Rochdale Still Doesn’t Have A Direct Link To Manchester Airport
The title of this post is the same as that of this article on Richdale Online.
I recently went to Rochdale to see Ipswich play and what surprised me about the town, was how far it was from my hotel close to Manchester Victoria station.
I went on a tram and it took over an hour and it was also very crowded.
I then walked about a mile to the football ground. Luckily a friendly Rochdale supporter showed me the way.
But is Rochdale’s link to Manchester Airport, any worse than say Walthamstow’s link to Heathrow or Gatwick.
- Rochdale Town Centre to Manchester Airport by train – 1:05
- Rochdale Town Centre to Manchester Airport by tram – 2:02
- Rochdale Station to Manchester Airport by train – 0,:55
- Rochdale to Manchester Airport by taxi- 0:27
- Walthamstow Central to Heathrow Airport by Underground and Heathrow Express – 1:05
- Walthamstow Central to Heathrow Airport by Underground – 1:27
- Walthamstow to Heathrow Airport by taxi – 1:27
- Walthamstow Central to Gatwick Airport by train – 1:22
Note.
- All journeys, except the taxis, need at least one change.
- My lawyer son lives in Walthamstow and always flies from Heathrow.
- He gets there by Underground, with one cross-platform change at Finsbury Park.
- Crossrail won’t help the man on the Walthamstow Underground.
- In Manchester the taxi is quicker, but it isn’t in London.
These are my thoughts.
Mancunians Are More Impatient
Not my view, but the view of a Northern station guy, who has worked on Platforms 13 and 14 at Manchester Piccadilly and busy stations on the London Overground.
He thought that they were sometimes in such a hurry to get on a train, that the train is delayed.
He also said, if you ask Londoners to stand behind the yellow line, they do. Mancunians don’t!
Access To Northern And TransPennine Trains Is Bad
Consider.
- There is often a step up into the train in Manchester.
- Manchester Metrolink is generally step-free into the tram.
- Parts of London Underground/Overground are step-free.
- The new TransPennine trains have pathetic and slow end-door access.
The two train companies have bought fleets of trains that are not fit for purpose.
The Manchester Airport Rail Link Is At Full Capacity
Manchester Airport station, does not have the best rail line from the City Centre.
Wikipedia says this.
Any future additional services to the Airport are in doubt without further infrastructure works; unresolved issues surround the lack of new ‘through’ platforms at Manchester Piccadilly which have been shelved by the government and the Styal Line to Manchester Airport operating at full capacity with little resilience to absorb delays.
The Rochdale Online article blames the stations in Manchester, but the Styal Line is equally to blame.
The Long Term Solution Is High Speed Two
In the 2030s, High Speed Two will solve the problem by using a tunnel between Manchester Airport and the City Centre.
It will also do the following.
- Provide direct access between Manchester Airport and the Midlands, the South and London.
- Provide direct access to Liverpool and Warrington in the West.
- Provide direct access to Huddersfield, Bradford, Leeds, Hull and the North East, in the East.
- All services will probably be at least five trains per hour (tph).
But High Speed Two won’t provide a direct link to Richdale.
Passengers between Rochdale and Manchester Airport will still have to change in the City Centre.
Unless of course, some TransPennine services to Manchester Airport are discontinued, as they can be done by High Speed Two.
This would free up paths to add extra services to Manchester Airport.
An Interim Solution
Not only Rochdale, but other towns and cities across the North like Bradford moan about lack of a direct service to and from Manchester Airport.
So what would I do?
Ban Freight Trains Through The Castlefield Corridor
This may not be possible, but it should be a long term objective.
It will cost money, but it would release capacity through the Castlefield Corridor.
Ban Trains Without Level Access At Stations In The Castlefield Corridor
I know that Northern and TransPennine have just bought a load of new trains, but they make matters worse in the stations through the Castlefield Corridor.
All Trains To The Airport Must Be Eight Cars
This makes sense as it increases the capacity, but use the same number of paths.
- Eight-car Class 379 trains – Stansted Express – 160 metres and 418 passengers
- Five-car Class 802 trains – TransPennine Express – 130 metres and 342 passengers
- Eight-car Class 331 trains – Northern – 190 metres and 568 passengers
It does appear that the new trains are also setting new standards for train length.
ERTMS Signalling Should Be Installed Between Manchester Victoria And Manchester Airport
ERTMS signalling would give more flexibility on the route.
Create A Manchester Airport Express
This has been suggested and would have the following characteristics.
- Running between Manchester Airport and Manchester Victoria via Deansgate, Manchester Oxford Road and Manchester Piccadilly.
- Eight cars
- Airport-style interiors
- Step-free access at all stations.
- Four tph
- Running twenty-four hours a day.
- It would have step-free access to the Metrolink at Manchester Victoria, Deansgate and Manchester Piccadilly.
Ideally it would use dedicated platforms at Manchester Airport and Manchester Victoria. The platform at Victoria would hopefully have cross-platform interchange with services going through the station from East to West.
Reduce TransPennine Services To The Airport
TransPennine Express runs the following hourly services to the Airport
- Cleethorpes via a reverse at Manchester Piccadilly.
- Edinburgh or Glasgow via the Castlefield Corridor
- Middlesborough via the Castlefield Corridor
- Newcastle via the Castlefield Corridor
Why not cut-back either the Newcastle or Middlesborough service to Manchester Victoria and make sure it has good cross-platform access to the Manchester Airport Express?
These services are regularly cut-back anyway due to the congestion.
Demolish Manchester Oxford Road Station And Build A Station That’s Fit For Purpose
Manchester Oxford Road is one of ultimate design crimes on the UK Rail network.
- The new or refurbished station would be step-free.
- Platforms would be able to accept two hundred metre long trains.
- A well-designed bay platform would be provided to turn trains from the North efficiently.
- Up to four tph could probably be turned back.
Network Rail do station and track layout design generally very well and I’m sure that a redesigned Oxford Road station could improve capacity through the Castlefield Corridor.
Improve Deansgate And Manchester Piccadilly Stations
If longer trains are to be run through the Castlefield Corridor, then the platforms at these two stations will need lengthening and passenger access will need to be improved.
Is There A Place For Tram-Trains?
Manchester are keen on using tram-trains to improve the Metrolink network.
This map clipped from Wikipedia shows the layout of the Metrolink in the City Centre.
Note.
- Manchester Piccadilly, Deansgate and Manchester Victoria all have step-free connections to the trains to and from Manchester Airport.
- The new Trafford Line will branch off at Pomona.
I think it is likely, that any new lines run by tram-trains will pass through at least one of the connecting stations.
This will increase the list of places that will have good access with a single change to and from Manchester Airport.
Conclusion
There would appear to be a lot of scope to create a high-capacity link between Manchester and the Airport.
But it does appear that the current timetable leaves little or no room to expand the service.
That is why, I believe a simpler but higher capacity service, based on a Manchester Airport Express could be developed.
No comments yet.
Leave a Reply