 319 trains working in the North West have had their third rail equipment removed.
  • The Stadler trains must be designed to work with the current Class 507 and Class 508 trains, which they probably must do during the introduction phase.
  • So could there be size problems between Stadler’s and the Class 319 trains?

But seeing how Stadler are always a company for the main chance, I wouldn’t put it past their engineers to design a train, that can work the same routes as all variants of the Class 319 trains, as replacing them in a few years time would be a nice little earner.

There is also plenty of words in the media, which state that 25 KVAC overhead capability can be added to the Stadler trains, so they can work lines out of Liverpool Lime Street.

As an aside here, I should mention the Halton Curve, which is to be upgraded to create a new route between Liverpool and Chester.

Under Upgrade in the Wikipedia entry for the Halton Curve, this is said about the building of the curve and its future services.

The Liverpool City Region Combined Authority approved the work in April 2016, utilising Government’s Local Growth Fund (LGF) funding £10.4 million, adding an additional £5.67 million from the city’s LGF. Work is hoped to start in June 2017 and to be completed in May 2018. This should lead to an hourly service between Liverpool and Chester from December 2018 along the curve with some services extending into North Wales.

With their dual voltage and electro-diesel capability, the Class 319 Flex trains must be an ideal train to work services to Chester and North Wales via the Halton Curve.

So I suspect there could be a lot of compatibility between the current Merseyrail trains, the new Stadler trains and the Class 319 trains, as otherwise it could be tricky to work the Halton Curve to Chester, until the new Stadler trains are delivered.

This leads me to say that  there should be no problems with both sets of trains sharing platforms and tracks on the surface branches of the Northern Line to Kirkby, Ormskirk and Southport.

I suspect that the Class 319 trains could also work the Northern Line tunnels, but I suspect that would be a step too far for Merseyraiil and they would prefer their network to be reserved for their new Stadler trains as much as possible.

Canada Dock Branch

The Canada Dock Branch will have a large influence on what happens  to the rail services in the North of Liverpool.

There will be a massive increase in capacity of Liverpool Docks after the completion of Liverpool2.

Under Freight Use in the Wikipedia entry for the Canada Dock Branch, this is said.

Due to the construction of Liverpool2 container terminal at the port of Liverpool the line will increase in freight traffic. In May 2016 it was announced that the line’s final section into the dock estate would be upgraded to double track from single track to increase capacity to the port. Combined with improved signalling at Earlestown, the improvements will enable up to 48 trains a day to enter the port. Work on the line is expected to be completed by 2019.

How many trucks is that going to remove from the M62?

Under Passenger Use in the Wikipedia entry for the Canada Dock Branch, this is said.

The line is also being seriously assessed for reopening to passengers with Everton F.C. and Liverpool F.C. stadia both located on the line’s route.

On 16 July 2007 the Liverpool Daily Post reported that Liverpool F.C. may partially fund the reopening of the line to passenger services providing a direct rail link to the proposed Stanley Park Stadium however this project has since been dropped by the club. This was highlighted on the Network Rail North West development plan as a potential project to be undertaken by Network Rail, rather than Liverpool F.C..

The Department for Transport’s Rail electrification document of July 2009, states that the route to Liverpool Docks will be electrified. The Canada Dock Branch Line is the only line into the docks.

Add this to 48 freight trains per day running into the Docks and this must surely result in the Canada Dock Branch being electrified between Liverpool Docks and where the Branch joins the electrified Liverpool and Manchester Lines at Wavertree Technology Park station.

This is also said about passenger services.

The electrification of this branch line would greatly assist in recommissioning passenger trains, as costs would be reduced. The electrification of the Liverpool and Manchester line will reduce travel time from around 45 minutes to 30 minutes between the two cities due to the greater acceleration achieved by electric trains in clearing lines quickly, and the raising of the speed limit along the line from 75 to 90 mph. These advantages will cascade onto the Canada Dock branch line. Class 319 dual-voltage, 3rd rail and overhead wires, EMUs will be fully refurbished and transferred from the Thameslink route to operate between Liverpool, Wigan and Manchester. The dual voltage trains can operate on Merseyrail’s 3rd rail network giving greater scope for route planning.

There is also a serious suggestion to introduce passenger services on this line in the Local Transport Plan for Merseyside. This was again mentioned in Merseytravel’s 30-year plan of 2014.

Putting the comments about electrification, passenger services and 319 trains together with Network Rail’s performance as regarding electrification in the North-West, I now feel that Porterbrook, Northern Rail and Rail North have thrown a very large drum of lubricating oil into the mix in the shape of the Class 319 Flex train.

A passenger service could be run along the Canada Dock Branch, as soon as the following conditions are met.

  • Some stations have been built or reopened.
  • The route is appropriately signalled, tested and certified.
  • A small number of Class 319 Flex trains are available.

Electrification can come later.

 

This Google Map shows Kirkdale  station on the Merseyrail Northern Line.

Note the dark cutting going North-East to South-West across the map. With a more detailed resolution, I can see railway tracks in the bottom.

This is the Canada Dock Branch.

So what do I think will happen and where would I put my money?

  • Electrification
  • A passenger service.
  • A station to serve Liverpool and Everton Football Clubs
  • Some other stations
  • An interchange at Kirkdale station between the Canada Dock Branch and the Northern Line.

It will be interesting to see what happens to the Canada Dock Branch.

Headbolt Lane Station

Headbolt Lane station is Merseyrail’s solution to connecting the single-track Kirkby Branch of the Northern Line to the double-track Kirkby Branch Line from Wigan  Wallgate station in an efficient manner.

I wrote about this station in An Overview  Of Headbolt Lane Station

 

Kirkby Or Headbolt Lane To Manchester

In this section, by Kirkby, I mean Kirkby and/or Headbolt Lane. The former would apply now and the latter, when it is built.

Currently, a train running between Kirkby and Salford Crescent stations takes around 60 minutes, via Atherton.

If I apply Irene’s Law, which admittedly applies to London Underground journeys, but seems to work in a rough manner on intensive urban and suburban lines, I reckon that an electric train can do the following.

  • Salford Crescent to Manchester Piccadilly – 6 minutes
  • Salford Crescent to Manchester Victoria – 4 minutes

So it leads me to think that a Class 319 Flex train, which is faster than the current Class 156 train, could probably do Kirkby to either of the two Manchester stations in under an hour.

This would mean the following.

  • To provide a two tph service  to Manchester would require four trains.
  • To provide a four tph service  to Manchester would require eight trains.

Where the benefits come, is when all the lines are electrified, which means faster speed and quicker stops.

Take the four tph service between Dalston Junction and New Cross. As the service takes 22 minutes, the round trip can be done within an hour, giving drivers time to turn the train and have a comfort break or a coffee.

So this shorter route will only need four trains to porovide a four tph timetable.

Anything that can be done to reduce the journey time, means the required frequency can be attained with a smaller number of trains.

Going back to the Kirkby to Manchester service.

There is a bay Kirkby/Southport-facing platform at Wigan Wallgate station, which is shown in this Google Map.

And here’s a picture of the platform.

According to Wikipedia, the bay platform is for trains for Southport and Kirkby.

Wigan to Kirkby is currently scheduled at 24 minutes, which I suspect is so that a Class 142 Pacer can do a complete trip within the hour.

So this would mean the following.

  • 2 tph between Kirkby and Manchester would need 4 trains.
  • 2 tph between Kirkby and Wigan Wallgate would need 2 trains.

So two trains have been saved.

But Kirkby to Wigan Wallgate is run at a Turn-Up-And-Go  frequency of 4 tph, where the trains have cross-platform access to Liverpool to Kirkby trains with the same frequency.

Southport To Manchester

I wasn’t intending to look at Southport to Manchester now, but as I’ve just looked at Kirkby to Manchester and the two routes both go through Wigan Wallgate station, I’ll do it to follow the Kirkby analysis.

Currently, a train running between Southport and Salford Crescent stations takes just over 60 minutes, via Atherton, with Southport and Wigan Wallgate taking thirty minutes.

So at a quick look, it would appear that

So this would mean the following.

  • 2 tph between Southport and Manchester would need 4 trains.
  • 2 tph between Southport and Wigan Wallgate would need 2 trains.

If the timings were aligned, every inbound Wigan Wallgate service from both Kirkby and Southport would arrive at Wigan Wallgate, in front of a Manchester service, which could take them to where they wanted to go, if it was beyond Wigan.

So with 12 trains, the following lines could get these services.

  • 4 tph Kirkby to Wigan Wallgate
  • 4 tph Southport to Wigan Wallgate
  • 2 tph Wigan Wallgate to Salford Crescent via Bolton
  • 2 tph Wigan Wallgate to Salford Crescent via Atherton

From Salfrord Crescent, passengers will after the Ordsall Chord and the related works have been completed, be able to get easily to Deansgate, Hazel Grove, Manchester Airport, Manchester Oxford Road, Manchester Piccadilly, Manchester Victoria, Salford Central, Stockport and probably a few others too.

Obviously, there are other and better patterns.

But it just shows what can be done, by creating a network of electrified and pseudo electrified lines into Manchester and funnelling them through a series of interchanges.

The Burscough Curves

There were some good thngs done by British Rail in the 1960s and 1970s, but there were some supreme examples of crap design.

This Google Map shows trhe Burscough Curves, which I suspect were originally designed to make operation of trains to the South East of Southport a lot more efficient.

There are two railway lines on the map.

Connecting them are the North and South Burscough Curves.

This description of the Burscough Curves, is a simplified version of that in Wikipedia.

During the rail restructuring of the 1960s and 1970s, the “Burscough Curves”, which formed a link between the Ormskirk-Preston and Southport-Wigan lines were removed, although the formation survives. The North Curve was taken out of use and severed in July 1969, being lifted in 1973: it was last used for a Saturdays only empty train from Blackpool to Southport. The South Curve was singled in 1970, but remained in use to serve the extensive sidings at the MOD depot located just to the north of Burscough Junction station. It saw its last train in 1982.

The passenger service from Ormskirk to Burscough Junction and on to Southport, which used the southern curve, was withdrawn in 1962

Pressure from local transport groups,  has not so far persuaded Network Rail to reinstate the curves. Various schemes have been proposed, including the full electrification of the line from Southport via Burscough to Ormskirk using the same third rail system as Merseyrail. This proposal would allow users of the Ormskirk branch of Merseyrail’s Northern Line to reach Southport directly.

Wikipedia also says something of how they might be used in the future.

A new study being conducted by Merseytravel could see demand for a potential reinstatement and electrification of the curves in the near future. The uses of the curves in a new service pattern has been identified by Network Rail, if electrified along with the through lines.

One factor more than any other will decide what happens to the Burscough Curves and the possible opening of a through route from Ormskirk to Preston and that is new housing developments in the area.

It has already contributed to the need to open Maghull North station to relieve pressure on Maghull station

Midge Hall on the Ormskirk Branch Line could be the next to open.

Ormskirk To Southport

This is mentioned in my extract from Wikipedia’s entry for the Burscough Curves.

I suspect that any reinstatement of the Burscough Curves would develop this alternative route from Liverpool to Southport.

Ormskirk To Preston

If you take one of the new Northern Electrics from Liverpool Lime Street to Preston, it’ll take you 58 minutes.

If you go the other way by taking a Merseyrail train from Liverpool Central  to Ormskirk and then a train for Preston, it will only take you just seven minutes longer.

The time could and probably will be reduced in the next few years.

  • When the new faster Stadler trains are running to Ormskirk, it is likely that 6-7 minutes will be taken off the time.
  • Eliminating the change of trainat Ormskirk could reduce the time.
  • But new modern trains could go much faster on an improved Ormskirk Branch.

I would estimate that times of forty minutes could be achieved, with perhaps a frequency of two tph.

Higher frequencies like 4 tph, would probably need full restoration of the second track between Ormskirk and Preston.

This fast time would attract passengers and especially those living in the North of Liverpool and on the coast to Southport.

But other factors would also help.

  • Fast trains to the North and Scotland will call at Preston and going via the Ormskirk  Branch may be more convenient for many.
  • Aintree station is five stations South of Ormskirk, so  the route may offer a quick way to the races.
  • The Open is at Royal Birkdale this year.

I have a feeling that extending the Northern Line from Ormskirk to Preston, with a well-thought out treatment of the Burscough Curves, may produce lots of passengers that the train companies didn’t think existed.

Everton’s New Stadium

Everton may well be building a new stadium at Branley Moore Dock, which is between Sandhills station and the City Centre.

For a new sports ground, that could be the centrepiece of a Commonwealth Gales in 2022 or 2026, it is well-placed and not far from Merseyrail’s Northern Line.

I have discussed this project in Everton’s New Stadium.

Except for possibly changes of services at times, it should not affect operation of services on the Northern Line.

 

 

 

 

 

 

 

 

 

March 18, 2017 Posted by | Transport/Travel | , , , , , | Leave a comment

Reopening The Anglesey Central Railway

Note that this post was updated in October 2021.

The Anglesey Central Railway is a disused branch railway, where the track-bed is intact although overgrown, that runs across the Island of Anglesey from the North Wales Coast Line to the port town of Amlwch.

It carried freight until 1993 and is one of those remote lines, where a case can be made for reopening., using simple station designs and affordable trains.

On its route it serves the County Town of Llangefni and these stations are proposed, either on the branch or the island

With the existing stations on the North Wales Coast Line, a useful local railway could be created.

But would it be value for money?

These are a few of my thoughts.

Bangor Station

Bangor station looks like the ideal place to terminate the service from the Anglesey Central Railway.

This Google Map shows Bangor station.

Note.

  1. Anglesey is to the West.
  2. There are four tracks through the station. This will allow trains to overtake.
  3. Only the outside two tracks have platforms.
  4. The platforms are long enough to handle at least a two-hundred metre long train. They could even be long enough to handle a pair of Aventi West Coast’s new Class 805 trains, which would be 260 metres long.
  5. There are a couple of Anglesey-facing sidings, which probably could be converted into at least one bay platform.
  6. I suspect in a city like Bangor, there is probably enough electric power to provide charging facilities in an Anglesey-facing bay platform.

I can’t see any problems with terminating Anglesey Central Railway services at Bangor.

Battery-Electric Trains Between Bangor And Amlwch

Consider.

  • Bangor and Amlwch would be around 25 miles.
  • Modern battery-electric trains have a range of up to 80 miles.
  • Battery-electric trains can fully recharge in 15 minutes.

This means that with charging facilities at Bangor, modern battery-electric trains could handle a return journey between Bangor and Amlwch.

I suspect that a very acceptable two trains per hour (tph) should be possible.

Hydrogen Trains Between Bangor And Amlwch

These would also be possible, once a refuelling strategy has been decided.

 

March 17, 2017 Posted by | Transport/Travel | , , , , , | 6 Comments

Developing The Ebbw Valley Railway

There are various developments proposed for the Ebbw Valley Railway.

A Second Hourly Service To Newport

In Proposed Additional Services in the Wikipedia entry for the line, this is said.

A second hourly service to Newport is proposed for the line. A South East Wales Transport Alliance (Sewta) report in 2006 noted that additional infrastructure work would be required to enable the service to become half-hourly (one train running to Cardiff and another to Newport). An additional seven miles (11 km) of double track would be needed between Aberbeeg Junction and Crosskeys and additional platforms at Newbridge and Llanhilleth stations would be required.

Network Rail says additional work needs to be done, but from various news reports, the service from Ebbw Vale Town to Newport is some years away, but could be completed in 2018.

Possible Stations

In A Look At New Station Projects, I’ve found several.

  • Aberbeeg has  been proposed for reopening.
  • Abercarn has been proposed for reopening.
  • Abertillery has been proposed for reopening on a new branch.
  • Cwm has been proposed for reopening.

I’m sure there could be others.

 

March 17, 2017 Posted by | Transport/Travel | , , | 1 Comment

Riding In A Clean Class 319/4 Train

The Class 319/4 train is the upmarket version of the Class 319 train with First Class seats, less 2+3 seating and a fully-accessible toilet.

I took the pictures on a particularly neat and tidy Thameslink train.

It is likely that the Class 319 Flex train will use this interior, especially as the prototype is a conversion of a Class 319/4 train.

According to Wikipedia, there are still 23 Class 319/4 trains in service with Thameslink, with a few actually off lease, so there should be quite a few of this variant to convert.

In the article in Rail Magazine, which is entitled Flex… and flexibility, this is said.

One unit has moved to Loughborough (319427), but this is not one of the eight destined for Northern. Instead, it will be deployed for dimensional analysis. Only so much can be planned on paper and computers, and this will enable the various teams to evaluate the train and ensure everything fits.

Sounds like good engineering and as the train was off lease, it probably wasn’t one of best, so if it eventually becomes a spares donor or scrap, no-one is probably bothered, given that there are quite a few Class 319/4 trains available for conversion.

In fact after riding in a couple of Northern’s Class 319 trains last week, I definitely felt that the Class 319/4 train in the pictures, rode a lot better and more like what you’d expect from a train derived from a Mark 3 coach.

Conclusion

The more I read and observe about the Class 319 Flex train, the more I like the project.

I wonder how much a new bi-mode four-car multiple unit would cost? As a rough guide London Overground are paying nearly six million for each of their Class 710 trains.

Class 319/4 trains converted to Class 319 Flex trains will have the following extra and proven features.

  • 100 mph as against 75 mph top speed.
  • 91-92 mph top speed away from wires on diesel.
  • First Class seating
  • Fully-accessible toilet.
  • The ability to survive a direct hit from a 24 tonne cement mixer truck dropped from a bridge.

But the Class 319 Flex is not a new train.

The Oxshott incident with the cement mixer truck, did happen to a Class 455 train, but this is also Mark 3 coach-based, like the Class 319 train.

March 17, 2017 Posted by | Transport/Travel | , , , , | 2 Comments

DOO – Analysed & Explained

This article in Rail Staff is a must-read about the dispute.

It is a detailed article and if you are short of time, just read the last paragraph entitled Looking Forward.

March 16, 2017 Posted by | Transport/Travel | , | Leave a comment

Why Not Buxton To Hellifield?

Hellifield station, which connects to the Settle and Carlisle Line, is the Northernmost station on the Ribble Valley Line from Manchester and Blackburn.

I’ve not been there, as you need to get there from Blackburn on a Sunday, but surely, as a conductor told me, Northern Rail should provide a service seven days a week.

The Track To Hellifield

This is an extract from an e-mail from Ribble Valley Rail.

The line north of Clitheroe to Hellifield is entirely double track (in use) with a double track junction on to the S&C line at Hellifield South Junction at the south end of the station.  Approximately 19 sets of points and a large amount of trackwork were renewed at Hellifield a few years ago.

They also said, that there is one small addition, they would make at Hellifield, but if services to Hellifield get a lot more numerous, I’m sure Network Rail would do what is necessary.

As the line is double-track from Blackburn to Hellifield, this would mean that running more trains on the line is determined by the number of passengers and the revenue and profit generated, rather than some quirky passing loop by a level crossing or some of British Rail’s pitiful attempts to save money.

Blackburn to Hellifield is a real railway.

Platform Lengths

The e-mail from Ribble Valley Rail, also said this about platform lengths.

All Ribble Valley intermediate stations were lengthened a few years ago and can now accommodate 4-car class 150s which now operate quite regularly, especially on Sundays.    4-car class 156 do overhang and involve locking some doors out-of-use until Blackburn or Clitheroe.

So how long is a four-car formation of the various trains?

I included the Class 172, as it’s a typical modern diesel multiple unit.

So Porterbrook’s new train has an advantage in that British Rail made the Bedpan Specials, a little bit shorter, to save steel and other materials.

I’ve just received another e-mail where this is said.

Despite the lengthening of the Ribble Valley line intermediate stations, because of various constraints with adjacent bridges they have finished up different lengths.  The shortest is the Down platform at Ramsgreave & Wilpshire which I am told is79 m.  However a 4-car class 150  does fit on with careful stopping, all doors on the platform and only a slight overhang of the train at each end.

Look at this picture of a Class 319 train.

The end passenger doors would appear to be several metres back, so the train fits a platform, that is a few metres shorter than the train. Was this British Rail’s solution to the non-invention of selective door opening?

Health and safety might want a little fence on the platform, but it looks like the Class 319 trains were designed so that British Rail could get away without lengthening platforms on Thameslink.

Current Timings On The Route

These are timings of the various sections of the whole route from Buxton to Hellifield.

  • Buxton to Hazel Grove (up) – 37 minutes
  • Hazel Grove to Buxton (down) – 33 minutes
  • Hazel Grove to Stockport – 9 minutes
  • Stockport to Bolton – 48 minutes
  • Stockport to Manchester Piccadilly – 22 minutes for a Hazel Grove to Blackpool North train via Bolton
  • Stockport to Manchester Piccadilly (fastest) – 9 minutes
  • Bolton to Manchester Piccadilly (fastest) – 22 minutes
  • Bolton to Blackburn (up) – 29 minutes
  • Blackburn to Bolton (down) – 26 minutes.
  • Blackburn to Clitheroe (up) – 26 minutes
  • Clitheroe to Blackburn (down) – 23 minutes
  • Clitheroe to Hellifield (up) – 25 minutes
  • Hellifield to Clitheroe (down) – 11 minutes

Note the differences between up and down times.

Based on these timings, I reckon that these timings are possible now with a Class 150 or Class 156 train.

  • Buxton to Blackburn – 102 minutes
  • Blackburn to Buxton – 103 minutes
  • Buxton to Clitheroe – 128 minutes
  • Clitheroe to Buxton – 126 minutes
  • Buxton to Hellifield – 153 minutes
  • Hellifield to Buxton – 137 minutes

This would give round trip times something like these.

  • Buxton to Hellifield – 290 minutes
  • Buxton to Clitheroe – 254 minutes
  • Buxton to Blackburn – 205 minutes

Obviously, the two turnround times would have to be added.

But various factors would reduce the times, if a Class 319 Flex were to be used from December 2017.

  • The route will be fully electrified between Bolton and Hazel Grove stations.
  • Two trains per hour will be possible between Bolton and Blackburn from December 2017.
  • The Class 319 Flex is a 100 mph train.
  • As the Class 319 Flex has been optimised to climb the hills, it must be faster on the uphill sections.
  • Drivers have told me, that the Class 319 train has excellent brakes, so they may be faster coming down.

The Bolton to Hazel Grove route is currently timetabled at 48 minutes. But surely a 100 mph electric train can knock quite a few minutes off that, when the route is fully electrified.

If this section could be done in thirty minutes, which I suspect is possible, this brings the round trip times down as follows.

  • Buxton to Hellifield – 254 minutes
  • Buxton to Clitheroe – 218 minutes
  • Buxton to Blackburn – 169 minutes

In some ways the interesting one is the round trip from Buxton to Clitheroe, which allowing ten minutes for each turnround at Clitheroe and Buxton means that the round trip is under four hours.

This means that an hourly Buxton to Clitheroe service would need four trains and two trains per hour would need eight trains.

The Blackburn Service From December 11th 2017

On this day Northern  introduced two trains per hour between Manchester Victoria and Blackburn along the Ribble Valley Line, with one train per hour exytending to Clitheroe.

If the service went to Buxton instead of Manchester Victoria, I think this service would require seven trains. If the Clitheroe service was extended to Hellifield, that would need another two trains.

Conclusion

I wonder when the real timings are obtained using Class 319 Flex trains, what cunning plan Northern Rail will come up with, to satisfy their passengers, staff and profits.

Marketing says that running between Hellifield and Buxton on a 24/7 basis, even at one train every two hours could be a very popular route.

March 14, 2017 Posted by | Transport/Travel | , , , | 4 Comments

Thoughts And Facts About Class 319 Flex Trains From Manchester And Blackburn Into The Hills

On Thursday and Friday last week, I spent two days in the Premier Inn at Blackburn and explored the rail lines around the town with journeys all over the area that should by now have been fully electrified.

Class 319 Flex Trains

The main reasons to go was to see some Friends In The North and to see Ipswich play at Barnsley, but I also wanted to explore some of the hilly routes in Lancashire.

Porterbrook in their brochure for the Class 319 Flex trains says that the objective for the train is that it can run from Manchester Piccadilly to Buxton on the Buxton Line, under the power that is available, which is electrification only as far as Hazel Grove station.

The Routes With Hills

There are three routes from Manchester and Blackburn that climb into the hills.

The lines are not for low-powered trains and the  current Class 150 or Class 156 trains struggled on the three climbs I did.

  • Hazel Grove to Buxton in the afternoon.
  • Blackburn to Clitheroe early in the morning.
  • Bolton to Blackburn, crush-loaded in the rush hour.

Someone told me, that leaf fall can be a problem in the Autumn.

In no particular, these are my thoughts and some facts from other sources and my observations.

Blackburn Depot

A conductor told me that Northern Rail will be creating a depot and basing train crew at Blackburn.

This article in the Lancashire Telegraph is entitled Multi-million pound train depot set for Blackburn.

This is said.

Blackburn is to get a new multi-million pound train depot as the latest stage of East Lancashire’s rail revolution.

The stabling, maintenance and cleaning centre will include an office block and new connection to the existing Bolton junction where the tracks to Preston and Darwen divide.

If as I believe the Class 319 Flex trains could serve Clitheroe/Hellifield and Colne, then it could be an ideal location. Especially, if the Clitheroe/Hellifield and Buxton services were run back-to-back across Manchester.

Double Track Most Of The Way

The three lines have the following track layouts.

  • The Ribble Valley Line has a large proportion of double track, which stretches to Hellifield.
  • The Buxton Line is double-track.
  • The East Lancashire Line is single-track from Rose Grove station to Colne station.

So hopefully, if two trains per hour (tph) were to be run on these three branches, passing would be possible.

Hellifield

Hellifield station is where the Ribble Valley Line connects to the Settle-Carlisle Line.

A conductor told me that he’d heard that Northern would like to serve Hellifield more regularly.

Since I first wrote this, I’ve heard that the tracki at Hellifield has been recently replaced and is in good condition.

Housing And Other Property Development

As I travelled along the lines to Clitheroe and Buxton, there was a lot of housing development along the line, at places like Clitheroe, Hazel Grove, Whalley to name just three.

The crowded trains I used in the Peak to Blackburn are going to carry even more passengers and the need for capacity with power on these lines will increase.

Tourism Issues

Buxton, Clitheroe Colne and Hellifield all have reasons for tourists and especially those that enjoy visiting the hills.

I have no figures to back it up, but I suspect leisure passengers often go loaded with children in buggies, bicycles and heavy rucksacks and cases. They certainly do in the Summer on the trains of East Anglia and that is flat.

Add in the weather forecast and the effects of new trains and at times, there could be a large increase in leisure and tourism-related travel.

If the trains connected the Settle and Carlisle Line at Hellifield to Blackburn, Manchester and perhaps Buxton, this would surely open up a tourist train route, that Doctor Beeching wouldn’t have thought was the least bit feasible.

Future Train Frequencies

Train frequencies to Manchester could possibly grow to the following.

  • Blackburn – 2 tph to Manchester Piccadilly
  • Blackburn – 2 tph to Manchester Victoria
  • Buxton – 2 tph
  • Clitheroe – 2 tph
  • Hazel Grove – 4 tph

In addition, the intersecting route from Blackpool South to Colne via Preston and Blackburn, could be running 2 tph.

I do suspect though, that 1 tph to and from Hellifield will be enough. But who knows? I could just be as wrong as Beeching.

The lines probably have a Peak problem, that is fairly unusual in the UK, but probably is common in countries with real mountains like Austria, Japan and Switzerland. One direction of Peak travel is downhill, but the other is up a very steep railway.

On train frequencies, this is said in the Wikipedia entry for the Ribble Valley Line.

A six-week engineering blockade saw the existing passing loop there extended by 1 mile (1.6 km) at each end and signalling improvements made to add capacity on the line and allow for service frequencies between Bolton & Blackburn to be doubled to two trains per hour each way throughout the day from December 2017.

Could this be why, Porterbrook are planning to deliver four refurbished Class 319 Flex trains by the end of 2017, according to their brochure?

Some powerful extra trains will probably be needed to achieve the objective of 2 tph to Blackburn and four Class 319 Flex will help.

Future Train Capacity

I did two journeys in the Peak to Blackburn; in the first I took the slower service via Todmorden and Burnley in a two-car train and in the second, I took the direct route via Bromley Cross, in a four-car formation.

The second was the most crowded, but it was Friday. It also struggled up the hill from Bolton to Blackburn.

Northern’s decision to go for a four-car Class 319 Flex train which could be used on some of these routes, is understandable.

Blackburn To Huddersfield

I travelled to Huddersfield station from Manchester Victoria and didn’t see any signs of electrification on this important route.

Returning to Blackburn from Huddersfield, my train was a direct service which travelled via Manchester Victoria, Bolton and Bromley Cross.

This would be an ideal service to run using a Class 319 Flex train, until Network Rail get their act together and electrify Manchester Victoria to Huddersfield. Even if they only get the wires as far as Stalybridge, the Class 319 Flex would be an enormous improvement compared to the asthmatic Class 156, that struggled with its full load of passengers to Blackburn.

The Calder Valley Line

The Calder Valley Line goes through very picturesque countryside between Preston and Leeds.

I think that full electrification of this line could never happen.

  • The line has large numbers of stone and brick viaducts and bridges, which would be very expensive to modify for electrification.
  • The station at Hebden Bridge is Grade II Listed.
  • There is electrification between Leeds and Bradford, which could probably be extended as far as Halifax.
  • Preston is fully electrified and affordable electrification to Blackburn or perhaps Rose Grove or Burnley Manchester Road stations should be possible.
  • Electrification to Rose Grove would mean that the service between Blackpool South and Colne could be run using electricity between Rose Grove and Kirkham and Wesham stations.

But the biggest problem would be the opposition to overhead gantries in the hills.

The distances are revealing.

  • Burnley to Halifax is just over twenty miles
  • Blackburn to Halifax is just over thirty miles.

If Halifax to Bradford wasn’t electrified then that adds another ten miles.

All distances would be within range of a modern bi-mode train, including a Class 319 Flex.

Other Destinations

From Hazel Grove, it is possible for diesel trains to access the Hope Valley Line towards Sheffield.

There must be stations on this line that are possible destinations for a Class 319 Flex train.

Chester and Windermere have also been mentioned as future destinations for the train.

Electrification

Electrification has been painfully slow in the North-West, as it has in most places in the UK.

It looks like that by the end of 2017, Manchester to Preston via Bolton and the Blackpool Branch to Blackpool North station will be electrified.

The advantage of the Class 319 Flex is that it can use this electrified set of lines to run services to stations like Barrow, Blackburn, Blackpool South, Burnley, Chester, Hebden Bridge, Sellafield and Windermere, that are off the electrified network in conjunction with the Class 319 trains.

The Need For A Train To Climb The Hills

From this brief analysis and my observations, it would seem that Northern need a few four-car trains with adequate power to get up the hills at a speed, that enables an efficient timetable. As some of the routes from Manchester Piccadilly and Victoria are electrified, the ideal train would need the capability to use the wires.

If ever, there was a series of routes that need a bi-mode train, then it is these routes.

The Class 319 Flex And The CAF Civity

The Class 319 Flex has according to the brochure I’ve seen been designed to run from Manchester to Buxton with a full load of passengers in the Peak or perhaps after a City-United Derby.

But Northern have ordered new CAF Civity trains in the following versions.

This is said in the Wikipedia entry for the Class 331 trains.

In early 2016 it was confirmed that Spanish rolling stock manufacturer CAF would construct the new electric powered trains which are planned to operate in West Yorkshire to replace Class 321 and Class 322 trains and work alongside the current fleet of Class 333 units. The four-car Class 331 units will be deployed on electrified services from Manchester Piccadilly to replace the Class 323 units which are due to return to Porterbrook at the end of their current lease in 2018.

So it would appear that the Class 319 trains will continue to operate for a few years yet! Hopefully with better seats, wi-fi and a few other smaller improvements.

I think that Northern have decided that until the Class 195 trains arrive that the Class 319 Flex trains are the best short-term solution. But given the overcrowding on the routes will the future three-car trains have enough capacity?

So I suspect, if Northern go the CAF Civity route, I feel that Northern will acquire some longer diesel trains or even some dual-power Civitys.

But at least running Class 319 Flex trains on the route will effectively produce the specification for these hilly routes.

 

 

March 13, 2017 Posted by | Transport/Travel | , , , , , , | Leave a comment

Is Ilkeston Station Going To Open Early?

National Rail’s journey planner doesn’t get it wrong often.

So look at the screen-shot for Monday 27th of March.

Ilkeston station isn’t supposed to open until the 2nd of April.

Searching the on-line timetable shows it is just Northern Rail’s Nottingham-Leeds services that seem to call both ways.

Is it the truth, finger trouble or even Fake News?

March 12, 2017 Posted by | Transport/Travel | , | Leave a comment

From Liverpool To Huddersfield

These pictures document a trip I took between Liverpool and Huddersfield.

Some thoughts on the trip.

The Class 319 Interior

The first batch of Northern’s Class 319 trains are very much pack-it-in specials for running commuter services around the Blackpool, Liverpool, Manchester Airport triangle.

They are good for a thirty-year-old train, but they could be better.

In Porterbrook’s Class 319 Flex brochure, they show a proposed interior based on a Class 319/4 with the following.

  • A mix of 2×2 and 2×3 seating.
  • 12 First Class seats
  • 255 Standard Class seats
  • A full-accessible toilet.
  • Two luggage racks per car.

It would certainly be a much better passenger experience.

Works At Edge Hill

Buckingham Group obviously have a big project on to the East of Edge Hill station.

This Google Map shows the lines through and to the East of Edge Hill.

Note how to the South of the Retail Park and/or warehouses, work seems to be going on. Are extra tracks being created?

There is also a white scar at Wavertree Technology Park station, so if this was two fast lines, then fast services between Liverpool and Manchester and Wigan could storm in and out.

The Atherton Line

The Atherton Line is part of the Manchester-Southport Line and runs between Wigan Wallgate and Salford Crescent stations.

Wikipedia says this about Improvements to the Atherton Line.

There is ongoing feasibility into the conversion of parts of this line (Wigan–Atherton–Manchester) to operate as a Manchester Metrolink service with a higher frequency metro service for the Greater Manchester Boroughs of Wigan and Salford into the city centre. In November 2013, the Greater Manchester Combined Authority approved a recommended strategy for reconfiguring existing commuter services into tram-train operation, identifying the Atherton line as providing an opportunity for extending potential tram-train services from the south-east (Marple, Glossop) across the city centre and outwards to the north west.[2] Southport and Kirkby services on this line would be diverted to operate via Bolton. Additionally, Network Rail has identified electrification of Wigan to Southport, together with the Ormskirk–Preston line and the Burscough Curves as a possible source of new services.

I also think that the route from Salford Crescent to Southport via Atherton and Wigan could be ideal for electrifying in stages using Class 319 Flex trains to bridge any gaps.

The tools seem to be there, now is the time to think about how the work will be done.

Salford Crescent

Salford Crescent station could look very different in the future, as modern station design might be seen to favour two island platforms, one face of each dealing with Manchester Victoria station and the other Manchester Piccadilly station.

  • Passengers going in to Manchester, needing trains to the other terminus, would just wait on the platform and catch the next train.
  • Passengers coming from Manchester, who needed a different distination would change at Salford Crescent to their desired train.
  • Comprehensive information would be provided.

The platforms would be built with lots of space, waiting rooms and coffee kiosks and would be well-staffed.

Manchester Victoria Station

Manchester Victoria station is starting look dirty again.

It must be all those elderly diesel trains.

Huddersfield Line

The Huddersfield Line took me to Stalybridge station and then later on to Huddersfield station.

There was no sign of any electrification work.

Stalybridge Station

As a coeliac, I found Stalybridge station one of the most gluten-free-unfriendly stations I have ever found.

In future, if I’m going that way, I’ll make sure that I stock up in Manchester or Leeds first.

TransPennine Express

The train was crowded and getting on at Stalybridge for the short trip to Huddersfield was delayed, as the conductor couldn’t get near to the doors to open them. Whereas the driver could have had a clear view.

It’s about time the NUR stopped this Driver Only Operation farce, which nearly all passengers think is sillier than the Teletubbies.

I hope the idiot, who landed TransPennine routes with the inadequate number of Class 185 trains, now has a job where he can do no harm, like in charge of the railways on the Scilly Isles.

Huddersfield

I don’t know Huddersfield and the only thing I’ve ever bought in the town is a ticket to the football.

You arrive in the Grade I Listed Huddersfield station and walk out into the magnificent St. George’s Square, which should be a welcoming gateway to the town.

Compare it to Kings Cross Square, where there is generally something going on and on a Friday is bustling with food stalls.

I walked to the shops and did find Marks and Spencer in a prominent place, but why wasn’t the route for pedestrians only, as it was crammed with traffic and parked cars.

Huddersfield needs to think how they organise their town centre, as except for the square ut’s about as weloming to visitors as Turkey is to the Dutch.

This Google Map shows the area.

I feel that Huddersfield needs what most European towns of this size would have and that is a tram, that goes through the centre.

You would walk out of the station and in the square would be a tram stop. Trams would go South along a pedestrianised John William Street and New Street. Obviously the route would be designed to go through the town to the main hospital, the University and if possible the the Council Offices, the Courts and the football/rugby stadium.

Incidentally, if you search for Huddersfield Hospital, you don’t find the NHS hospital, but a private one. All major hospitals should have a name like Ipswich, Reading or Crawley Hospital. It should also be galleria for sports venues to constantly change their names.

Huddersfield might wonder, why it doesn’t get the visitors, it thinks it should. It’s because it isn’t visitor friendly.

If I was a businessman wanting to set up a depot, warehouse or whatever in a large town in the North of England, Huddersfield would put me off because of its non-existent and chaotic transport system, built around everybody having a car with a sat-nav.

 

 

March 10, 2017 Posted by | Food, Transport/Travel | , , , , , , , , | Leave a comment

Hazel Grove Station

Hazel Grove station is an important station on the Buxton Line.

Just to the South of the station, there is a large housing development, which probably helps to explain the what looks to be new expansion to the car parking at the station.

This Google Map shows the area around Hazel Grove station.

There are two main railways on the map.

  • The Buxton Line runs North-West to South-East, connecting Stockport and Manchester in the North-West to Buxton in the South-East.
  • The Buxton Line goes through Hazel Grove station, where some trains stop and under Chester Road.
  • The rail line running East-West connects the Hope Valley Line in the East to a freight-only going West.

There is also a single-track bi-directional chord that connects the Hope Valley Line with Stockport.

The East Midlands Trains service between Norwich and Liverpool uses this chord, but doesn’t stop in Hazel Grove station.

Current Services At Hazel Grove Station

Under Services in the Wikipedia entry for Hazel Grove station, this is said.

Today Hazel Grove is served by two trains per hour to/from Manchester Piccadilly – the hourly Manchester Piccadilly to Buxton and the hourly Preston to Hazel Grove DMU services. Only a few of the local DMU services between Manchester and Sheffield go via Hazel Grove – most travel via New Mills Central. Few services from Buxton now continue past Manchester Piccadilly and those that do (currently seven services in total) operate in the early morning and evening business peak periods.

So Hazel Grove has a just two diesel multiple units per hour to Manchester Piccadilly..

The Class 319 Flex Train

If the building, testing and delivery of the Class 319 Flex train goes according to the Porterbrook/Northern plan, then the following will happen before the December 2017 Timetable Change..

  • Four Class 319 Flex trains will be in service.
  • Four more Class 319 trains will be in progress of being converted to Class 319 Flex trains.
  • Class 319 Flex trains will be running between Manchester Piccadilly and Buxton.
  • Class 319 Flex trains must be running to Blackpool and Windermere, if the sub-leased Class 185 trains have to go back to TransPennine.

Without any extra electrification, the Class 319 Flex trains will be able to run from Hazel Grove to  to Barrow-in-Furness, Blackpool North, Buxton, Manchester Piccadill, Preston, Wigan North Western and Windermere

New Track/Electrification Before December 2017 Timetable Change

These changes and upgrades, should happen before the December 2017 Timetable Change.

  • Manchester to Preston via Bolton should be electrified.
  • The Blackpool Branch Lines to Blackpool North should be electrified.
  • Manchester Victoria to Stalybridge could be electrified.
  • According to Network Rail, the Ordsall Chord should be in operation.

They could make a lot of difference to services from Hazel Grove station.

  • Class 319 electric trains could run to Blackpool North, Bolton, Liverpool, Manchester Piccadilly, Manchester Victoria, Preston and Wigan North Western.
  • Class 319 Flex bi-mode trains could run to Barrow-in-Furness, Blackburn, Blackpool South, Buxton, Clitheroe, Stalybridge and Windermere

Northern Rail have an awful lot of sensible possibilities for electric or bi-mode services.

 

March 9, 2017 Posted by | Transport/Travel | , , | 1 Comment