Connecting Manchester City Centre to the High Speed Two network will be a major undertaking.

  • It looks increasingly likely that High Speed Two and Northern Powerhouse Rail will have a shared line running from the main High Speed Two route through Crewe to Manchester Piccadilly via Manchester Airport.
  • Between Manchester Airport and Manchester Piccadilly will be in a high speed tunnel.
  • Northern Powerhouse Rail will connect Liverpool Lime Street and Warrington to Manchester Airport and Manchester Piccadilly.
  • There will be a major problem keeping train services running between Manchester and Birmingham, London and the South.

But just at Project Rio kept Manchester connected during the rebuilding of the West Coast Main Line in the early years of this century, I believe that a similar creditable alternative route may be starting to evolve.

Avanti’s Additional Class 807 Trains Will Be Delivered

These trains will allow additional services and release some Class 390 trains to reinforce other services.

Avanti West Coast’s Future West Coast Main Line Service

The small fleet of Class 807 trains are needed to provide extra services on the West Coast Main Line.

  • But if these trains are successful, will more be used as replacements for the nearly twenty-years-old Class 390 trains?
  • Will they also be given more traction power to double as the classic-compatible trains for High Speed Two.
  • Other operators might also like to purchase a high capacity 200 metre long high speed train, which would share routes used by High Speed Two.

In Thoughts On Class 807 Trains And High Speed Two’s Classic-Compatible Trains, I discuss the design of extra trains for High Speed Two and the West Coast Main Line.

Surely, though having similar trains handling both roles on the West Coast Main Line and High Speed Two, would be an advantage to Avanti West Coast?

London And Manchester Services

Currently, there are these services between London Euston and Manchester Piccadilly stations.

  • Via Milton Keynes Central, Stoke-on-Trent and Stockport
  • Via Stoke-on-Trent, Macclesfield and Stockport
  • Via Stafford, Crewe, Wilmslow and Stockport

All services have a frequency of one train per hour (tph)

High Speed Two plans to run these services between the South and the Manchester area.

  • 1 tph – 200 metres – London Euston and Wigan North Western via Old Oak Common, Crewe and Warrington Bank Quay
  • 1 tph – 200 metres – London Euston and Macclesfield via Old Oak Common, Stafford and Stoke.
  • 1 tph – 400 metres – London Euston and Manchester Piccadilly via Old Oak Common, Birmingham Interchange and Manchester Airport
  • 2 tph – 400 metres – London Euston and Manchester Piccadilly via Old Oak Common and Manchester Airport
  • 2 tph – 200 metres – Birmingham Curzon Street and Manchester Piccadilly via Manchester Airport
  • 1 tph – 200 metres – Birmingham Curzon Street and Wigan North |Western

Note.

  1. I have included Wigan North Western, as it has good connections to North Manchester.
  2. Services can’t go via Manchester Airport until the tunnel is completed.
  3. The 400 metre services will need to use dedicated High Speed Two tracks, so will need to use the tunnel via Manchester Airport.

Wigan and Macclesfield stations will not be requiring major rebuilding, during the construction of High Speed Two. That should mean the stations will not need to be closed for long periods.

  • Macclesfield station could probably handle up to three tph from the South.
  • Wigan North Western station could probably handle two tph from the South.
  • Work in the Manchester Piccadilly area, may well close the station at times.

I suspect Macclesfield and Wigan North Western could be very useful alternative stations for travelling to and from the South.

Manchester And Birmingham Via Macclesfield

I can see that there could be difficulties for some passengers, if they found themselves at Macclesfield wanting to go to the Birmingham area.

A solution would be for the Macclesfield and London service to stop at Birmingham Interchange, which will be extremely well-connected.

Birmingham Interchange

This map from High Speed Two, shows Birmingham Interchange and Birmingham International stations.

Note.

  • Birmingham Interchange station is marked by the blue dot.
  • Birmingham International station is to the West of the M42.

The two stations will be connected by an automatic people mover.

Destinations and their frequencies available from Birmingham Interchange, when High Speed Two is complete will include.

  • 2 tph – Birmingham Curzon Street
  • 1 tph – Carlisle
  • 1 tph – East Midlands Hub
  • 1 tph – Edinburgh Haymarket
  • 1 tph – Edinburgh Waverley
  • 1 tph – Glasgow Central
  • 1 tph – Leeds
  • 5 tph – London Euston
  • 1 tph – Manchester Airport
  • 1 tph – Manchester Piccadilly
  • 5 tph – Old Oak Common
  • 1 tph – Preston

It looks like if you miss your train to many important cities at Birmingham Interchange, it will be an hour to wait for the next train.

Destinations and their frequencies available from Birmingham International are currently.

  • 8 tph – Birmingham New Street
  • 1 tph – Bournemouth
  • 1 tph – Crewe
  • 0.5 tph to Edinburgh Waverley
  • 0.5 tph to Glasgow Central
  • 7 tph – London Euston
  • 1 tph – Macclesfield
  • 1 tph – Manchester Piccadilly
  • 1 tph – Reading
  • 1 tph – Shrewsbury
  • 1 tph – Southampton
  • 1 tph – Stafford
  • 1 tph – Stoke-on-Trent
  • 2 tph – Wolverhampton

Note that 0.5 tph is one train per two hours.

These two lists can be combined.

  • 10 tph – Birmingham Curzon Street/New Street
  • 1 tph – Bournemouth
  • 2 tph – Carlisle
  • 1 tph – Crewe
  • 1 tph – East Midlands Hub
  • 1.5 tph – Edinburgh Haymarket
  • 1.5 tph – Edinburgh Waverley
  • 1.5 tph – Glasgow Central
  • 1 tph – Leeds
  • 12 tph – London Euston
  • 1 tph – Macclesfield
  • 1 tph – Manchester Airport
  • 2 tph – Manchester Piccadilly
  • 5 tph – Old Oak Common
  • 1 tph – Preston
  • 1 tph – Reading
  • 1 tph – Shrewsbury
  • 1 tph – Southampton
  • 1 tph – Stafford
  • 1 tph – Stoke-on-Trent
  • 2 tph – Wolverhampton

This list is surely missing Bristol, Cardiff, Liverpool, Sheffield and Newcastle.

Conclusion

We should not underestimate the importance of Macclesfield and Wigan North Western stations in getting to and from Manchester during the building of High Speed Two.

July 15, 2020 - Posted by | Transport | , , , , , , , , , ,

No comments yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.