I have cut this out of The Train Station At The Northern End Of The Netherlands, so don’t read if if you’ve read it before.

Searching Google for hydrogen around Groningen, I found this document on the Internet, which is entitled Green Hydrogen Economy In The Northern Netherlands.

It is a fascinating read about what you can do with hydrogen generated from wind and biomass.

This is a sentence from the document.

Large scale green hydrogen product.ion together with harbor transport and storage facilities will be located at Eemshaven, with green chemicals production in Delfzijl

It is an ambitious statement.

Eemshaven

It also appears that Eemshaven will be the main connection point for electricity from offshore wind farms. This is said.

In the Eemshaven an offshore electricity cable from Norway, the NorNed cable with a capacity of 700 MW, comes on land. The Cobra cable, with a capacity of 700 MW, from Denmark is foreseen to connect at the Eemshaven to the onshore grid. The Gemini wind farm is connected to the grid in the Eemshaven with a capacity of 600 MW. Within 10 years it is foreseen that another 4.000 MW offshore wind will have their electricity cable to the Eemshaven.

Does all this explain, the building of a station at Eemshaven? Delfzijl station was built in 1883 and has its own connection to Groningen.

The following proposed actions are from the document

Build A 1,000 MW Electrolysis Plant

This is an extract from the  of the document.

A 1.000 MW electrolysis plant that runs 8.000 hours a year, uses 8 billion kWh and 1,5 million m3 pure water to produce 160 million kg Hydrogen. A reverse osmosis plant has to produce the 1.5 million m3 pure water, using sea water or surface water as input. If an electricity price of 2‐2,5 €ct/kWh and a total investment between 500 million and 1 billion Euro with a 10 year life time is assumed, a green hydrogen cost price around 2‐3 €/kg will be the result. This is about competitive with present hydrogen prices, produced from natural gas by steam reforming.

How much energy is contained in a Kg of hydrogen?

This page on IdealHY says the following.

Hydrogen is an excellent energy carrier with respect to weight. 1 kg of hydrogen contains 33.33 kWh of usable energy, whereas petrol and diesel only hold about 12 kWh/kg.

At three euros for a kilogram of hydrogen, that works out at nine euro cents for a kWh.

Build A 1000 MW Biomass Gasification Plant

The title is a section in the document and this is an extract from the section.

Green hydrogen can be produced by electrolysis using green electricity, but can be produced also from biomass via gasification. Biomass gasifiers use solid biomass as an input and deliver a green syngas, a mixture of hydrogen, carbon‐monoxide (CO) and carbon‐dioxide (CO2), and char as an output. The CO could be used, together with water (H2O), to produce extra hydrogen. The resulting products from biomass gasification are green hydrogen and CO2. However, from CO2 and green hydrogen every chemical product could be produced. Therefore, the combination of green hydrogen and CO2 or green syngas creates the opportunity for a fully green chemical industry in the Northern Netherlands.

The process is still being developed. My first question, is can you use animal manure as a feedstock? It should be noted that The Netherlands used to have a very large and smelly manure problem.

Offshore Hydrogen Production From Far Offshore Wind Farms

The title is a section in the document and this is an extract from the section.

Offshore wind farms produce electricity which can be brought onshore via an electricity cable. Such an offshore electricity cable is expensive. The farther offshore the wind farm is located the more expensive the electricity cable cost. At the North Sea, an alternative solution for these wind farms is to convert the electricity into hydrogen at an existing oil/gas platform and to transport this hydrogen eventually mixed with gas via an existing gas pipeline. Onshore the hydrogen is separated from the natural gas and cleaned to be transported via pipeline, ship or truck to the markets.

I think that the technology and existing infrastructure could be made to work successfully.

  • Europe has over fifty years experience of handling offshore gas networks.
  • Recent developments have seen the emergence of floating wind turbines.
  • Would it be easier to refurbish redundant gas platforms and use them to collect electricity and create hydrogen, rather than demolish them?
  • Hydrogen is only produced when the wind blows.
  • There is no need to store electricity and we’ve been storing gas since the Victorians.

There will be problems, like the integrity of an ageing pipeline, but I suspect that the expertise to solve them exists.

Will there be a North Sea, where every part has a large wind farm?

Note that the Hornsea Wind Farm has an area of 1830 square miles and could generate around 6 GW, when fully developed.You could fit 120 wind farms of this size into the North Sea. Even if only a small proportion could be developed, a sizeable amount of hydrogen could be produced.

A Market For 300,000‐tonnes Green Methanol + 300,000‐tonnes Green Ammonia

The title is a section in the document and this is an extract from the section.

Hydrogen (H2) and Carbon‐dioxide (CO2) can be used in chemical processes to produce a wide variety of chemical products. Two of the main building blocks in chemistry are methanol and ammonia. Methanol can be produced from H2 and CO2. Ammonia is produced from H2 and nitrogen (N2), captured from the air.

Wind power and biomass have been used tp create the basic chemicals for the petro-chemical industry.

The Construction Of Green Hydrogen Fuel Cell Balanced Data Centres

The title is a section in the document and this is an extract from the section.

Google builds a very large data center in the Eemshaven, see picture below. The reasons for Google to choose for the Eemshaven are the existence of an offshore data cable, enough space and green electricity. Google as well as other companies that install and operate data centers wants to run on green electricity. Therefore, Google has signed a power purchase agreement with Eneco to buy green electricity for 10 years. For this reason, Eneco builds an onshore wind farm nearby. On a yearly average this wind farm produces enough electricity to meet the data center demand.
However, supply and demand are not at every time in balance. At moments that there is no wind, other power plants must take over the electricity supply. Now, these are fossil fired power plants.

In future, these power plants will be closed and supply and demand needs to be balanced in another way. And of course, that needs to be done with renewable electricity. This can be done by fuel cells fueled with green hydrogen. Fuel cells can follow demand and supply variations very fast with high efficiencies. Fuel cells are quiet and have no emissions, except very clean, demineralized, water.

I like this concept.

Surely, we could build a few data centres in places like Lincolnshire.

Build A Pipeline to Rotterdam And Germany

The Dutch have ambitious plans to export the hydrogen.

Other Ideas

The report is full of clever ideas and I suggest you take the time to read it fully!

Hydrogen Trains In The Northern Netherlands

The document says this about trains powered by hydrogen fuel cells.

In the Northern Netherlands, 50 diesel trains are daily operated on non‐electric lines. These trains, operated by ARRIVA have two or three carriages and a power of 450‐600KW supplied by Diesel‐Electric engines. Fuel cell‐electric hydrogen trains could replace these diesel trains. Alstom is a company that builds these fuel cell hydrogen trains and will perform a test next year on the line Groningen‐Bremen. Because the depreciation time for trains is 25 years, not all trains will be bought new. Some trains may need to be retrofitted with fuel cell‐electric power supply, which is technically feasible. When all these 50 diesel trains are replaced an investment in new and retrofitted trains of about …? Million Euros is needed. The total hydrogen consumption of these trains is about 5,000 ton.

These points are shown in a table.

  • Total (diesel) trains in the Northern Netherlands is 50 units
  • Hydrogen consumption approximately 25 kg H2/100km
  • Train operations average 6 days per week. Train is operated approximately 1.200 km per day, based on two times per hour per trajectory of 50km.
  • Train operations average 6 days per week. 330 days per year.
  • Capital expenditure per train approximately …. ? 50 Units  …? Million Euro
  • 50,000 tonnes of hydrogen will be needed.
  • The fuel bill at three euros a Kg will be 150 million euro.

Would this be economic?

From various comments, I suspect that Stadler are working on a hydrogen-powered GTW.

But failing that, as Stadler are developing a diesel/electric/battery Flirt for the South Wales Metro and some of the routes from Groningen are only about 30 km, I wouldn’t be surprised to see diesel/electric/battery GTWs running across the flat lands of the North.

Battery trains could be fitted with pantographs and recharge in Groningen, where most of the platforms are electrified.

There are a lot of possibilities and engineers will come up with the best solution with regards to operation and economics.

Conclusion

Thr Dutch have big plans for a hydrogen-based economy in the North of the Netherlands.

Where is the UK Government’s master plan for hydrogen?

April 4, 2019 - Posted by | Transport, World | , , , , ,

3 Comments »

  1. […] This now a separate post at The Dutch Plan For Hydrogen. […]

    Pingback by The Train Station At The Northern End Of The Netherlands « The Anonymous Widower | April 4, 2019 | Reply

  2. […] is Dutch and after my trip to the Netherlands last week, I wrote The Dutch Plan For Hydrogen, which describes how the Dutch are developing a green hydrogen economy, where the hydrogen is […]

    Pingback by Hydrogen Trains To Be Trialled On The Midland Main Line « The Anonymous Widower | April 11, 2019 | Reply

  3. I did some searching and found https://www.spoorpro.nl/materieel/2018/10/18/arriva-batterijtreinen-in-friesland-over-drie-jaar-al-mogelijk/

    For Nederlands-challenged readers, it seems that Friesland province (between Groningen and the Waddenzee), Arriva (the concession holder), and Stadler are seriously considering converting diesel trains to battery power recharged from overhead lines at stations:

    * complete OLE electrification not an option: far too extensive and expensive – would cost 100s of 1000000s of €
    * province wants completely emissions-free public transport by 2025
    * province commissioned Ricardo and Arcadis to research alternatives such as hydrogen and methanol, but decided that, although hydrogen was a possibility it was still in its infancy, and battery + OLE at Harlingen, Leeuwarden, Stavoren and Sneek stations was the best option
    * province will make a decision by the end of the year, and the first trains could be in operation in 3 years time; cost €180 million, of which province would supply €66m

    Interesting stuff. As Arriva-director Anne Hettinga is quoted as saying: ‘technical development is advancing quickly’.

    Comment by Peter Robins | April 23, 2019 | Reply


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.