The Anonymous Widower

A Trip To Skegness

Last Thursday, I took a trip to Skegness to get out of the heat.

I took these pictures on the way.

These are my observations and thoughts.

Changing At Grantham

A few minutes after getting off the LNER Azuma, the East Midlands Railway Class 156 train arrived at the opposite face of the wide platform.

Unlike some changes you get on trains in the UK, it was all rather painless and unhurried.

The change coming home was a bit slower, but there is a bar on the London platform, that serves a good selection of good beers.

Grantham To Skegness

The journey to Skegness took around an hour and a half and I arrived at 13:51.

Skegness Station

Skegness station is not the grandest, but it does have six platforms, which is probably a lot for just an hourly service from Nottingham and Grantham.

Skegness

I didn’t stay long, as it was surprisingly too cold and I hadn’t brought a coat.

Skegness To Grantham

The return trip was better, as the train was a more modern Class 170 train.

Surely, when East Midland Railways get their full quota of Class 170 trains, then the Poacher Line between Nottingham and Skegness will be one of the routes, where they will be used.

I also suspect that with 100 mph trains always running the service, as opposed to the Class 156 trains, which are only 75 mph units, there could be speed improvements on the line.

  • Grantham and Skegness is 58 miles.
  • There are a large number of level crossings.

An hour service between Grantham and Skegness could be possible and might generate more passengers.

Rolls-Royce MTU Hybrid PowerPacks

I wonder if this route could be improved by fitting the Class 170 trains with Rolls-Royce MTU Hybrid PowerPacks?

  • The hybrid technology would have a lower fuel consumption and allow electric operation in stations.
  • The prototype hybrid is already working on Chiltern Railways in a Class 168 train.
  • The Class 168 train is an earlier version of the Class 170 train and they are members of the Turbostar family.
  • Rolls-Royce are developing versions of these hybrid transmissions, that will work with sustainable fuels.
  • As we have a total of 207 Turbostar trainsets, these could be a convenient way of cutting carbon emissions on long rural lines.
  • As Rolls-Royce MTU are also developing the technology, so their diesel engines can run on hydrogen, it is not outrageous to believe that they could be on a route to complete decarbonisation of this type of train.

I believe that we could see hydrogen-hybrid Class 170 trains, with a Rolls-Royce badge on the side.

The Massive Greenhouse

I found that this was owned by Fountain Plants.

Is Lincolnshire going to grow the UK’s greens? Or at least give them a good start in life?

More greenhouses like this will enable the UK to create our carbon dioxide and eat it!

 

 

July 17, 2022 Posted by | Food, Hydrogen, Transport/Travel | , , , , , , , , , , | 1 Comment

Beeching Reversal – Firsby And Louth

This is one of the Round 3 bids of Beeching Reversal projects that the Government and Network Rail are proposing to reverse some of the Beeching cuts.

The Proposed Route

This route was part of the historic East Lincolnshire Railway, which is shown in this diagram from Wikipedia.


Note.

  1. North of Louth, the line used to connect to Grimsby Town, Immingham and Cleethorpes.
  2. The loop that goes through Mablethorpe.
  3. Boston is to the South.
  4. The Poacher Line between Boston and Skegness is the only section that is still open.

These Google Maps show sections and features of the route.

North From Spilsby Road Level Crossing

The Spilsby Road level crossing is in the South-West corner, with the track of the old railway between Firsby and Louth going to the North-East.

Junction With The Poacher Line

This is an enlargement of the South-West corner of the map.

  • The Spilsby Road level crossing can be seen.
  • The Poacher Line does a loop and goes South-East on its way to Skegness.
  • It looks like Firsby station was quite important, with three platforms and lots of facilities.

A junction could be built here to connect the Firsby and Louth line to the Poacher Line.

Would a station built between the lines, be possible to provide interchange between the Louth and Skegness trains?

Willoughby Station

Note.

  1. The scar of the East Lincolnshire Railway can be followed from the South-East corner to the North-West corner of the map.
  2. The green scar of the Mablethorpe loop can be seen branching off from the East Lincolnshire Railway to the North-East corner of the map.

Could a station be rebuilt at Willoughby?

Alford And Alford Town Station

Note.

  1. The green scar of the East Lincolnshire Railway can be can be followed from the South-East corner to the North-West corner of the map.
  2. The town is Alford
  3. If you click on the map to enlarge it, you can see Station Road, which must have been the location of Alford Town station.

I would have thought a station would be needed.

Straight Between Alford And Louth

Note.

  1. The green scar of the East Lincolnshire Railway can be can be followed from the South-East corner to the North-West corner of the map.
  2. There are three stations on this section; Aby for Claythorpe, Authorpe and Legbourne Road.

This section would appear to be a rail engineer’s dream.

How many stations would be needed?

Louth

Note.

  1. The green scar of the East Lincolnshire Railway can be can be followed from the South-East corner to the North edge of the map.
  2. Louth is the largest town in Lincolnshire without a station.

It could be difficult to thread the line through the town.

Onward To Grimsby

 

The map shows the final section of the route between Louth and Grimsby.

Note that from North of New Waltham, the track bed has been used for Peeks Parkway.

Does this mean that any reopened rail line between Firsby and Louth must end at New Waltham or Louth?

Grimsby Town Station And Centre

Note.

  1. Grimsby Town station is in the West.
  2. The rail line between Grimsby Town and Cleethorpes stations runs across the map.
  3. Peeks Parkway runs up the East side of the map.
  4. It looks to me, that this was once a large triangular junction, that also allowed trains to go between Grimsby Town an Louth stations.

Grimsby town centre seems to have been planned for cars and losers without cars can go elsewhere.

Thoughts On The Firsby And Louth Rail Link

I have a few thoughts on the possible design of a rail link between Firsby and Louth.

Should The Line Allow Freight Trains?

It might be a future need that freight trains will need to go between say Peterborough and Immingham, but I don’t think any use that route at present.

So other than the occasional maintenance train, I think the route could be freight-free at present.

Should The Line Terminate at Grimsby?

Consider.

  • Grimsby is a town of 88,000
  • It is a large centre for food processing, which needs large numbers of people.
  • Grimsby is becoming an increasing important centre for the development of renewable energy.
  • Grimsby and Boston are nearly fifty miles apart, which illustrates that Lincolnshire is not a small county.

I believe in a perfect world, Grimsby would have an hourly train service to Boston via Louth and several other stops.

Terminating at Louth rather than Grimsby would be like terminating all trans pennine services at Leeds.

So how would a line terminate at Grimsby?

  • The missing side of the triangular junction could be rebuilt, so that traIns could run between Grimsby Town and Louth stations.
  • Trains could terminate at a new Grimsby South station on the outskirts of the town.
  • Trains could continue through Grimsby Docks station and terminate at Cleethorpes. with possibly an additional station in Grimsby town centre.

There is always an innovative tram-train solution, where with a small amount of street running, they sneaked into the town centre and called at Grimsby Town station and the major places people needed to visit.

This solution has been proposed for Ipswich and Felixstowe by East West Rail to increase the capacity on the Felixstowe Branch. I wrote about this scheme in Could There Be A Tram-Train Between Ipswich And Felixstowe?.

It would be challenging, but I think that it might be possible.

Failing that, I believe that a single-track could be sneaked along Peeks Parkway and go through the town centre to Grimsby Docks and Cleethorpes. stations.

The distance between Cleethorpes and New Waltham is about 7 miles.

A train would probably take about ten minutes.

Any town centre station could be a single platform.

Would An Hourly Service Be Enough?

An hourly service between Boston and Louth would probably be enough, but in an ideal world two trains per hour (tph) would probably be better.

  • A single-track section between New Waltham and Cleethorpes could probably handle four tph working bi-directionally.
  • Two tph is also regularly handled on single platform stations, like Galashiels and Newcourt.
  • The long straight sections of the route offer lots of scope for loops.

My feeling, is the service should start hourly, but that it can be designed to be upgraded to two tph. Or it could even work at two tph at certain times of the day.

Could Boston and Cleethorpes Be Run In Fifty Minutes?

Consider.

  • This time would be ideal for a service as it would give ten minutes to turn the trains at both ends.
  • Boston and Cleethorpes would be the longest service that would be run and it is 50 miles.
  • Fifty minutes would need an average speed including stops of 60 mph.
  • Ipswich and Cambridge is run at an average of 43.2 mph with seven stops.
  • The straight and flat Breckland Line has an operating speed of between 75 and 90 mph.
  • Trains between Cambridge and Norwich average 53 mph with six stops.

I believe that the Firsby and Louth line could be built with an operating speed of up to 90 mph and fifty minutes between Boston and Cleethorpes could be possible.

Will Firsby And Louth Be Single Track?

I believe that the route can be single track with one platform stations.

This will save both space and costs and would probably allow two tph with careful design.

As there are long straight sections to the North of Alford, I suspect it wouldn’t be difficult to add passing loops, if they were required.

What Rolling Stock Would Be Used?

Lincolnshire is a renewable energy-rich county and because of offshore wind and the HumberZero project, Lincolnshire will probably have more wind power and green hydrogen per head of population, than any other area of the UK.

So undoubtedly, the trains will be zero carbon, which means, electrification, battery electric or hydrogen trains.

If new trains are in the budget, then the obvious candidate is the Hitachi Regional Battery Train.

The specification is given in this Hitachi infographic.

Note that it is a 100 mph train with a range of 56 miles.

It would need to be charged at both ends of the route.

In Cleethorpes Station – 16th September 2020, I suggested that electrification be added between Cleethorpes and Habrough stations should be electrified, so Cleethorpes and Manchester services could be run by Hitachi Regional Battery Trains.

This electrification could be used to charge the trains at Cleethorpes or a charging system could be installed.

This Google Map shows Boston station.

Note.

  • The station has only two platforms.
  • It looks like there were two North-facing bay platforms.

A charging system would be added to charge the trains.

The other obvious train for the route, would be Alstom’s Class 600 train, which is powered by hydrogen.

This is a visualisation of the train.

The specification has not been published yet, so there is no idea of the operating speed, although the range will be several hundred miles.

I speculated about the train in Breeze Hydrogen Multiple-Unit Order Expected Soon.

  • There will be plenty of hydrogen available in Lincolnshire if the Humber Zero project goes to plan.
  • Trains may be able to do several trips between refuelling.
  •  Trains will not need any infrastructure at Boston.

The forsby and Louth route would be an ideal route for both trains.

The Hitachi product will probably be slightly larger, faster and new!

 

 

 

March 17, 2021 Posted by | Hydrogen, Transport/Travel | , , , , , , , , , | 2 Comments

Beeching Reversal – More Stopping Services At Radcliffe-on-Trent And Bottesford Stations On The Poacher Line Between Grantham And Nottingham

This is one of the Beeching Reversal projects that the Government and Network Rail are proposing to reverse some of the Beeching cuts.

It is one of a pair of submissions from the local MP; Alicia Kearns. The other is Increased Services To Nottingham And Leicester, via Syston And Loughborough From Melton Mowbray.

When I heard of the MP’s submissions, I wrote MP Campaigns To Extend Train Services For Melton Borough and the following uses that post as a starting point.

Wikipedia says this about services at Bottesford station on the Poacher Line.

  • The service is generally every two hours to Nottingham in the West and Skegness in the East.
  • Some trains call at Grantham and have a connection to the East Coast Main Line.
  • LNER services at Grantham connect to Doncaster, King’s Cross, Leeds, Lincoln, Peterborough, Stevenage, Wakefield and York.
  • Bottesford is in the Borough of Melton and their is no direct rail service between Bottesford and Melton. A typical journey takes over two-and-a-half hours with two changes, that can include a wait of an hour at Leicester station.
  • Bottesford is in the County of Leicester. There is no direct rail service between Bottesford and Leicester.

I think the MP has a point and an improved and more frequent service at Bottesford could be very beneficial.

  • Many routes like this in the UK have a regular hourly service. Coastal stations with a regular hourly or better service include Blackpool South, Cleethorpes, Cromer, Exmouth, Felixstowe, Kings Lynn, Paignton, Scarborough and Sheringham
  • I suspect many communities along the Poacher Line would benefit from a regular hourly service.
  • All services calling at Grantham for East Coast Main Line services would be useful.
  • Do services have a good interchange at Nottingham for Midland Main Line services?

Replacing 75 mph Class 153 and Class 156 trains with 100 mph Class 170 trains would probably be a big help.

Conclusion

It looks like improvements at Bottesford would not require any new expensive infrastructure.

But East Midlands Railway would need more trains and they would probably need to be faster too!

 

August 22, 2020 Posted by | Transport/Travel | , , , | 2 Comments