Walthamstow Village Has All Changed
These pictures show the implementation of the mini Holland in Walthamstow Village.
I like it! I wondr if these protestors have mellowed?
Exploring Tilbury Riverside
The idea was simple. I would walk from Tilbury Town station to the site of the former Tilbury Riverside station and have a look at the London Cruise Terminal and Tilbury Fort, before taking a ferry to Gravesend to come home.
But things didn’t quite work out as planned, as although I had a good walk in the wind to river, that wind was so bad the ferries had got themselves cancelled.
But I did find a nice place with a welcoming pub to go to in better weather!
The area does need a bit of improvement.
- The London Cruise Terminal looks as welcoming as a prison from the outside.
- Connections to Tilbury Town station are simple and spasmodic.
- Tilbury Fort certainly needed some more information.
- The chimneys behind the Fort are those of the Tilbury B power station, which burns biomass.
- The Ferry Terminal to Gravesend was also short of information. Especially, something like an electronic Next Ferry Indicator.
- There needs to be extension of the pedestrian routes.
- It would also help, if the trucks kept to the speed limit.
But most importantly, the area would get more visitors if Tilbury Riverside station was still being used.
Failing that a decent cycle route, with bicycle hire stations at either end.
Tilbury Town Station
Tilbury Town station shows how you can take a basic station and by trying hard can make it acceptable to most visitors.
I never visited the station in say the nineteen-sixties, but I suspect it is a lot better now!
I very much liked the step-free bridge that is available to everybody who wants to cross the line easily and safely, whether they intend to travel on the trains or not.
What I didn’t like was that the A1089 road outside the station, from where you walk to Tilbury Fort or the Ferry Terminal, as it is a race-track for heavy trucks.
The Google Map shows Tilbury Town station and its position with respect to the Port, the London Cruise Terminal, the Ferry Terminal and Tilbury Fort.
Tilbury Town station is at the top of the map by the A1089 road and the London Cruise Terminal is on the river. Conveniently there is a cruise ship alongside.
The railway to Tilbury Riverside station, which was next to the London Cruise Terminal was removed in 1992.
I would suspect that quite a few movers and shakers in the Tilbury area, feel that the closure of Riverside station was something that shouldn’t have been done, when they look back.
Electrification Of The East West Rail Link
East West Rail has this question about electrification in the FAQ.
Q: Will East West Rail be electrified and if so, when?
A: It is expected that the Western Section of the East West Rail link will include electrification of the line between Bedford and Oxford.
Bletchley to Oxford is expected to be completed first during the 2014-2019 railway funding period.
Bedford to Bletchley will follow, probably in the next railway funding period 2019-2024, as part of the wider work done to electrify the Midland Main Line to Corby, Nottingham and Sheffield.
The Office of Rail Regulation has confirmed funding in principle for the electrification. The exact amount of funding and scope is expected to be determined by the ORR by March 2015 following detailed development between NR, DfT and the train operators.
I will take this as a qualified yes or it would be desireable.
Bletchley to Oxford electrification is stated as being done first and if that timetable is met, it would be likely to be completed before services start on these routes.
- Oxford to Milton Keynes
- Milton Keynes to London via Aylesbury.
As both Oxford and Milton Keynes are currently or will be electrified by then, the services between the old and new cities could be performed by a 100 mph EMU, like a Class 387 train, which could then continue to Reading if required.
But there are no plans to electrify any of the London to Aylesbury Line. To complicate matters Chiltern Railways have a shortage of suitable diesel trains.
So although the line might be ready in 2019 or so, there would appear to be no chance of Chiltern Trains running between London and Milton Keynes.
Unless!
Wikipedia gives the length of the passenger section from London to Aylesbury Parkway as about thiry nine miles.
So this probably means that the line could be run by Class 387 IPEMU trains, if there was some electrification in Marylebone station to charge the trains before they travelled North.
It is an interesting possibility.
Especially, as an electrified Marylebone, would probably allow the same trains to run services to electrified stations at Bicester Village, Oxford Parkway and Oxford.
East West Rail Moves On Phase 2
East West Rail is the project to create an electrified 100 mph railway from Oxford to Ipswich and Norwich via Milton Keynes, Bedford and Cambridge.
This map from the East West Rail web site, indicates the route.
Phase 1 is now almost complete with the linking of Bicester to Oxford.
Services are running between Oxford Parkway and London Marylebone via Bicester Village. Hopefully, Oxford will be reached in Spring 2016.
A statement by East West Rail entitled Alliance contracts awarded for East West Rail Phase 2, has been relkeased about the award of contracts for Phase 2 of the line to connect Bicester, Milton Keynes and Bedford. This is said.
An alliance of four equal parts between Network Rail, Atkins, Laing O’Rourke and VolkerRail will build East West Rail Phase 2 (EWR2) – linking Oxford, Milton Keynes and Bedford, and Milton Keynes with London Marylebone via Aylesbury.
The contracts will enable the following services.
- Oxford – Milton Keynes (calling at Oxford Parkway, Bicester, Winslow and Bletchley)
- Oxford – Bedford (calling at Oxford Parkway, Bicester, Winslow, Bletchley, Woburn Sands and Ridgmont)
- Milton Keynes – Aylesbury – London Marylebone (an extension of the existing service between Marylebone and Aylesbury Vale Parkway, with stops anticipated at Bletchley, Winslow, Princes Risborough and High Wycombe)
- Increased capacity for freight services
The following work will be done.
- A new station at Winslow
- Two new platforms at Bletchley – Click for some details
- Construction of 18 new overbridges.
- Construction of 22 new footbridges/subways
- Changes to 97 railway crossings
It is not a small project.
I find it interesting that the work is an alliance of four companies.
This method of working has been used successfully at Stafford, in the Stafford Area Improvements Program to relieve the bottle-neck at Norton Bridge Junction on the West Coast Main Line.
Hopefully, it will avoid another Great Western Railway style of fiasco.
Forth Road Bridge In Trouble
The Forth Road Bridge has not been in the best of health for some years. Wikipedia has a section called Structural Issues and this is said.
2003 saw an inspection programme launched (at a cost of £1.2 million) to assess the condition of the bridge’s main suspension cables after excessive corrosion was discovered in a number of older bridges in the United States of a similar design and size. The study, which was completed in 2005, found that the main cables had suffered an estimated 8-10% loss of strength. Future projections highlight the likelihood of an accelerating loss of strength, with traffic restrictions to limit loading required in 2014 in the worst-case scenario, followed by full closure as early as 2020.
But now a different problem has arisen, as is reported in this article of the BBC. This said.
The Forth Road Bridge is to be closed until the new year because of structural faults, Transport Minister Derek Mackay has said.
This morning, there were long tailbacks on alternative routes.
It strikes me that this part of Scotland is in for not a very good Christmas.
At least the Forth Rail Bridge is its usual sturdy iconic self and I suspect that can cope with a few extra shuttle trains to help take the pressure of the roads.
HS2’s Interactive Map
For those who are worried, need to know or just plain curious, HS2 have put a very good quality interactive map on their web site on this page.
These are some images, I have captured.
Stations are shown by red dots
Euston, St. Pancras and Kings Cross Stations With HS2
The map clearly shows the three stations and the route of HS2 into Euston.
Note the following.
- HS2 clearly arrives at Euston on the western side of the station.
- The pedestrian route to St. Pancras could be more difficult than planners think.
- The station would appear to be extended towards Euston Road.
- Whilst the station is built, I suspect, that a good connection to the Metroipolitan/Circle can be created.
I think we’ll see some plans in the next few years, that make the connection between the three stations a lot better.
Old Oak Common Station
The map shows the myriad of lines in the area.
I believe that for many people using HS2 to and from London, will use this station, as its connectivity is so much more comprehensive than Euston.
Birmingham Interchange Station
Birmingham Curzon Street Station
Birmingham Moor Street and Birmingham New Street stations are to the south of the new station.
HS2 East Of Birmingham
This map clearly shows how trains for the North via Birmingham will go into Birmingham and then reverse direction in Birmingham Curzon Street station.
Handsacre And HS2
This map shows where HS2 joins the West Coast Main Line at Handsacre.
Conclusion
The interactive map is a real credit to modern computing.
Every project that could benefit should have one.
Will we be seeing one for Crossrail 2?
Government “not pursuing” HS1-HS2 Rail Link
This is the title of an article on Global Rail News.
The report entitled High Speed Two: East and West The next steps to Crewe and beyond considers it is just too difficult.
Section twelve of the report entitled Connecting to High Speed 1, goes into details.
They suggest an enhanced pedestrian link and say this for rail.
For rail, we considered a range of direct link options. It was, however, not possible to identify a viable rail option capable of meeting the strategic aspirations whilst successfully addressing stakeholder concerns. This was because the options were complex and expensive to construct and would have delivered infrequent, less attractive train services for HS2 passenger travelling to European destinations. As a result we do not intend to take forward proposals for a direct rail between HS2 and HS1 or include active or passive provision to support the construction of such a link in the future.
In my view, the only direct rail link possible, without demolishing half of Camden, would be a totally tunnelled double-tracked route from a few miles north of Euston to somewhere like Barking to connect with the Channel Tunnel Rail Link. It could also be used to get freight trains between the West Coast Main Line and the Channel Tunnel and the ports in the South East.
But it would have a cost of almost the level of the tunnels for Crossrail or Crossrail 2. Have we got a spare ten billion pounds?
The Pedestrian Link
From drawings of Euston station after HS2 is opened, it would appear that the HS2 platforms are on the western side of the station.
Does this make the pedestrian link difficult?
The Crossrail Alternative
When HS2 opens in2026, it will stop at Old Oak Common station, where it will interface with a myriad of lines including Crossrail.
Crossrail at present only goes as far as Abbey Wood, but the route is safeguarded to Gravesend. As I showed in Crossrail Extension To Gravesend, extending Crossrail to Ebbsfleet International station, would not be a multi-billion pound project.
As the HS2 station at Old Oak Common is not finalised yet, I do hope when it is, that it is simple interchange between HS2 and Crossrail.
With a simple interchange between Crossrail and HS1, the link between HS1 and HS2 via Crossrail would not be as simple as a direct link, but it could have other advantages, when you look at the using Crossrail as a preferred link.
Convenience For Passengers
If Crossrail served Ebbsfleet International, this would mean that passengers from many more places would have a direct or one-change link to Continental services.
But the biggest winners would be those wanting to go between Heathrow and the Continent. What the direct frequency would be between Heathrow and Ebbsfleet International would be up to the planners, but I can’t expect there would be less than four trains per hour
I live close to Dalston Junction and might prefer to use Crossrail from Whitechapel to Ebbsfleet, at certain times of the day, when my routes to St. Pancras are extremely busy!
I believe that Crossrail should go be exected to Ebbsfleet International as soon as is feasible!
St. Pancras Is Too Small
I believe that in a few years time, London to Paris and London to Brussels will be turn-up-and-go services.
Given too, that plans exist for direct services to Amsterdam/Rotterdam, Marseilles and Cologne, it strikes me that a four-platform St. Pancras station will be too small in perhaps ten years.
Also, what would happen if say easyRail or RyanRail wanted to run low-cost services to Europe, which is or will be allowed by European Union competition rules?
With Crossrail linked to Ebbsfleet International, where there is plenty of space for more platforms, it would be possible that services could terminate there and use Crossrail to and from Central London.
Customs And Immigration
Once Crossrail is a feasible route to Continental services and the travel statistics start to be reliable, it might be possible so sort out our archaic customs and immigration arrangements.
When I travel between say Brussels and Frankfurt, I just have to have a valid ticket, but how long before I need to show my passport and have my baggage scanned on a journey like this?
Incidentally, if you travel on some long-distance trains in Spain, your baggage is scanned.
I think that with all the problems of terrorism and illegal immigration, that cross-border trains within the Schengen area, will come under tighter security rules in the near future.
Will regulations like this mean, when I am travelling from say Cologne to London, that I would undergo the same checks as another passenger going from Cologne to Brussels?
I certainly hope so!
Modern Ticketing
Surely with e-passports and contactless bank cards, we should be able to do something a lot better than exists today.
Imagine turning up at any major station on either side of the Channel, where you can board a train for the other side.
You put your e-passport on the turn-up-and-go terminal, which checks you against the passport. You just indicate on a screen where you want to go, choose your train and, pay for it and then walk through to the waiting area.
If you have already bought your ticket, the terminal would recognise you and after checking the bar code on your ticket or your bank card, you would also be let through.
The only thing to do before boarding, who be the personal and baggage scan.
All the technology to create a ticketing system like this is available today.
On the other hand, I would hate to see a system that was so slow, that you had to spend an hour in a station before travelling.
Thoughts On The Camden HS1-HS2 Link
After writing the previous sections and reading this section on Wikipedia about the link, I had the following thoughts.
- Trains between the Continent and HS2 would not stop in Central London. This might cause logistical problems for groups of travellers.
- To call at St. Pancras, trains would need to reverse at St. Pancras. Would there be enough platforms?
- Would Customs and Immigration services have to be provided at every HS2 station?
I suspect others have had the same and other thoughts and have thus decided that a pedestrian route is the best way to change between Euston and St. Pancras.
Journey Times
I wouldn’t use Ebbsfleet if the total journey time was a lot longer.
The following assumptions and facts can be considered.
- Ticketing, boarding or disembarking at St. Pancras or Ebbsfleet shouldn’t take different times.
- From Eurostar’s timetable St. Pancras to Ebbsfleet takes twenty minutes.
- From Eurostar’s timetable St. Pancras to Paris by the fastest train takes two hours sixteen minutes.
- From Eurostar’s timetable Ebbsfleet to Paris by the fastest train takes two hours five minutes.
- From Crossrail’s predictions, Old Oak Common to Abbey Wood will take thirty two minutes.
- I estimate that Abbey Wood to Ebbsfleet International would take perhaps fifteen minutes.
- I estimate that Old Oak Common to |St. Pancras via a direct HS1-HS2 link would take perhaps fifteen minutes or a bit more, if the train had to reverse at St. Pancras.
This would give the following estimated times.
- Old Oak Common to Paris via St. Pancras would take two hours thirty-one minutes.
- Old Oak Common to Paris via Crossrail would take two hours fifty-two minutes.
So not building a direct link means that passengers using HS2 to get to Paris take another twenty-one minutes.
On the other hand, how many would book separate trains with a generous connection time and whilst crossing central London would have a relaxing meal?
Conclusion
I think that to save twenty-one minutes in a journey from HS2 to Paris, but completely rebuild the lines North of Euston and St. Pancras is a trade-off not worth making.
Fun At The Elephant And Castle
When I was driving, I used to find the Elephant and Castle roundabout confusing, especially as being a North Londoner, you don’t cross the Great Sewer unless you’re accompanied by a posse. (Make sure, they’re not Ipswich supporters, as they get lost at Liverpool Street!)
The Underground Station
In some ways Elephant and Castle tube station can be confusing and is almost two separate stations connected by long, dark tunnels under the roundabout.
- The Northern entrance is directly over the Bakerloo Line platforms
- The Southern entrance seems to give better access to the Northern Line platforms.
There are no escalators, but the Southern entrance is likely to be rebuilt. Wikipedia says this.
A major upgrade is being planned by Transport for London to bring improvements to the station; these include a new Northern line ticket hall, three new escalators and additional lifts to provide step-free access to the Northern line platforms. This will be done in conjunction with the major transformation in the Elephant & Castle area to create thousands of new homes and potential for new retail development to provide growth potential in the area.
That would be a great improvement.
The New Road Layout
Things look like they’re going to get a lot more fun for drivers at the Elephant and Castle judging by this traffic scheme that will start on Sunday.
This Tfl web page shows the scheme and this TfL map shows the final layout.
It’s even got its own web-site.
For comparison, this is a Google Map of the area before any roadworks.
Note.
- The drawing of the new scheme has North to the left.
- The Bakerloo Line entrance is on the North Side of the old roundabout, with the Northern Line entrance at the South
- A quick look could say that the road space will be wider, but shorter after reconstruction.
It could well be a lot easier for pedestrians like me!
December 3rd, 2015
These are pictures taken on Thursday the third.
The traffic seemed pretty dense even at ten in the morning.
December 5th, 2015
These pictures were taken about the same time on Sunday the 5th.
Note that I walked a similar route on the third.
The Pedestrian Routes Are Emerging
The main difference between the two sets of pictures, is that on the North, West and East sides of the roundabout, traffic is now two-bay with a traffic island between the two carriageways.
The South side is no longer used for traffic and will be pedestrianised early in 2016.
It is now possible to see how when the scheme is complete, that the centre of the old roundabout will be joined to the South Side. This will mean that to walk from the Northern Line station to the Bakerloo line station, will require only one road crossing at the North Side of the old roundabout.
I have some questions.
- Will the middle be landscaped? Obviously!
- Will there be a cafe in the middle? Hopefully?
- Will the preferred route to the Bakerloo Line trains from the surface, always be to enter the Bakerloo Line entrance and then descend in the lifts there, which take you directly to the platforms? It might be a shorter and more pleasant walk, than a long one in a tunnel!
After my visit today, I think I can see a purpose to the new design.
December 7th, 2015
This was the first working day at the same time as the previous sets of pictures.
I did see a picture, which showed a cafe and I think that if they can do the same at Old Street, which seems to be the next roundabout removal I’ll be pleased.
Although there is this article on the BBC, which is entitled Elephant and Castle: Two-way traffic redesign causes chaos. This is said.
The removal of the Elephant and Castle roundabout has been causing chaos for commuters, with motorists complaining of queues of more than an hour.
But then good news doesn’t draw viewers to the web site.
I’ll come back and watch this one in the future.