Do Sat-Navs Exploit Rat Runs

This afternoon my son brought me home in his car through North-East London.

  • He was using a sat-nav and it was a mazy drive down a succession of narrow residential roads usually with cars parked on both sides.
  • I’m sure we did two totally unnecessary loops.
  • He also approached my house the wrong way, so he did two unnecessary right turns.

I’ve never used a sat-nav and doubt I ever will, as I don’t drive any more and when I’m walking, I prefer to use a proper map, like there are on most London bus stops or train stations.

I wonder how many acxcidents and traffic jams are caused by sat-navs.

 

 

November 17, 2019 Posted by | Transport | , | 4 Comments

What Would Be The Range Of A Tri-Mode Class 802 Train?

In Could Cirencester Be Reconnected To The Rail Network?, I speculated about the routes of a battery-electric version of a Class 800 train.

I said this.

As Hitachi have stated they will be using battery power to extend ranges of their trains, I wouldn’t be surprised to see some of the current trains modified to have batteries instead of some of their current diesel engines.

Such a train would would be ideal for the following routes.

  • Paddington and Bedwyn – 13 miles
  • Paddington and Cheltenham – 43 miles
  • Paddington and Oxford – 10 miles
  • Paddington and Weston-Super-Mare – 19 miles

The distance is the length that is not electrified.

I don’t think it improbable, that London Paddington and Swansea will be achieved by a battery-electric train based on the current Hitachi train designs.

So was it a serious idea or mad speculation?

Under Powertrain in the Wikipedia entry for theClass 800 train, this is said.

Despite being underfloor, the generator units (GU) have diesel engines of V12 formation. The Class 801 has one GU for a 5-9 car set. These provide emergency power for limited traction and auxiliaries if the power supply from the overhead line fails. The class 800/802 electro-diesel or Bi-Mode has 3 GU per five car set and 5 GU per nine car set. A 5 car set has a GU situated under vehicles 2/3/4 respectively and a 9 car set has a GU situated under vehicles 2/3/5/7/8 respectively.

This means that a five-car Class 800 or Class 802 train has three engines and an all -electric Class 801 train has a single engine.

If you were building a tri-mode Class 802 train, could two of the diesel engines be replaced by batteries.

  • Hitachi have stated that trains can be changed from one class to another by adding or removing engines.
  • Trains would always have at least one diesel engine for emergencies, just as the Class 801 trains do.
  • Each MTU 1600 R80L diesel engine weighs just under seven tonnes.

Fourteen tonnes of batteries would probably store about 840 kWh of energy, if the most efficient batteries are used. That would not be a problem if Hitachi came calling.

In How Much Power Is Needed To Run A Train At 125 mph?, I calculated that a five-car Class 801 train needs 3.42 kWh per vehicle mile to cruise on electricity at 125 mph.

Dividing 840 by 5 cars and 3.42 kWh per vehicle file gives a range of forty-nine miles.

  • The trains would need regenerative braking to the batteries.
  • Battery energy density is increasing.
  • Train aerodynamics could be improved, to reduce the power needed.
  • Secondary routes like the Golden Valley Line are unlikely to have an operating speed higher than 110 mph, which would reduce the power needed.

I am coming round to the opinion, that Hitachi could design a battery-electric train based on the current Class 80X trains, that could reach Swansea from Paddington, without touching a drop of diesel.

  • The batteries would need to be recharged before returning to London.
  • I am assuming that the electrification is up and working between Paddington and Cardiff.
  • Could the wires in the Severn Tunnel be removed or replaced with engineering plastic,  as they corrode so much?
  • Two five-car trains with batteries could work together as they do now.

Hitachi would need to get the software absolutely right.

Could The Diesel Engine Be Used To Increase Battery Range?

Lets assume that a tri-mode Class 802 train is running on a 125 mph main line.

It enters a section without electrification.

  • It is cruising at 125 mph
  • The batteries have a capacity of 840 kWh and have been charged on previous electrification.
  • The train needs 3.42 kWh per vehicle mile to maintain speed.
  • It’s a five-car train  so it will need 17.1 kWh per mile.
  • The train will take approximately thirty seconds to cover a mile and in that time the diesel engine will produce 5.83 kWh.
  • So the net energy use of the train will be 11.27 kWh per mile.

This would give the train a range of 74.5 miles at 125 mph.

Obviously, a good driver, aided by a powerful Driver Assistance System could optimise the use of power to make sure the train arrived on time and possibly minimised carbon emissions.

What Would Be The Ultimate Range?

I think it would be possible to reduce the electricity consumption by means of the following.

  • Slower operating speed.
  • Better aerodynamics.
  • More efficient train systems.
  • Improved Driver Assistance Systems.

I think an energy consumption of 2.5 kWh per vehicle-mile could be possible, at perhaps a cruise of 100 mph

I can do the calculation without diesel assistance.

  • It’s a five-car train  so it will need 12.5 kWh per mile.

This would give the train a range of 67.2 miles at 100 mph on batteries alone.

I can also do the calculation again with diesel assistance.

  • It’s a five-car train  so it will need 12.5 kWh per mile.
  • The train will take thirty-six seconds to cover a mile and in that time the diesel engine will produce 7 kWh.
  • So the net energy use of the train will be 5.5 kWh per mile.

This would give the train a range of 153 miles at 100 mph on batteries with diesel assistance.

How Many Places Could Be Reached With A Fifty-Mile Range?

Setting a limit of fitly miles would allow running these routes on partial battery power, split down by companies who run the Hitachi trains.

Great Western Railway

These routes could certainly be run using a tri-mode Class 802 train.

  • Paddington and Bedwyn – 13 miles
  • Paddington and Cheltenham – 43 miles
  • Paddington and Oxford – 10 miles
  • Paddington and Swansea – 46 miles
  • Paddington and Weston-Super-Mare – 19 miles
  • Swindon and Bristol via Bath – 39 miles

Note.

  1. The distance gives the length of the longest section of the route without electrification.
  2. Certain routes like Bedwyn, Oxford and Weston-super-Mare probably wouldn’t need a charging station at the final destination.
  3. GWR could probably run a few other routes, without adding substantial new infrastructure.
  4. Tri-mode Class 802 trains, might be able to avoid electrification through Bath.

But surely the the biggest gain is that they would reduce GWR’s carbon footprint.

Hull Trains

I very much feel that with a charging station at Hull station, a tri-mode Class 802 train could bridge the forty-four mile gap between Beverley and the electrified East Coast Main Line at Temple Hirst Junction.

  • The train could top up the battery every time it stops in Hull station.
  • The 700 kW diesel engine could add 700 kWh in the hour long trip with no wires.

If a tri-mode Class 802 train could bridge this gap, then Hull Trains could go zero carbon.

LNER

These routes could certainly be run using a tri-mode Class 802 train.

  • Kings Cross and Bradford – 14 miles
  • Kings Cross and Harrogate – 18 miles
  • Kings Cross and Huddersfield – 17 miles
  • Kings Cross and Hull – 36 miles
  • Kings Cross and Lincoln – 16 miles
  • Kings Cross and Middlesbrough – 21 miles

Note.

  1. The distance gives the length of the longest section of the route without electrification.
  2. Certain routes like Bradford, Harrogate, Huddersfield, Lincoln and Middlesbrough probably wouldn’t need a charging station at the final destination.
  3. LNER could probably run a few other routes, without adding substantial new infrastructure.
  4. Using both battery and diesel power, the train would be able to make Cleethorpes and Grimsby after Lincoln.

But surely the the biggest gain is that they would reduce LNER’s carbon footprint.

TransPennine Express

These routes could certainly be run using a tri-mode Class 802 train.

  • Leeds and Huddersfield – 17 miles
  • Liverpool and Edinburgh – 34 miles
  • Liverpool and Hull – 34 miles
  • Liverpool and Scarborough – 34 miles
  • Manchester Airport and Middlesbrough – 34 miles
  • Manchester Airport and Newcastle- 34 miles

Note.

  1. The distance gives the length of the longest section of the route without electrification.
  2. TransPennine Express services all suffer because of the long gap across the Pennines.
  3. Network Rail are planning to partly electrify Dewsbury and Huddersfield, which would reduce the major gap to just eighteen miles.

As with GWR, Hull Trains and LNER, the carbon footprint would be reduced.

Conclusion

A tri-mode Class 802 train would be a good idea.

It should be noted that GWR, Hull Trains and TransPennine Express are all First Group companies.

 

 

 

November 17, 2019 Posted by | Transport | , , , , , | 7 Comments

TransPennine Express’s New Liverpool Lime Street And Glasgow Central Service

Transpennine Express are introducing a new service between Liverpool Lime Street and Glasgow Central stations at the December 2019 timetable change.

So I examined the service for the the 21st January, 2020.

  • There are three Northbound trains at 08:12, 12:12 and 16:12.
  • There are three Southbound trains at 07:45, 11:44 and 16:29
  • Journey times vary between three hours and 17 minutes and three hours and 47 minutes.
  • Trains appear to always stop at Wigan North Western, Preston, Penrith North Lakes and Carlisle.
  • Selective services call at other stations including Lancaster and St. Helens Central.

As passengers can always travel the route with a change at Preston, it is a useful start. It should also be born in mind that there are currently, two trains per hour (tph) between Glasgow Central and Preston stations, so the route with a change at Preston can be quicker than waiting for a direct train.

If you look at the Transpennine service between Manchester Airport and Glasgow Central stations, it appears that there are gaps in the hourly service at 08:00, 12:00 and 16:00.

These gaps have now been filled with Liverpool services.

Current and Future Trains Between Liverpool or Manchester and Glssgow or Edinburgh

The current service is run by nine Class 350 trains, which includes the following.

  • One tph between Between Manchester Airport and Glasgow Central, with three services missing.
  • One train every two hours between Manchester Airport and Edinburgh.

The service from the December 2019 change will at some point be run by twelve Class 397 trains.

It will add three trains per day between Liverpool Lime Street and Glasgow Central, which will give an hourly TranPennine service between Glasgow Central and Preston.

I estimate that the new service will require two more trains, which is incorporated in the larger fleet size.

Timings Between Preston And Glasgow

If you look at the limitings between Preston and Glasgow, you find the following.

  • Virgin’s Class 390 trains take between two hours 21 minutes and two hours 34 minutes.
  • The new Liverpool service is timetabled to take two hours 53 minutes.

As the current Class 350 trains are only 110 mph trains, this is the explanation.

But the new Class 397 trains are 125 mph trains and can probably match the times set by Virgin.

So expect to see some timing reductions on TransPennine’s routes on the West Coast Main Line.

Will Services Between Liverpool And Manchester and Glasgow Split And Join At Preston?

TransPennine Express are meeting their franchise obligations, by providing three trains per day between Liverpool ad Glasgow, but could they do better by splitting and joining services at Preston.

  • Going North, a service from Manchester Airport and one from Liverpool would join at Preston, before proceeding to Glasgow as a ten-car train.
  • Coming South, a pair of trains from Glasgow, would split at Preston, with one train going to Liverpool and the other to Manchester Airport.

Obviously, the trains would need to be able to split and join in a minute or so, but it would open up the possibility of an hourly service from both Liverpool and Manchester to Glasgow.

Liverpool And Manchester To Edinburgh

After the December 2019 timetable change, TransPennine’s Liverpool and Newcastle service will be extend to Edinburgh, giving Liverpool a direct service to \Edinburgh and Manchester, a second service to Edinburgh.

Timings by the various routes will be.

  • Liverpool and Edinburgh via Manchester, Leeds and York – Four hours 28 minutes – Hourly
  • Manchester Piccadilly and Edinburgh via Preston and Carstairs – Three hours 10 minutes – Two hourly
  • Manchester Victoria  and Edinburgh via Leeds and York – Three hours 52 minutes – Hourly

These times compare well with the four hours drive predicted on the Internet.

Conclusion

Connections between Northern England and the Central Belt of Scotland will improve greatly after the December 2019 timetable change.

New trains on these routes will also mean faster services, where they run on the East and |West Coast Main Lines.

More trains will also increase frequency.

 

November 17, 2019 Posted by | Transport | , , , , , , , | 2 Comments