The Anonymous Widower

Forest Gate Station Is Almost Ready For Crossrail

These pictures show the almost complete Forest Gate station.

Compare them with these from 2014 in  Before Crossrail – Forest Gate.

I wonder what wil happen to the pepper pot. I think it used to be a coffee kiosk.

The staff said, that one is needed.

March 8, 2019 Posted by | Transport | , , | Leave a comment

Maryland Station Is Almost Ready For Crossrail

These pictures show the almost complete Maryland station.

Compare them with these from 2014 in  Before Crossrail – Maryland.

A sow’s ear has been turned into a silk purse.

March 8, 2019 Posted by | Transport | , , | Leave a comment

More Than A Thousand People In This Town Want A Rail Service To Cambridge

The title of this post is the same as that of this article on Cambridgeshire Live.

This is the first three paragraphs.

t’s a town talked about more for its struggling market than its booming businesses.

But more than a thousand people in St Neots have signed a petition wanting to see that end.

The petition, which was started by Michelle Woodbridge, a resident from the town, wants the ‘forgotten’ area to be part of a new rail connection between Oxford and Cambridge – which people believe may revitalise the area.

St. Neots station is on the East Coast Main

  • It is to the East of the town.
  • The station has a new footbridge with lifts.
  • It has an half-hourly Thameslink service between Peterborough and Horsham, with extra services in the Peak.
  • There is a bus connection to Cambridge

This Google Map shows the Eastern area of the town around the railway station.

Note.

  1. The large area of development to the East of the station.
  2. The A428 road running across the bottom half of the map.
  3. The A428 is being upgraded and could become a dual-carriageway route to Cambridge via Caxton Gibbet, Cambourne and Madingley.

The East-West Rail Link between Oxford and Cambridge is planned to cross the East Coast Main Line at Sandy and then take a Southerly route to Cambridge South station.

The Route Option B is described like this in Wikipedia.

Route B involves running from the Marston Vale line to a new Bedford South station before then running to a relocated Sandy (to the north Tempsford area or south of St. Neots). The route heads east to a new station in Cambourne before swinging south to join the existing line northbound to Cambridge.

It does seem a bit of a roundabout route, but the new station at Tempsford could be a well-placed Park-and-Ride station for Cambridge.

I don’t think that the choice of route between Bedford and Cambridge will be easy.

However, certain factors may help in the design of the route.

An Improved A1 Road

The A1 road runs North-South to the West of the East Coast Main Line.

The road is only a two lanes in each direction and probably needs improvement.

So the improvements could be done in conjunction with the building of the East-West Rail Link.

The East Coast Main Line Is Four Tracks

Much of the East Coast Main Line is four tracks or could be made so, through St. Neots and Sandy stations.

Both stations have four platforms.

Sandy Station Could Be An Interchange Between The East-West Rail Link And The East Coast Main Line

I wouldn’t be surprised to see Sandy station developed into a comprehensiove interchange station, either in its present position or slightly closer to St. Neots.

It would  be served by the following services.

  • East Coast Main Line services between Kings Cross, the North of England and the East of Scotland.
  • Tramslink services between London and Peterborough.
  • East-West services between Cambridge and Oxford via Bedford and Milton Keynes.

It would also be a Park-and Ride station for London, Bedford and Cambridge.

The East Coast Main Line Will Be Digitally Signalled

This must help increase the numbers of trains on the Route.

Greater Anglia Are Ambitious

I just wonder if there was a flyover at Sandy station, if trains could use the East Coast Main Line and the East West Rail Link to create a new service from Cambridge to Peterborough via Cambridge South, Sandy, St. Neots, and Huntingdon.

It would suit Greater Anglia’s ambitions and the 100 mph Class 755 trains could handle the partially-electrified route with ease.

There could even be a circular service, where trains returned from Peterborough via March, Ely, Waterbeach and Cambridge North.

  • The trains would not terminate at Cambridge, but would go through the three Cambridge stations in order.
  • Four trains per hour (tph), with two going via Sandy and two via Ely could be handled in a single platform at Peterborough.

I estimate the following times are possible

  • Cambridge and Peterborough via Sandy – 60 minutes
  • Cambridge and Peterborough via Ely – 50 minutes

Two tph doing the circular route in both directions would need eight trains. All stations would get at least two tph service to Cambridge and Peterborough.

Conclusion

I can see a time when there is a direct service between Peterborough and Cambridge via Cambridge South, Sandy, St. Neots, and Huntingdon.

St. Neots would have a two tph service to Cambridge South, Cambridge, Cambridge North, Ely and Peterborough.

March 8, 2019 Posted by | Transport | , , , , , | Leave a comment

Northern Connect Between Chester And Leeds To Start In May

This article on the BBC is entitled New Rail Services Aim To Ease Overcrowding.

This is an extract.

Northern will be adding direct services between Chester and Leeds.

I think this will be the proposed Northern Connect service.

  • The route is via Warrington Bank Quay, Manchester Victoria, Rochdale, Halifax and Bradford Interchange stations.
  • Only the twenty-two miles between Warrington Bank Quay and Manchester Victoria stations is electrified.
  • Wikipedia says that the service will be run using a Class 195 train.

Looking at the current timetable, these times are achieved.

  • Chester and Newton-le-Willows – 38 minutes
  • Newton-le-Willows and Manchester Victoria – 18 minutes
  • Manchester Victoria and Leeds – 75 minutes

This totals up to two hours and eleven minutes.

The Class 195 train is a 100 mph diesel multiple unit and may knock a few minutes from this time.

On my trip to Wigan last month, I heard a rumour from a driver, that the Chester and Leeds service would be run by Class 769 trains.

  • These trains could use electrification between Warrington Bank Quay and Manchester Victoria stations.
  • They would be slightly slower, than the new Spanish trains on diesel.

It will be interesting to see, which trains Northern use for the service.

March 8, 2019 Posted by | Transport | , , , , | 20 Comments

Government Turns Up Power On Offshore Wind

The title of this post, is the same as that of an article in yesterday’s copy of The Times.

This is the first paragraph.

A third of British electricity will be generated by offshore wind farms by 2030 under government plans.

Although Jeremy Corbyn said he would reopen coal mines a couple of years ago, I can’t see a change of Government stopping this.

A few other points from the article.

  • Last year offshore wind produced about eight percent of our electricity needs.
  • The offshore wind energy industry has said it will raise UK content from 48 to 60 percent.
  • The industry has promised to invest £250million in the supply chain.
  • There are 1,900 turbines in British waters, which can generate 8GW.
  • Another 6GW will come on stream by 2022-23.
  • Another 16GW are in the planning stage.

The author feels that as costs are reducing, this is driving the investment.

Conclusion

We have a very windy future.

 

March 8, 2019 Posted by | Uncategorized | , | Leave a comment

Manor Park Station Is Almost Ready For Crossrail

These pictures show the almost complete Manor Park station.

Compare them with these from 2014 in  Before Crossrail – Manor Park.

The station has been through an amazing transfomation.

 

March 8, 2019 Posted by | Transport | , , | 1 Comment

Roaming Around East Anglia – Reedham Station

If you have to travel between Lowestoft and Great Yarmouth stations by train, you have to change at Reedham station. Or you should be able to!

These pictures show the station.

You can’t do the direct journey between East Anglia’s two largest Eastern towns at present, as Network Rail have got their special Project Management knickers on. You know the ones with a twist!

So passengers between Lowestoft and Great Yarmouth have three options.

  • Take an hour and a half jurney via Norwich.
  • Take a bus, which probably visits half of the villages in the local area.
  • Drive.

Hopefully, the Reedham to Great Yarmouth service will be restored sometime in the near (?) future.

This will allow two ways to travel by rail between Lowestoft and Great Yarmouth.

Changing Trains At Reedham Station

Theoretically, this should work, especially, if trains were timetabled so that passengers waited perhaps a couple of minutes on what I suspect in winter can be a very pleasant station.

Look at the footbridge. Do Greater Anglia really expect elderly travellers or those with bikes, buggies and baggage to use the Victorian footbridge?

I suspect Greater Anglia don’t see this as a feasible way of attracting more passengers out of their cars and from the buses.

But Network Rail haven’t got the millions of pounds needed to bring the station into the Twentieth Century!

A Shuttle Train Reversing At Reedham

It would be possible for a train to shuttle between Lowestoft and Great Yarmouth, which could reverse in Reedham station.

In Norfolk Rail Line To Remain Closed As £68m Upgrade Project Overruns, I asked if the new Class 755 trains had a fast reverse procedure, as Greater Anglia’s services are full of stations, where a train must arrive and leave a few minutes later.

I wrote the following.

A simple system could be as follows.

  • On arrival in a station, the driver would put the train into a standby mode, when it was safely stopped.
  • The driver would then walk through the train to the second cab.
  • Whilst the driver is changing ends, the conductor is opening and closing the train doors and supervising the loading and unloading of passengers.
  • On arrival in the second cab, the driver would wake up the train and check everything.
  • After the doors are closed and having received the all clear from the conductor and a green light from the signals, the driver would proceed.

At all times, the driver and conductor, would have emergency remote controls to immobilise the train, if something is not what it should be.

Modern automation is certainly able to design a very safe system, that would save time at every reverse.

The stop ar Reedham station would become an almost normal stop and I would expect that a train could reverse  in about two or three minutes.

Use Only One Platform At Reedham

Could this be the most affordable solution?

  • The track layout at Reedham station would be modified, so that all trains would use the Norwich-bound Platform 1.
  • Platform 1 is improved with a quality waiting room and a coffee kiosk, to make a short wait between trains more pleasant.

If there were two trains per hour on both the Lowestoft and Great Yarmouth routes, I’m sure that with the new signalling and good driving, a single-platform at Reedham station would work.

Trains from Norwich could call at XX00, XX15, XX30 and XX45, with trains to Norwich calling at XX07, XX22, XX37 and XX52.

If trains stopped in the right order, then there would be a maximum wait of eight minutes in a comfortable waiting room at Reedham station.

Even with only one train per hour between Norwich and Yarmouth via Reedham, I’m certain an acceptable timetable could be devised.

Greater Anglia’s Class 755 trains

Greater Anglia have ordered thirty-eight Class 755 trains, which have a total of 138 cars.

These will replace twenty-six assorted trains, which have a total of 55 cars.

This is a increase of 46% in the number of trains and  150% in the number of cars.

Greater Anglia didn’t increase the fleet so that could sit in sidings, so I think we can expect some new services and higher frequencies.

Conclusion

I’m certain that a sensible hourly service between Lowestoft and Great Yarmouth stations can be devised.

 

 

March 8, 2019 Posted by | Transport | , , , , , | 1 Comment