The Anonymous Widower

Trump and Biden – First Encounter

I once saw John Major operate in a ninety minute speech to the Cambridge Chief Executives Club, who were a radical bunch and probably not very attuned to the Tory Party.

He gave a masterful performance, that was both serious and entertaining, as would many top flight politicians, from all round the world.

Neither Trump nor Biden hardly made a serious point and they certainly weren’t entertaining. It was almost like a boxing match, where the referee won!

September 30, 2020 Posted by | World | , , , , | Leave a comment

Walking Along Moorgate – 30th September 2020

I took these pictures as I walked from North to South along Moorgate today from the bus stop by Finsbury Square.

 

Note.

  1. I did cross the road three times.
  2. The building site behind the blue hoardings in some of the first pictures, looks like it could be another tall building.
  3. The tower looming in the background of several of the pictures is Citypoint, which was originally built in 1967 and refurbished in 2000.
  4. The new looking building, with the Barclays branch at street level, is not new but another refurbished building, that has been finished in the last few months.
  5. The older red and white building is Moorgate station. There is nothing to indicate that this building will be rebuilt.
  6. The odd shaped building to the South of the station is Moor House.
  7. A large new entrance to the station, with an office block on top is being built between the original station entrance and Moor House.
  8. Between the new station entrance and Moorgate, 101 Moorgate is being built.

There is certainly, a lot of all types of property development going on at Moorgate station, which after Crossrail opens will become the Western entrance to the Crossrail station at Liverpool Street station.

This 3D Google Map shows Moorgate.

101 Moorgate is marked with a red arrow.

A Crossrail Video Of Liverpool Street Station

This video shows the design of Crossrail’s Liverpool Street station.

This screen-capture from the video shows a possible future Moorgate.

Note the new buildings at 101 Moorgate and the current Moorgate station.

These are related posts on the design of the Crossrail station at Moorgate and Liverpool Street.

The station could become the major one for the City of London.

Extending the Northern City Line To The South

This was intended by the builders of the Northern City Line and they intended to take the route to just North of Bank station at Lothbury.

In the Wikipedia entry for Moor House, this is said.

Completed in 2004, it was the first building to be designed for the forthcoming Crossrail, with a ventilation shaft to the station underneath the building. When built, it had the deepest foundations in London, which reach down 57 metres (187 ft) and are specifically designed to withstand further tunneling below it in the future.

I suspect that could mean that Moor House won’t get in the way of any further railway development.

In the Wikipedia entry for the Northern City Line, this is said about possible developments planned after World War 2.

After the war there were proposals to extend the Northern City Line north and south. The London Plan Working Party Report of 1949 proposed several new lines and suburban electrification schemes for London, lettered from A to M. The lower-priority routes J and K would have seen the Northern City Line extended to Woolwich (Route J) and Crystal Palace (Route K), retaining the “Northern Heights” extensions to Edgware and Alexandra Palace. The lines would have run in small-diameter tube tunnels south from Moorgate to Bank and London Bridge. The “K” branch would have run under Peckham to Peckham Rye, joining the old Crystal Palace (High Level) branch (which was still open in 1949) near Lordship Lane. Nothing came of these proposals, and the Edgware, Alexandra Palace and Crystal Palace (High Level) branches were all closed to passengers in 1954. As a result, the Northern City Line remained isolated from the rest of the network.

Note.

  • The proposed J branch to Woolwich has been covered by Crossrail calling at both Moorgate and Woolwich.
  • The proposed K branch to Peckham Rye and Crystal Palace has been covered by Crossrail and the London Overground with a change at Whitechapel.

So why bother to open up the possibility by designing Moor House for more tunnels to be bored?

As the London Plan Working Party Report of 1949 indicated several more lines and electrification were proposed.

Also during the war several deep-level shelters were built under Underground stations. Wikipedia says this about the background to the shelters.

Each shelter consists of a pair of parallel tunnels 16 feet 6 inches (5.03 m) in diameter and 1,200 feet (370 m) long. Each tunnel is subdivided into two decks, and each shelter was designed to hold up to 8,000 people. It was planned that after the war the shelters would be used as part of new express tube lines paralleling parts of the existing Northern and Central lines. Existing tube lines typically had 11-foot-8.25-inch (3.56 m) diameter running tunnels and about 21 feet (6.4 m) at stations; thus the shelter tunnels would not have been suitable as platform tunnels and were constructed at stations the new lines would have bypassed. However, they would have been suitable as running tunnels for main-line size trains. (One existing tube, the Northern City Line opened in 1904, used a similar size of tunnel for this reason, although in fact main-line trains did not use it until 1976.)

Shelters were planned on the Northern Line at Belsize ParkCamden TownGoodge StreetStockwellClapham NorthClapham Common, and Clapham South on the Northern Line. Did London Transport do a full survey of the Northern Line before the war and leave documents saying where an express Northern Line could be easily built.

My mother told me about these plans and as her best friend worked in Personnel at London Transport, she probably knew more than the average suburban housewife, who worked part-time for my father as a book-keeper.

After Crossrail opens and Moorgate station and the Bank station Upgrade are completed will it be possible to bore two new full-size tunnels underneath the Northern Line and Moor House and other buildings on the route to create a Northern Line Express service?

Consider.

  • The tunnels would be very deep and suitable for full-size trains.
  • Moorgate, Bank and London Bridge stations will have all been rebuilt in the last twenty years, so hopefully, they have been built to allow tunnels for a Northern Line Express service to pass through.
  • The Northern Line Express would take the pressure off the City Branch of the Northern Line?
  • Initially, the line might terminate under London Bridge station in perhaps a two platform station.
  • Modern digital signalling would allow up to 24 trains per hour (tph) on the section between London Bridge and Alexandra Palace station and 12 tph on the Welwyn Garden City and Stevenage branches

It would be a lot easier to build than Crossrail 2 and would give some of the benefits.

An Extension To North Cheam?

The Wikipedia entry for Morden station has this paragraph.

A post-war review of rail transport in the London area produced a report in 1946 that proposed many new lines and identified the Morden branch as being the most overcrowded section of the London Underground, needing additional capacity. To relieve the congestion and to provide a new service south of Morden, the report recommended construction of a second pair of tunnels beneath the northern line’s tunnels from Tooting Broadway to Kennington and an extension from Morden to North Cheam. Trains using the existing tunnels would start and end at Tooting Broadway with the service in the new tunnels joining the existing tunnels to Morden. The extension to North Cheam would run in tunnel. Designated as routes 10 and 11, these proposals were not developed by the London Passenger Transport Board or its successor organisations.

Perhaps, the solution would be to bore two new deep full-size tunnels from Moorgate to Tooting Broadway.

  • The Northern Line Express trains couldn’t continue to Morden, as they would be too big for the existing tunnels.
  • So they would have to turn back at Tooting Broadway station.
  • The stations between Kennington and Morden, that are in need of improvement could be updated.
  • I would design the interchange between Northern Line Express and Northern Line trains at Tooting Broadway station as a step-free cross-platform interchange.

The Wikipedia entry for North Cheam station, describes the extension to the station.

  • It would have been in tunnel from Morden.
  • There would be an intermediate station at Morden South station.
  • It didn’t think much of the economics.
  • I would suspect that the tunnel would run under the A 24.
  • The tunnel would be just under three miles long.

I wonder, if the extra distance, made operation of the line easier.

I estimate that a train could go from Morden to North Cheam stations and back in under ten minutes.

  • This would allow 6 tph with a single tunnel and track between the two stations.
  • The two new stations; North Cheam and Morden South could be single platform.
  • The signalling could be simplified.

The extension could be more affordable.

 

 

September 30, 2020 Posted by | Transport | , , , , , , , | 4 Comments