The UK’s New High Speed Line Being Built By Stealth

Wikipedia has a section called High Speed Rail. This is the first paragraph.

High-speed rail is a type of rail transport that operates significantly faster than traditional rail traffic, using an integrated system of specialised rolling stock and dedicated tracks. While there is no single standard that applies worldwide, new lines in excess of 250 kilometres per hour (160 miles per hour) and existing lines in excess of 200 kilometres per hour (120 miles per hour) are widely considered to be high-speed.

In the UK we have both types of high speed line mentioned in this definition.

High Speed One and High Speed Two have or will have operating speeds of 300 kph and 400 kph respectively and by any definition are true high speed lines.

There is also the East Coast Main Line and Great Western Main Line and West Coast Main Line, which are lines with long stretches, where continuous running at 200 kph is possible.

These lines certainly meet the 200 kph definition now and will likely exceed it, as digital in-cab signalling is deployed in the future and allows running at up to 225 kph in certain places.

Electrification Between Sheffield And Clay Cross On The Midland Main Line

This article on Rail Technology Magazine is entitled Grayling Asks HS2 To Prepare For Electrification Of 25km Midland Main Line Route.

If this electrification happens on the Midland Main Line between Sheffield and Clay Cross, it will be another project in turning the line into a high speed route with a 200 kph operating speed, between London and Sheffield.

Currently, the electrified section of the line South of Bedford is being upgraded and the electrification and quadruple tracks are being extended to Glendon Junction, where the branch to Corby leaves the main line.

The proposed electrification will probably involve the following.

  • Upgrading the line to a higher speed of perhaps 225 kph, with provision to increase the speed of the line further.
  • Rebuilding of Chesterfield station in readiness for High Speed Two.
  • Full electrification between Sheffield and Clay Cross.

Clay Cross is significant, as it is where the Midland Main Line splits into two Southbound routes.

Note.

  1. Some of the tunnel portals in the Derwent Valley are Listed.
  2. Trying to electrify the line through the World Heritage Site will be a legal and engineering nightmare.
  3. Network Rail has spent or is spending £250million on upgrading the Erewash Valley Line.
  4. High Speed Two will reach The East Midlands Hub station in 2032.

When High Speed Two, is extended North from the East Midlands Hub station, it will take a route roughly following the M1. A spur will link High Speed Two to the Erewash Valley line in the Clay Cross area, to enable services to Chesterfield and Sheffield.

But until High Speed Two is built North of the East Midlands Hub station, the Erewash Valley Line looks from my helicopter to be capable of supporting 200 kph services.

  • It is mainly double track, with sections where extra lines have been added.
  • It is reasonably straight.
  • There seem to be generous margins on either side.
  • There is only one tunnel at Alfreton, which is 770 metres long.
  • There is only three stations at Ilkeston, Langley Mill and Alfreton.

As many of the bridges seem new, has the Erewash Valley Line been prepared for electrification?

Electrification Around East Midlands Hub Station

I wouldn’t be surprised to see that by the opening of the East Midlands Hub station in 2032, that the following will have happened.

  • The route between East Midlands Hub station and Sheffield via the Erewash Valley Line and Chesterfield has been fully electrified.
  • A higher proportion of services between London and Sheffield will use the Erewash Valley Line, with times under two hours.
  • From 2022, the trains running on the Midland Main Line will be 200 kph bi-mode trains.

As the East Midlands Hub Station and High Speed Two is developed, various electrified routes will open through the area, thus grdually reducing journey times between London and Sheffield.

Once the station is fully open, I suspect there will be services between London and Sheffield via High Speed Two and the Erewash Valley Line.

But when the High Speed 2 spur towards Sheffield is opened, the trains will take the high speed route.

Electrification From London To Kettering, Glendon Junction And Corby

Currently, the electrified section of the line South of Bedford is being upgraded and the electrification and quadruple tracks are being extended to Glendon Junction, where the branch to Corby leaves the main line.

When completed, this electrification will enable the following.

  • Two electric trains per hour (tph) between London and Corby.
  • Much of the route between London and Glendon Junction will be improved to allow 200 kph running.
  • Much of the route between London and Glendon Junction will be quadruple tracks.

It will be a quality high speed line to a similar standard to that of much of the East Coast Main Line.

The True 200 kph (125 mph) Bi-Mode Train

In the Wikipedia entry for Leicester station, this is said about electrification of the Midland Main Line.

From 2022, services will be operated using bi-mode electro-diesel trains running in electro-pantograph mode between London St Pancras and Kettering North Junction, switching to electro-accumulator/diesel-electric mode northwards from there.

Bombardier have been quoted as developing a 200 kph bi-mode Aventra with batteries.

  • 200 kph on 25 KVAC overhead electrification.
  • 200 kph on diesel.
  • Batteries for Last Mile operation.
  • Better ambience than current bi-modes.
  • Low and level floors.

If Bombardier can produce such a train, surely other train manufacturers can?

Electrification Between Glendon Junction And Market Harborough

I talked about this in MML Wires Could Reach Market Harborough, where I said this.

It appears that Network Rail have a problem.

  • Electrification of the Midland Main Line (MML) is to run as far as Kettering and Corby stations.
  • The power feed is to be located at Braybrooke, which is just South of Market Harborough station.

So Network Rail are now looking for a twelve mile long extension lead.

A Network Rail spokesman, says they are looking at various options, including an underground cable or extending the Overhead Line Equipment.

Since I wrote that post a few weeks ago, I have looked at that section of line and have had various messages, which lead me to the belief, that all bridges and structures have been raised to allow electrification to be added to the line.

These points are in favour of electrification!

  • The only station is Market Harborough, where the track is s being realigned to increase linespeed.
  • Bridges, structures and track appear to have been upgraded for electrification.
  • There are only two tracks.
  • Network Rail need a power connection.

It will be a matter of heads and tails, as to whether Glendon Junction and Market Harborough station will be electrified.

The Electrification Gap Between Market Harborough And East Midlands Hub Stations

These are my thoughts on various sections going North from Market Harborough station.

Between Market Harborough And Leicester

This doesn’t appear to be too difficult to electrify, if that were to be decided, until approaching Leicester station, where there are several bridges over the track.

A driver also told me, that under one bridge the track can’t be lowered, due to the presence of a large sewer.

If the proposed bi-mode trains have a Last Mile battery capability, discontinuous electrification as proposed for South Wales could be used on these bridges.

But the track is fairly straight and the speed limits could be fairly high enabling the proposed bi-mode trains to be cruising near to 200 kph.

Whatever is done, I suspect that the track improvements and the electrification work South of Kettering will enable the new bi-mode trains to go between Leicester and London in comfortably under an hour.

Leicester Station

I think Leicester station is both a problem and a solution.

I don’t think it is possible to electrify the current station without a lot of disruption and major works because of the number of bridges South of the station.

But according to Wikipedia, plans exist to regerenate the station, which could be a big opportunity to create the most cost-effective solution to powering the trains.

Northwards From Leicester

This section looks an ideal one for the proposed 200 kph bi-mode train, with fairly straight tracks.

Operation Of The Bi-Mode Trains

Battery Use

I believe that Bombardier’s design for a 200 kph bi-mode train, doesn’t just use batteries for Last Mile operation.

Using discontinuous electrification on the bridges South of Leicester, which would be the sensible way to electrify that section, but would need the new trains to have a battery capability to jump the gaps.

I also believe that Aventras use batteries to handle regenerative braking, as do Hitachi on their Class 800 trains.

Bombardier Aventras seem to have lots of powered axles and Bombardier have stated that the bi-mode will have distributed power.

As an Electrical and Control Engineer, I believe that the most efficient battery strategy with distributed power, would be to distribute the batteries to each car.

  • Batteries would be close to the traction motors, which is electrically efficient.
  • Batteries would be smaller and easier to install on the train.
  • Battery power could be used to power the train’s systems, as Hitachi do!
  • Battery power could be used to move the train and assist in acceleration

Each car would have its own computer to use the most efficient strategy.

I would also put an appropriately sized diesel generator in each car.

In the mathematical modelling of systems consisting of several identical units working together, it is a common technique to look at an individual car.

Consider the following, where I estimate the weight of a car in a proposed bi-mode Aventra.

  • A motor car for a Class 345 train, which is another Aventra variant, weighs 36.47 tonnes.
  • I estimate that a typical car in the proposed bi-mode train will accommodate a total of about 70 seated and standing passengers.
  • With bags, buggies and other things passengers bring on, let’s assume an average passenger weight of 90 kg, this gives an extra 6.3 tonnes.
  • Suppose the battery and the diesel were to weigh a tonne each

So I will assume that a typical car weighs 44.77 tonnes.

When running at 200 kph, the car will have a kinetic energy of around 19.5 kWh.

The 30 kWh battery in a Nissan Leaf could handle that amount of energy.

The kinetic energy of a passenger train is surprisingly small.

I suspect that each car has a battery size of about 50 kWh, so that it can adequately power the train in all modes.

Acceleration

Acceleration of a train, is the part of the journey that uses most power.

These trains will need to have the same or better acceleration to the Class 222 trains, that currently work the route, as otherwise timings would be slower and a marketing disaster.

In Have Bombardier Got A Cunning Plan For Voyagers?, I did the calculation of the kinetic energy for a four-car Class 220 train, which is in the same Voyager family as the Class 222 train.

Voyagers are an interesting train, as they cruise at 200 kph and have a diesel engine in each car, which generates electricity to power the train.

Consider these facts for a four-car Class 220 train.

  • The train has a weight of 185.6 tonnes, so the average car weight is 46.4 tonnes
  • The train has seats for two hundred passengers or 50 per car.
  • If we assume that each passenger weighs 90 Kg. with their baggage this gives a total car weight of 50.9 tonnes.

This one car of a Class 222 train running at 200 kph has a kinetic energy of 22 kWh.

As both trains are assumed to be travelling at the same speed, the difference in kinetic energy is down to the weight of the car and the number of passengers.

I have assumed more passengers in the Aventra, as I suspect modern design will improve the figure.

Consider each of these trains doing a stop from 200 kph on the Midland Main Line.

The Aventra will convert the train’s kinetic energy into electricity in the batteries, so if I assume that the efficiency of the regenerative braking is eighty percent, this would mean that 19.5 * 0.8 or 15.6 kWh will be stored in the battery in each car. To accelerate back to 200 kph, the onboard diesel engines will have to supply 3.9 kWh for each car.

The Class 222 train will convert the train’s kinetic energy into heat. To accelerate back to 200 kph, the onboard diesel engines will have to supply 22 kWh for each car.

Bombadier have said that their design for a bi-mode Aventra will have distributed power. So if this includes the batteries and the diesel engines, I wouldn’t be surprised if each car has a battery and a diesel engine.

On the Class 222 train a 560 kW diesel is used in each car to provide the 22 kWh to accelerate the train.

So what size of diesel engine would be needed to supply the 3.9 kWh needed to accelerate the train?

Assuming the diesel is as efficient as that in the Class 222 train, the diesel engine would only be in the region of 100 kW.

Which seems very small!

But suppose something like the quiet Cummins ISBe engine, that is used in a New Routemaster bus is installed.

  • This engine has a capacity of 4.5 litres and a rating of 185 bhp/138 kW.
  • It is a quarter the size of the engine in the Class 222 train.
  • One of the major uses of a larger 5.9 litre version of this engine is in a Dodge Ram pickup.

The engine would only run when the power in the battery was below a certain level.

Cruising At 200 kph

Once at 200 kph, I suspect that most of the power required would come from the batteries.

These would be topped up as required by the diesel engine.

Charging The Batteries

Expecting a small diesel engine to charge the batteries sufficiently between London and Sheffield is probably a big ask, especially if the new franchise wanted to run a train that stopped everywhere North of Kettering.

South of Kettering the train would use the electrification and I suspect trains going North will say good-bye to the electrification with full batteries.

So this is why Chris Grayling’s statement of possible electrification between Sheffield and Clay Cross is important.

Southbound trains from Sheffield would leave Clay Cross junction with full batteries, whether they are going via Derby or the Erewash Valley Line.

Between London And Sheffield

Trains between London and Sheffield would only be relying on the diesel engines to top up the batteries between Glendon Junction and Clay Cross.

This is probably about eighty miles. Trains currently take an hour with stops at Leicester and Derby.

It’s a tough ask!

But it might be possible, if an efficient, aerodynamically slippery train is launched with full batteries at full speed at Clay Cross and Glendon Junctions into a route without electrification, which is as straight and level as possible with only gentle curves.

Between London And Nottingham

The distance on the related route between Glendon Junction and Nottingham is about sixty miles with a couple of stops.

This could be an even tougher ask! A charging system at Nottingham might make all the difference.

Bombardier

Obviously Bombardier have done extensive simulations and they wouldn’t be offering the train for the new East Midlands Franchise, if they knew it wasn’t a viable solution!

If they can develop a train that can jump an eighty mile electrification gap at 200 kph, they’ll have a train, that will be a serious export possibility.

The following would also help.

  • Any extra electrification.
  • Launching the train at a higher speed into the gap. 225 kph would be the equivalent of an extra 5kWh in the battery.
  • Batteries with a higher energy density will emerge.
  • More efficient regenerative braking.
  • Better aerodynamics.

I also believe that big improvements could come from a more sophisticated train control system.

Bombardier are developing a totally different philosophy of train design.

Conclusion

It looks like the reality of mathematics and dynamics will be able to satisfy the seemingly impossible dreams of Chris Grayling!

 

 

 

 

 

 

 

 

 

July 6, 2018 - Posted by | Travel | , , , , ,

1 Comment »

  1. […] In The UK’s New High Speed Line Being Built By Stealth, there is a sub-section with the same title as this sub-section. […]

    Pingback by Could A 125 Mph Electric Train With Batteries Handle The Midland Main Line? « The Anonymous Widower | November 1, 2018 | Reply


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.