The Anonymous Widower

A Trip To Grantham Station – 4th November 2020

I hadn’t intended to go to Grantham station, but that’s what I did on the last day before lockdown.

Over the last couple of weeks, I’ve been talking to a guy in Lincolnshire, who read Energy In North-East Lincolnshire, on this blog.

Last week, we both realised that we’d worked together in the 1970s, when he worked at a bank in the City, and I did some data analysis for the section, where he worked.

He is unwell with cancer at the moment and suggested I come down and see him in Skegness, where he now lives with his wife.

So I arrived at Grantham and found that the connecting train was running nearly an hour late and even then it was terminating at Boston.

After a quick exchange of texts, I told him the bad news and he gave me the good news, that his condition had improved and would be able to see me after Christmas and/or lockdown.

Luckily, I was able to change my ticket and took the next train back to London, after taking these pictures of the station.

I just had time to have a last drink of Aspall cyder before lockdown, in the station bar.

These are some thoughts.

Platform Layout At Grantham

The Wikipedia entry for Grantham station says this about the platforms.

It is composed of four platforms; platforms 1 and 2 are on the East Coast Main Line and are responsible for express services between London and Scotland. Platform 1 serves exclusively London King’s Cross via Peterborough and Stevenage; Platform 2 serves cities of northern England and Edinburgh. Platform 2, 3 and 4 are formed from a large island platform structure. Platform 3 is a bay platform at the northern end of the station that is used to allow local trains to reverse, while Platform 4 is a two-way platform that is used by East Midlands Railway. Only Platform 1 has amenities, including toilets, refreshments and a buffet.

This Google Map shows the station.

Note.

  1. Platforms are numbered 1 to 4 from East to West.
  2. Platforms 1 and 2 are long enough to take two five-car Class 800 trains working as a pair.
  3. Platform 4 may be long enough for these pairs of trains or could be made so.
  4. All trains to and from Nottingham call in Platform 4.
  5. Trains from Nottingham to Peterborough call in Platform 4 before crossing over to the down lines.
  6. There would appear to be no easy way for a Southbound train on the East Coast Main Line to access Platform 4.
  7. Platform 3 didn’t get much use on the day I visited.

There is also an avoiding line to allow freight and other passing trains to avoid going through the platforms.

Services Through Grantham Station

Services stopping at Grantham are as follows.

  • LNER – One tp2h – London Kings Cross and Harrogate via Stevenage, Grantham, Doncaster, Wakefield Westgate, Leeds
  • LNER – One tp2h – London Kings Cross and Bradford Forster Square via Stevenage, Grantham, Doncaster, Wakefield Westgate, Leeds
  • LNER – One tp2h – London Kings Cross and Lincoln via Stevenage, Peterborough, Grantham and Newark North Gate
  • LNER – One tp2h – London Kings Cross and York via Stevenage, Peterborough, Grantham, Newark North Gate, Retford and Doncaster.
  • Hull Trains – Five tpd – London Kings Cross and Hull via Stevenage, Grantham, Retford, Doncaster, Selby, Howden and Brough
  • Hull Trains – Two tpd – London Kings Cross and Beverley via Stevenage, Grantham, Retford, Doncaster, Selby, Howden, Brough, Hull and Cottingham.
  • East Midlands Railway – One tph – Liverpool Lime Street and Horwich via Peterborough and Nottingham
  • East Midlands Railway – One tph – Nottingham and Skegness

Note.

  1. tph is trains per hour
  2. tp2h is trains per two hours.
  3. tpd is trains per day.

Adding the services together, there is a frequent service between Stevenage, Peterborough, Grantham and Newark North Gate.

Train Timings Between London Kings Cross and Grantham

The fastest trains take 67 minutes between London Kings Cross and Grantham.

  • The distance is 105.5 miles
  • This would be an average speed of 94.5 mph.
  • The East Coast Main Line is being upgraded with in-cab digital ERTMS signalling, which will allow 140 mph running.
  • The works at Kings Cross station will have increased the station’s capacity.

I wouldn’t be surprised to see a time between London Kings Cross and Grantham, of under an hour, time-tabled in the near future.

Could There Be A London Kings Cross and Nottingham Service Via Grantham?

On this page on UK Rail Forums, this was posted in 2010.

According to today’s East Midlands news on BBC1, Network Rail is considering inviting tenders to run a faster service from Nottingham to London King’s Cross via Grantham, from 2014. The present service of around 1hr 45m is considered too slow by passengers.

How would this new service be reconciled with the much-publicised capacity constraints at Welwyn and at King’s Cross itself? Will the proposed possible service be diesel-powered under the wires from Grantham, or will the Grantham-Nottingham stretch be electrified? Interesting times.

Technology has changed since 2010 and the East Coast Main Line has improved.

  • King;s Cross station is being sorted.
  • Digital ERMTS signalling is coming to the East Coast Main Line
  • Hatachi’s new Class 800 trains have arrived and could go between Grantham and Nottingham on diesel power.
  • Grantham and Nottingham takes 35 minutes on a service with three stops, that’s timed for a Class 153 train.
  • Grantham and Nottingham is just over twenty miles.

As I said earlier, that I believe Grantham and London could be inside an hour, I wouldn’t be surprised to see a Nottingham and London Kings Cross service in under an-hour-and-a-half.

But it could be better than that?

Hitachi’s Regional Battery Train

This is the train that could unlock the potential of a London Kings Cross and Nottingham service.

This Hitachi infographic gives details of the train.

Note that the train has a range of 90 kilometres or 56 miles, at speeds of up to 100 mph.

The trains would be ideal for a London Kings Cross and Nottingham service.

  • They would charge the batteries, whilst using the electrification on the East Coast Main Line.
  • The battery range is such, that it would not need any charging between leaving Grantham and returning there from Nottingham.
  • They could travel at speeds of up to 140 mph on the East Coast Main Line, once the digital ERTMS  signalling is installed.
  • Stops could be at Stevenage, Peterborough and Grantham.

LNER’s five-car Class 800 trains, which are branded Azumas can be turned into Regional Battery Trains, by replacing the three diesel engines with battery packs.

I would suspect that times of around eighty minutes, between London Kings Cross and Nottingham, could be in order.

A Park-And-Ride For Nottingham And London

Nottingham has several Park-and-Ride sites, that are served by the trams. of the Nottingham Express Transit, which already calls at Nottingham station.

Would another site on the rail line between Grantham and Nottingham be useful?

This map shows. where the rail line crosses the A46, near its junction with the A52.

Note the Grantham and Nottingham line running across the top of the map and the big junction between the A52 and the A46.

It looks to be a good place for a Park-and-Ride station, if it was decided one needed to be built.

There might also be sites further in towards Nottingham, close to the racecourse or the Holme Pierpoint National Watersports Centre.

A Combined Nottinghamshire And Lincolnshire Service

I originally called this section a Combined Nottingham And Lincoln Service, but I don’t see why it can’t serve most of both counties.

Consider.

  • Birmingham, Brighton, Cambridge, Oxford and Southend get two services from the capital by different routes.
  • Hitachi’s Class 800 trains can Split/Join in around two minutes.
  • Running five-car Class 800 trains all the way between London Kings Cross and Lincoln is not a good use of a valuable train path on the East Coast Main Line.
  • Lincoln is just 16.5 miles and 24 minutes from the East Coast Main Line.
  • Nottingham is 22 miles and could be 20 minutes from the East Coast Main Line.
  • Both Lincoln and Nottingham would be in battery range for a return trip from the East Coast Main Line.
  • Platforms 1, 2 and 4, at Grantham are long enough to handle two Class 800 trains, running as a pair and regularly pairs call in Platforms 1 and 2.

I believe it would be possible for a pair of Regional Battery Trains to do the following.

  • Leave London Kings Cross and run to Grantham in an hour, stopping at Stevenage and Peterborough.
  • Stop in Platform 4 at Grantham station, where the trains would split.
  • One train would continue on the East Coast Main Line to Newark North Gate station, where it would leave the East Coast Main Line and go to Lincoln.
  • The other train would continue to Nottingham.

Note.

  1. Coming back, the process would be reversed with trains joining in Platform 1 or Platform 4 at Grantham.
  2. There may need to be some track and signalling modifications, but nothing too serious or challenging.

Connections to other parts of Nottinghamshire and Lincolnshire would be as follows.

  • Nottingham and Nottinghamshire would be connected using the Nottingham Express Transit and the Robin Hood and Maid Marian Lines from Nottingham station.
  • All stations between Grantham and Nottingham would be reached from either Grantham or Nottingham.
  • All stations to Boston and Skegness would be reached from Grantham.
  • All stations between Newark and Lincoln would be reached from either Lincoln or Newark.
  • All stations between Doncaster and Lincoln would be reached from either Doncaster or Lincoln.
  • All stations between Peterborough and Lincoln would be reached from either Lincoln or Peterborough.
  • All stations to Market Rasen, Grimsby Town and Cleethorpes would be reached from Lincoln.

Note.

  1. I feel that some Lincoln services could be extended to Cleethorpes via Market Rasen and Grimsby Town.
  2. Hopefully, a timetable could be developed, so that no connection was overly long.

Most of the distances are not unduly long and I would hope that most secondary services could be battery electric trains, which would be charged in the larger stations like Boston, Cleethorpes, Doncaster, Grantham, Lincoln, Mansfield, Nottingham, Peterborough, Sleaford, Spalding and Worksop.

Doncaster, Grantham and Peterborough already have 25 KVAC overhead electrification and this could be used to charge the trains, with possibly some small extensions.

The other stations will need a number of systems to charge the trains, as they pass through.

Some stations will be suitable for the installation of the standard 25 KVAC overhead electrification, but others will need specialised charging systems.

It appears that Adrian Shooter of Vivarail has just announced a One-Size-Fits-All Fast Charge system, that has been given interim approval by Network Rail.

I discuss this charger in Vivarail’s Plans For Zero-Emission Trains, which is based on a video on the Modern Railways web site.

There is more about Vivarail’s plans in the November 2020 Print Edition of the magazine, where this is said on page 69.

‘Network Rail has granted interim approval for the fast charge system and wants it to be the UK’s standard battery charging system’ says Mr. Shooter. ‘We believe it could have worldwide implications.’

Vivarail’s Fast Charge system must surely be a front-runner for installation.

What frequency of the Combined Nottinghamshire And Lincolnshire service would be needed and could be run?

Consider.

  • Currently, Lincoln is served with one tp2h with a five-car Class 800 train running the service.
  • The Lincoln service alternates with a one tp2h service to York, which also calls at Retford and Doncaster.
  • Work is progressing on increasing the number of high speed paths on the East Coast Main Line.

Obviously, an hourly service to both Nottingham and Lincoln would be ideal and would give most of the two counties an hourly service to and from London Kings Cross with a single change at either Doncaster, Grantham. Lincoln, Newark, Nottingham or Peterborough.

  • An hourly service might be difficult to timetable because of the York service.
  • But I don’t believe it would be impossible to setup.

Especially if after, the Eastern leg of High Speed Two opens, East Coast Main Line services from London Kings Cross to North of York are replaced in part, by High Speed Two services.

The Effect Of High Speed Two

High Speed Two will build a new station at Toton called East Midlands Hub station.

  • The station will be situated about halfway between Nottingham and Derby, with frequent connections to both cities.
  • There will be frequent services to Birmingham, Leeds, London, Newcastle and Sheffield.
  • I wouldn’t be surprised to see a direct service to Edinburgh and Glasgow from the station.
  • There will be a lot of economic growth around the station.

I very much feel, that a lot of passengers were travel to East Midlands Hub station for both long distance trains and to access the Derby-Nottingham area.

A Cambridge And Birmingham Service

In How Many Trains Are Needed To Run A Full Service On High Speed Two?, I proposed a Cambridge and Birmingham Curzon Street service.

This is what I said.

The obvious one is surely Cambridge and Birmingham

  • It would run via Peterborough, Grantham, Nottingham and East Midlands Hub.
  • It would connect the three big science, engineering and medical centres in the Midlands and the East.
  • It would use High Speed Two between Birmingham Curzon Street and East Midlands Hub.
  • It could be run by High Speed Two Classic-Compatible trains.

It might even be a replacement for CrossCountry’s Stansted Airport and Birmingham service.

Timings for the various legs could be.

  • Cambridge and Peterborough – CrossCountry – 49 minutes
  • Peterborough and Grantham – LNER – 19 minutes
  • Grantham and Nottingham -Best Estimate – 20 minutes
  • Nottingham and Birmingham Curzon Street – Midlands Rail Engine – 33 minutes

Note.

  1. This totals to two hours and one minute.
  2. The current service takes two hours and forty-four minutes.
  3. The Ely and Peterborough and Grantham and Nottingham legs are not electrified.

If the route were to be fully electrified or the trains were to be fitted with batteries, the time via High Speed Two, would surely be several minutes under two hours.

Conclusion

These objectives are possible.

  • An hourly service between London Kings Cross and Grantham, Lincoln, Newark and Nottingham.
  • A very much more comprehensive train service for Nottingham and Lincolnshire.
  • A two hour service between Cambridge and Birmingham.

Most of the services would be zero carbon.

No major infrastructure would be needed, except possibly completing the electrification between Nottingham and Ely, some of which is probably needed for freight trains anyway.

Alternatively, the High Speed Two Classic-Compatible trains could be fitted with batteries.

 

November 9, 2020 - Posted by | Health, Transport/Travel | , , , , , , , , , , , , , , , ,

6 Comments »

  1. Regarding the Cambridge Birmingham service I’ve long hoped that a more direct service via East West rail and WCML might at some stage be proposed.

    Comment by Fenline Scouser | November 10, 2020 | Reply

  2. Having lived near Cambridge for nearly twenty years, East West Rail will help, but the difficult journeys from the area are to the North of England, Nottingham, Birmingham and Scotland. Timetables often say go via London. A good link to the High Speed Two hub at East Midlands Hub station will certainly be very useful.

    I also think, that there needs to be a direct service from East Midlands Hub up the West Coast Main Line. There’s plenty of capacity between East Midlands and Crewe.

    Perhaps, some terminal platforms could even be added at Manchester Airport. As NPR have said there will be six tph between Liverpool and Manchester Piccadilly via the Airport, Manchester Airport might make a good interchange for Liverpool, as an alternative to a direct service.

    Comment by AnonW | November 10, 2020 | Reply

    • Agreed! Tell me about it.

      I’ve been doing Liverpool-Norfolk trips for over 40 years and in all sorts of variations. Back in the 1970s the accepted route was change at Nuneaton for Birmingham to Norwich service with the highlight of a walking pace crawl around the Ely avoiding line. End to end timings were around 7hr 30min (if the class 25 didn’t expire or a carriage with hot axle box needed to be shunted out at March) That was getting your money’s worth!

      My thoughts re an East West WCML proposal are, I think, complementary to your own. Consider the running time would probably be in much the same ball park (allowance for reversal at Bletchley of course) but also connectivity between WCML stations at New St, Birmingham Int, Coventry, Rugby, Northampton, Milton Keynes and EWR stations at Sandy, Bedford and Cambridge would be greatly improved.

      Many of these stations then offer up one change opportunities for local or regional destinations without the need to go in and out of London.

      Of course there is also opportunity to extend such a service beyond New Street and/or Cambridge. Wolverhampton, Walsall or even Shrewsbury obvious candidates at one end Ipswich or Colchester at the other.

      Comment by Fenline Scouser | November 10, 2020 | Reply

  3. I used to regularly drive in the mid-1960s between Liverpool and Felixstowe, when there was no Midland Links Motorway or M62.

    I would often go via Sheffield and over the |Snake Pass to Manchester and down the East Lancs Road. One day, I got involved in an accident, luckily only as a witness, and the journey took over twelve hours.

    I never did the journey by train in those days. It seems I didn’t miss much!

    Comment by AnonW | November 10, 2020 | Reply

  4. […] I proposed a Birmingham and Cambridge service using High Speed Two Classic-Compatible trains in A Trip To Grantham Station – 4th November 2020. […]

    Pingback by High Speed Two And Scotland « The Anonymous Widower | November 13, 2020 | Reply

  5. […] A Trip To Grantham Station – 4th November 2020, I advocated splitting at Grantham station to serve both Nottingham and […]

    Pingback by LNER Seeks 10 More Bi-Modes « The Anonymous Widower | November 25, 2020 | Reply


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.

%d bloggers like this: