How Long Would An IPEMU Take From St. Leonard’s To St. Pancras International?
If an IPEMU is going to be used between St. Leonard’s and St. Pancras International station, there are two possibilities.
- A 110 mph IPEMU based on existing Class 387 trains.
- A 125 mph IPEMU based on a purpose-built Aventra. Ian Walmsley stated in the April 2016 Edition of Modern Railways that a 125 mph Aventra is possible.
This compares with the 143 mph and 100 mph speeds of a Class 395 train on high speed and classic lines respectively.
For this estimate, I will make the following assumptions.
- St. Leonards takes four minutes longer than Hastings.
- The baseline time from St. Pancras to Ashford is 38 minutes in a Class 395 train.
- Times on the high speed section are in proportion to the train speed.
- The baseline time from St. Leonard’s to Ashford is 46 minutes in a Class 171 train.
- All trains on the unelectrified section are limited to 100 mph.
Times From St.Leonards to Ashford
The Class 171 train takes 46 minutes, but it is only a benchmark, as few would go to Ashford and then get on a Class 395 train on High Speed 1.
The Class 395 train and the IPEMUs would be quicker as they would save a couple of minutes at each of the typical five stops, because of their faster acceleration.
Two minutes a stop would save ten minutes.
Times From Ashford to St. Pancras
Doing a simple calculation based on train speed gives the following times.
- Class 395 train – 38 minutes
- Class 387 IPEMU – 48 minutes
- Aventra IPEMU – 43 minutes.
Times from St. Leonards to St. Pancras
Adding the two times together gives.
- Class 395 train – 74 minutes
- Class 387 IPEMU – 84 minutes
- Aventra IPEMU – 79 minutes.
With Hastings it will be four minutes less.
In Wikipedia, there is a section called Future for the entry for the Marshlink Line. This is said.
The line is strategically important, as electrification and junction improvements would mean that High Speed 1 trains could travel directly from St Pancras International to Hastings. Amber Rudd, Member of Parliament for Hastings, has campaigned for electrification works to start by 2017. The aim is to reduce times to London from Hastings to 68 minutes, and from Rye to under an hour. This would require remodelling Ashford International station so the existing Marshlink line could connect to HS1, installing power systems, and adding a passing loop at Rye, all in addition to requiring new trains.
I think that the aim of 68 minutes from London to Hastings is a modest one, but as my crude estimate was only six minutes longer, I think the 68 minutes is totally attainable, especially as my times from St. Leonards to Ashford are just based on current timings and taking off a couple of minutes for each stop.
But if the Marshlink Line could be significantly improved, then time reductions of several minutes could well be achieved.
Along The Marshlink Line
After writing Will We See IPEMUS in Hastings?, I thought it would be a good idea to see, if there were any other reasons, why running longer IPEMUs on the Marshlink Line would be a good idea.
So I took a Class 395 train from St. Pancras International station to Ashford International station along High Speed One.
From Ashford International, I took the Marshlink Link to Hastings station, in one of the services run by Southern using Class 171 trains.
These are my observations from the trip.
Class 171 Trains
These are two-car modern diesel multiple units with a top speed of 160 kph and they can be coupled together to make longer trains.
They are totally adequate for the current service between Ashford International and Brighton via Hastings, Bexhill, Eastbourne and Lewes.
Class 387 Trains With An IPEMU Capability
I believe that if battery trains or IPEMUs are used to provide an electric service on the Marshlink Line, that only Class 387 trains can be delivered in a reasonable timescale.
- The Class 387 train is a cousin of the Class 379 train, which was used to create the demonstrator.
- The Class 387 train is a four-car 175 kph train, that can be run in 4, 8 or 12 car formations.
- The capability of the train on battery power, would be more than adequate to go between Ashford International and Hastings.
- There are over twenty Class 387 trains in service, that will start to be replaced this year with new Class 700 trains.
- Another twenty trains are on order for Porterbrook.
- Because of the late delivery of the Great Western electrification, quite a few trains have no home to go to.
- Southern are very familiar with Class 387 trains.
The main thing that would need to be done, would be to add an appropriate battery pack to the number of trains needed for a Brighton to Ashford or St. Pancras service.
As a battery pack was designed over a year ago, I’m sure Bombardier have this under control.
This article in Rail Technology Magazine, talks about how Bombardier are doing extensive tests on battery systems in Mannheim.
Ashford International Station
This Google Map shows the various lines through Ashford International station.
Note.
- High Speed One goes through the station calling at the long island platforms 3 and 4, or on the flyover, as appropriate.
- The Ashford to Ramsgate Line goes off to the North East.
- The Marshlink Line goes south alongside the white teardrop, which is the Ashford Designer Outlet.
There are three alternatives for Marshlink Line trains.
- Currently, trains from the Marshlink Line terminate in Platform 1. This could continue.
- Trains could go to and from London on High Speed 1
- Trains could go to and from London on classic lines.
I suppose there could be a mixture of all three.
I don’t know if it is possible to run trains between High Speed One and the Marshlink Line, but I can’t believe that it would be impossible to arrange, as Network Rail have mentioned Hastings to St. Pancras services via High Speed One in some of their reports.
Ham Street Station
Ham Street station is a simple affair on a double-track section, with two staggered platforms.
I took these pictures of the station.
This is a Google Map of the station.
it would appear that quite a few houses have been built recently.
The station doesn’t appear to be of the same quality as the houses.
Appledore Station
This Google Map shows the Appledore station.
It is simple affair, with very few houses locally.
- Appledore itself is two miles away.
- It has two staggered platforms.
- There is a level crossing.
- There is no footbridge.
South of the station the line becomes single-track and the Dungeness Branch goes off to Dungeness and Lydd.
Dungeness
A proportion of the freight traffic on the Marshlink Line serves the Dungeness Nuclear Power Station using the Dungeness Branch.
The Google Map shows the area of Dungeness.
At one time, the line had several stations including one at Dungeness.
Other than the power station, there is just a few houses, Lydd Airport, a nature reserve and a few tourist attractions like the iconic Romney Hythe and Dymchurch Railway.
The only other things that could effect the area, is a possible building of Dungeness C Nuclear Power Station and other energy related developments, like a cross-Channel energy link or support for wind turbines.
So to say that the Dungeness Branch will never be developed with a passenger train service, is a bit like saying human beings will never set foot on Mars.
I’ve never been down to Dungeness, although C flew to Beauvais near Paris in the 1960s from the Airport using an airline called Skyways (?).
Rye Station
Rye station is the only substantial station on the unelectrified part of the Marshlink Line.
This Google Map shows the station.
I visited Rye in 2015 and wrote Lunch At Rye, where I found it a charming little town, lacking in information.
The station has a passing loop, a footbridge and a booking office, and it probably would need little work for longer trains.
However, there was evidence of general tidying up and the relaying of track.
In fact, this was virtually the only work, that I saw anywhere on the Marshlink Line.
Winchelsea, Doleham And Three Oaks Stations.
Of these three stations, we only stopped at Winchelsea station.
Except for well-maintained single platform, there is not much there.
Doleham and Three Oaks stations are also fairly basic, with Three Oaks only able to handle a single carriage.
From Ore To Hastings
Ore station is the next station after Three Oaks and it is fully electrified from the station all the way to Eastbourne and Brighton.
An Article In Rye News
This article in Rye News is entitled More give than take on Marshlink, was written by Stuart Harland who is chairman of the Marsh Link Action Group.
It gives a summary of the work needed to allow Class 395 trains to Bexhill.
As we know from the Network Rail presentation to MLAG last year, the physical issues to be resolved are:
- electrification of the Marshlink line
- signalling at Bexhill;
- remodelling of the track layout at Ashford;
- the dualling/ passing loop at Rye
- the two level crossings at East Guldeford where input is awaited from the Highways Agency to remove the need for two level crossings on the A259
All of this needs funding, as do the additional Javelin units built by Hitachi.
So how does using Class 387 trains with an IPEMU capability affect this list.
- Electrification of the Marshlink Line would not be needed.
- The signalling at Bexhill, can already handle eight-car Electrostars, like the Class 387 train, so I would assume modifications would be simpler, if at all.
- The remodelling of the track layout at Ashford would only need to connect Platforms 1 and 2 to High Speed One.
- The passing loop at Rye seems capable of accepting two four-car Class 171 Turbostar trains, which are closely related to Class 387 Electrostar trains.
- The level crossing problems would remain, but the speeds could be kept to those used now.
- New trains would not need to be purchased from Hitachi.
In addition, there would need to be work done to make sure that all stations and signalling on the Marshlink Line could accept the length of train, that Southern want to run between |St. Pancras and Hastings.
Conclusion
Class 387 IPEMUs could easily provide service on the Marshlink Line and the cost of the work would be very much reduced compared to using Class 395 Javelin trains, with the biggest expense probably being adding the battery packs to the Class 387 trains.
Will We See IPEMUs In Hastings?
I have just been pointed to this article in the Hastings Observer, which is entitled Hybrid trains alternative to electrifying 1066 country railway. This is said.
Battery-powered high-speed trains were proclaimed as the way to decrease rail journey times in 1066 country at a transport summit today (Friday, March 18).
Hybrid Javelin trains would eliminate the need to electrify the Marshlink but still reduce the time it takes to get to London, according to transport representatives at Sussex Coast College.
Network Rail’s senior strategic planner in the south east Paul Best explained how they are proposing an ‘incremental approach’ to electrifying the railway between Ashford and Bexhill.
He said they can increase speed limits in certain places but also look into using hybrid trains with a battery so they can be used on the normal track and electric line from St Pancras to Ashford, which would reduce journey times
So let’s look at this statement in detail. Note that I use Independently-Powered Electric Multiple Unit or IPEMU instead of battery trains.
I think it will be unlikely, that if this comes to pass, that the trains will be Class 395 trains, colloquially known as Javelins.
- I don’t think Hitachi could deliver their made-in-Japan product for some time due to busy production schedules.
- Hitachi have not disclosed any plans for a battery variant of a Class 395 train.
- Paul Best of Network Rail isn’t reported as mentioning Javelins.
Hitachi may be able to deliver such a train in the future and I may be wrong about their capabilities.
I think if we see Paul Best’s hybrid trains working between St. Pancras and 1066 country, then there is only one proven train; an IPEMU or battery-powered version of the Class 387 train.
- Soon, there could be several of the trains sitting in sidings or being built at Bombardier’s factory in Derby.
- All or most of the Class 387 trains are owned by Porterbrook. Leasing companies are not charities and like their assets to sweat.
- Bombardier and Network Rail demonstrated the IPEMU technology in public service over twelve months ago.
- Class 387/2 trains destined for Gatwick Express have been extensively tested on the West Coast Main Line. Has their 200 kph capability been explored?
- Southern, who have lots of experience of running Class 387 trains, are responsible for the services between Hastings and Ashford International.
- Adding the required signalling and certifying the Class 387 trains for HS1, shouldn’t be a difficult problem.
- Jumping the electrification gap of the Marshlink Line, is well within the capability of a Class 387 train with an IPEMU capability.
The only problem I can see, is that they are only a 110 mph train as opposed to the 140 mph of the Class 395 train, when that train runs on HS1. So would this cause route planning problems? But then the line can accommodate slower freight trains.
But I did say the following in Will Southern Create A South Coast Express Using IPEMUs?, about an electrified service on the Marshlink Line.
Using IPEMU trains would simplify the job and mean no electrification would be needed.
It would appear that Network Rail are thinking along similar lines.
The High Speed Battery Train
Are Bombardier creating a genuine high speed train with a 200 kph capability and the ability to run for at least fifty miles on battery power.
- Bombardier certainly have the experience to build a 200 kph train for the UK, in that both Class 221 trains and Class 222 trains were built by Bombardier.
- If they had to settle for the 175 kph of the current Class 387 train, that wouldn’t be too serious a problem. Especially, if they could squeeze the extra 25 kph in a few years, with an upgrade.
- Class 387 trains have been running on Thameslink since December 2014.
- A lot of technology like LED lights, regenerative braking, efficient air-conditioning and automatic train control systems are available to make trains use less electricity.
- The battery technology has been reported as going through extensive testing in Mannheim.
Without doubt Bombardier can produce a 175 kph (110 mph) train based on the Class 387 train and they could be able to stretch that to a 200 kph (125 mph) one!
That would be some train!
The IPEMU Market
If they can produce a high speed train with an onboard energy storage, it is not a speculative product without a market.
In addition to the Marshlink Line, all of these lines have a proportion of running at around 160 kph or over and then an extension, that is not electrified.
- Liverpool Street to Lowestoft – This route is in the new Greater Anglia franchise.
- Liverpool Street to Yarmouth via Cambridge, Ely and Norwich.
- Liverpool Street to Peterborough via Cambridge.
- Ipswich to Cambridge, Ely and Peterborough.
- Kings Cross to Grimsby, Hull and Lincoln.
- Kings Cross to Hartlepool, Middlesbrough and Sunderland.
- Liverpool to Newcastle and Edinburgh via Manchester, Huddersfield and Leeds.
- Liverpool to Hull via Warrington, Manchester, Sheffield and Doncaster.
- Blackpool to Leeds via Preston and the Calder Valley Line.
- St. Pancras to Corby and Leicester
- Euston to Barrow, Blackpool, Chester, Huddersfield and Shrewsbury
- Paddington to Bedwyn, Henley, Marlowe, Newbury, Oxford and Windsor
In addition, there are some routes , which could be served, with some short stretches of electrification or a means of charging the train at the terminus.
- Waterloo to Exeter via Salisbury.
- York to Scarborough
- Edinburgh to Tweedbank
- Settle to Carlisle
- Carlisle to Newcastle.
And then there’s all the branch lines!
Conclusion
Could we be witnessing a rail revolution powered by batteries?
I certainly think we are and have thought so for some time.
Who’ve have thought that Network Rail would spill the beans in Hastings about a rather charming line across the Romney Marsh?
Improving The Hastings Line
In The Lewes Horeseshoe, I discussed how an idea from Railfuture might be used to improve services between London and the South Coast.
I came to the conclusion, that if various improvements were carried out, including the running of trains with Class 395 performance from Ashford to Brighton along the East Coastway Line, that this would present an opportunity to close and rebuild the Hastings Line.
The Hastings Line is only thirty-two miles long from the South Eastern Main Line to Hastings, but there are deficiencies in the tunnels, which led to four of the eight tunnels being made single-track, when the line was electrified in 1986.
Surely, the fact that the line is constantly switching from double to single track, is one of the reasons, that the line only has a pathetic one semi-fast and one stopping train per hour between London and Hastings.
But things have moved on since 1986!
Network Rail must have learned a lot of tricks with tunnels. In particular, all the lessons learned in the re-boring of Farnworth Tunnel will be invaluable.
The length of the line is also such, that services could be run using IPEMU trains, charging the on-board storage on the South Eastern Main Line and between Battle and Hastings stations.
Would running some parts of the Hastings Line without power, mean that it could be simplified by the partial removal of electrification?
I estimate that around twenty-five miles would be without electrification, which would be an easy gap to bridge for an IPEMU.
Would this simplification in the various single-track tunnels, coupled with modern tunnelling techniques, allow Network Rail to create a fully double-tracked route from the South Eastern Main Line along the full length of the Hastings Line to Hastings?
If four trains per hour could be run between London and Hastings, that would be a tremendous improvement. At the London end of the route, the Thameslink Programme should create extra capacity for trains into Charing Cross station.
In addition, it would appear that the line is already capable of handling ten-car trains. Could this be stretched to twelve?
I am certain, that in the light of developments in the last few years, that Network Rail are looking at ways of increasing the capacity on the Hastings Line.
They’re also probably looking to do other engineering work, as there was a major landslip on the line a couple of years ago.
But in truth nothing can be done, until alternative routes are provided via Ashford and/or Brighton, as the tunnel work would probably mean that the Hastings Line would need to be closed, whilst some of the work is performed.
Unless a sensible alternative is provided, I’m sure Disgusted of Tunbridge Wells will be penning another letter to the Telegraph.
The Lewes Horeshoe
A friend pointed me at the Lewes Horeshoe, which is described on this page of the Railfuture web site. They say this.
Events last year at Dawlish have shown the need for alternative routes to provide network resilience. A simple loop at Lewes, following the A27 Lewes bypass and the Cockshut, could be completed in Control Period 6 (or sooner) to provide an alternative route between Brighton and Haywards Heath without reversing, which would have enabled a service to be maintained when Patcham Tunnel was flooded recently, and would enable direct services between Falmer and London. It would also avoid reversing of the Lewes – Brighton shuttle service at Lewes, which might improve stock utilisation, and would facilitate services via a reopened Uckfield – Lewes line to Brighton. The radius of curvature is similar to that of the new curve on the East London Line Extension at Shoreditch, which operates without disturbing local residents.
They also show this map of the horseshoe.
This is a Google Map of the area.
And for completeness, this is a Google Map of the East London Line at Shoreditch.
Knowing the East London Line well, I don’t think that the curve at Shoreditch is particularly tight and certainly thousands of up to five car trains have gone round the curve in safety without annoying too many of the residents. But are there that many residents?
So what do I think of the idea of the Lewes Horeshoe?
I believe that smaller rail projects like the Hitchin Flyover, Ipswich Chord, Ordsall Chord and Todmorden Curve, may not seem to offer high value before they are proposed, but once they are created, rail companies and politicians find innovative ways to use them.
I don’t know Lewes station well, but I always seem to spend some time there waiting for trains, when I visit.And would thus say that the area needs a bit of sorting out.
Now that the Uckfield Branch of the Oxted Line has been improved, as I wrote about in Future-Proofing The Uckfield Branch, I think that there could be moves to reinstate the Wealden Line and improve Seaford Branch services to Newhaven and Seaford.
Obviously, if there is any work at Lewes to sort out the services, all proposals should be examined.
There is also all of the proposals for a Second Brighton Main Line. I think that this project is so large, that I don’t think those using the trains between London and Sussex could put up with another project the size of Thameslink in the near future.
I also think, that several smaller projects along the current routes between London and Sussex should be sorted first.
- Improved longer and more frequent electric services from London to Uckfield.
- Improved longer and more frequent electric services along the West Coastway and East Coastway Lines.
- Improved links between Southeastern Highspeed services and Crossrail at Stratford International.
- The development of East Sussex services, so passengers can use Southeastern Highspeed services into Stratford and St. Pancras.
- The completion of the new interchange station at Gatwick Airport to improve connectivity.
- The sorting of the interchange between Thameslink and the East London Line.
- Improved services on the Hastings Line.
- A New one million pound car park has been built at Uckfield. Expect to see more!
- Improved layouts and extra tracks on the current Brighton Main Line.
I think that we’ll see some truly radical ideas and services implemented between London and Sussex, taking advantage of some of the new technology that is currently being developed.
For instance, if the East Coastway Line and the related Marshlink Line were to be improved, I feel that a limited stop Class 395 train could run from Stratford International to Brighton in under two hours.
I also believe that if the order of the projects is organised in an optimal order after Thameslink is completed through Gatwick to Brighton, that the important capacity between London and the South Coast can be maintained. This could be one possible order.
- Finish Thameslink, Gatwick Airport station and some Brighton Main Line improvements.
- Run twelve-car services between London and Uckfield.
- Improve the East Coastway and Marshlink Lines, so that trains with Class 395 performance can run between Brighton and Ashford.
- Add some more parking.
Finally, the bullet must be bitten and the Hastings Line can be closed and rebuilt, so that four trains per hour can be run between London and Hastings.
I discuss this in Improving The Hastings Line.
Will Southern Create A South Coast Express Using IPEMUs?
This post is pure speculation on my part,which I’ve written to illustrate the capabilities of an IPEMU.
What is an IPEMU?
Many rail passengers in the UK, have ridden in one of Bombardier’s fairly ubiquitous Electrostar trains. Here’s a short list of some of the types and the services they run.
- Class 357 trains run services out of Fenchurch Street for c2c.
- Class 375, Class 376 and Class 377 trains running commuter services to the South of London.
- Class 378 trains running on the London Overground.
- Class 379 trains running from Liverpool Street to Stansted Airport and Cambridge.
- Class 387 trains currently running on Thameslink, but perhaps soon on a line near you.
A Class 379 was used to create the IPEMU or Independently Powered Electric Multiple Unit and a year ago, I rode this train in public service between Manningtree and Harwich.
A battery pack had been added to the four-car train, which was charged up, when the train is running on an electrified line; third rail or overhead and the energy can then be used to propel the train on a line without electrification.
I was told by the engineer sitting opposite me,monitoring train performance on a laptop, that this Class 379 IPEMU had the following characteristics.
- A range of upwards of sixty miles on battery power.
- Similar performance on battery or direct power.
- Virtually identical driving experience.
I would also add that the passenger experience was virtually identical.
Network Rail and Bombardier have put a lot of time, effort and money into the IPEMU. They believe, that IPEMUs and their battery power will have the following applications.
- Providing affordable electric services on branch lines or other lines that are difficult to electrify.
- Moving trains around in depots and sidings that have not been electrified.
- Train recovery and diversion, when the power fails.
- Used in conjunction with regenerative braking, IPEMU technology saves electricity.
Obviously, Bombardier very much believe in the technology, as their new train; the Aventra has been designed to use energy storage.
IPEMU is an acronym, that will increasingly be used with trains.
The Class 387 Train
Southern, who operate a lot of services south of London are users of Class 387 trains.
- 29 x Class 387/1 trains running on Thameslink
- 27 x Class 387/2 trains ordered for Gatwick Express.
The Class 387/1 trains will be replaced by Class 700 trains, as they arrive from Germany.
Unfortunately, due to the well-documented problems of Network Rail’s electrification, it looks like a lot of these twenty-nine trains could be put into storage.
I believe that some of these trains will be given an IPEMU capability to be used to provide electric train services on certain lines.
As they are closely related to the Class 379 train used for the prototype, I feel that most of the technical problems have been solved.
Along The South Coast From Southampton to Ashford
The South Coast from Southampton to Ashford is covered by two separate rail routes.
- The East Coastway Line that runs between Brighton and Ashford International stations is only partially electrified and uses two-car diesel Class 171 trains.
- The West Coastway Line that runs between Brighton and Southampton Central stations is fully electrified and uses elderly three-car Class 313 trains, which have a top speed of 75 mph.
If you want to travel between say Hastings and Worthing, you will have to change trains at Brighton.
This usually means a wait of a few minutes and a change of platform.
Any sane person would believe that if a single train could run all the way from Southampton to Ashford, this would be better for many reasons.
- The train company would probably need less trains.
- Passengers wouldn’t have to change trains at Brighton.
- There could probably be a simpler interchange between Coastway and Brighton Main Line services at Brighton station, which might release platform space.
- Both Coastway routes are limited to speeds below 80 mph and are fairly straight, so perhaps with some improvements, faster services could be introduced.
Until recently, the only trains capable of going from Ashford to Southampton would have been diesel multiple units, but as the only part of the route that is not electrified is the Marshlink Line from Ore to Ashford, it would now be possible to run the service using an IPEMU variant of a Class 387 train. The train would charge its on-board batteries between Southampton and Ore and at Ashford and then use battery power to bridge the gap of about thirty miles on the Marshlink Line.
As IPEMUs have a range of sixty miles, then it would seem that there should be few problems in running the trains between Ashford and Ore.
This approach has benefits.
- The Class 387 train is an 110 mph electric train with regenerative braking, so services could be faster.
- GTR has quite a few of the standard Class 387 trains in service, so the company and their drivers probably know them well.
- GTR could say they have removed a number of diesel trains and they are a greener company.
- Network Rail would only have to update the track and signalling of the Marshlink Line for four-car trains and wouldn’t need to electrify any of the route.
Currently, to go from Ashford to Southampton takes three hours forty-five minutes and it is quicker to go via St. Pancras and Waterloo. But with a 110 mph train and no changes, timings must be possible in the region of three hours.
I suspect that with some selected track improvements, a limited-stop service could be a real South Coast Express.
There certainly is some scope and I’ll detail each improvements on the main East and West Coastways separately,
The Marshlink Line
The Marshlink Line is not fully double-tracked, has several level crossings and a low speed limit, which if improved, would probably be welcomed.
The Marshlink Line Action Group web site has an extensive report about improving the line, of which this is an extract, from a report which discusses extending the Class 395 train service from Ashford to Hastings.
The basics of the project are substantially as presented last year with line speeds generally expected to be 60-90 mph from Ashford to Doleham and 40-60 mph onwards to Hastings. But the ongoing big question for NR (and of concern to MLAG from an environmental point of view and compatibility with rolling stock in the surrounding lines) is whether the power source would be third rail (as MLAG would prefer) or overhead. NR acknowledges the difficulty of overhead power along the Marsh with gantries having to be built on (obviously) marsh land and with the strong winds. Whichever, some 30 miles of track would need to be laid but, apparently, only about half a mile of dualled track to the west of Rye.
Incidentally, there has been talk about running Class 395 trains from St. Pancras to Eastbourne via HS1 to Ashford and the Marshlink Line. It would undoubtedly be a fast service, but it has some inherent disadvatages.
- The Marshlink Line would need to be electrified, probably with 25KVAC overhead wires.
- Some people might object to the wires across the marshes?
- Would it need some extra Class 395 trains to be purchased?
- Would it mean that one franchise was encroaching on the territory of another?
On the other hand, using IPEMU trains would simplify the job and mean no electrification would be needed.
However, it would probably be a good idea to make sure that as much dualled track was created, to maintain an efficient service on the line in the future.
The Willingdon Chord And Eastbourne
There has been talk about reinstating the Willingdon Chord, which could shorten the line by making it possible for trains to by-pass Eastbourne, But the locals fear, that Eastbourne would lose services.
However, surely some fast long-distance services along the South Coast could by-pass the town.
A skilled compiler of timetables could probable devise one for Eastbourne, that gave the town, faster and better services to Brighton, Southampton and London.
Lewes And The Wealden Line
It is an aspiration of many to reinstate the Wealden Line, as a new route to London to take pressure off the Brighton Main Line.
In Musical Trains In Sussex, I gave my reasons for believing that the Uckfield Branch could be run using Class 387 IPEMUs.
I also believe that if the Wealden Line is reinsatated that it will use the same type of train.
Obviously, Network Rail and Southern, will make sure that the Wealden Line project doesn’t conflict with a desire to run fast trains along the South Coast.
Hove Station
Hove station is a busy one with up to eight services an hour passing through in both directions, to and from Victoria and Gatwick Airport as well as Brighton.
There were aspirations that in the future to add the London Bridge to Littlehampton via Hove service to Thameslink. The service would use the Cliftonville Curve to access the Brighton Main Line, as it does now.
This would give all stations on the West Coastway Line between Hove and Littlehampton, two trains per hour through to London Bridge and beyond
Except for the Future Developments section in the Wikipedia entry for Hove station, I can’t find any more about this proposal.
The Arundel Chord
One piece of infrastructural that gets mentioned is a chord at Arundel that would connect the West Coastway Line to the Arun Valley Line between Angmering and Ford stations.
If it were to be built, it would create another route between Brighton and Three Bridges using the eastern part of the West Coastway and the Arun Valley Line.
Westward From Littlehampton
My only experience of the western end of the West Coastway line, was missing a train and having to wait an hour on a freezing and deserted Bosham station for the next train.
The service could probably benefit from a rethink.
Brighton
Brighton is the major interchange between the two Coastway services and the Brighton Main Line with its Gatwick Express, Victoria and Thameslink services.
Brighton station certainly needs improvement to cope with the large increase in capacity to the city, that Thameslink and its new Class 700 trains will bring.
Each twelve-car Class 700 train, will have a capacity approaching 1,800 passengers and there will be four of these trains to and from Central London and beyond every hour.
Obviously, the trains won’t be full at Brightpon and not all passengers will be walking to and from the station, so there needs to be better connections to buses and the two Coastway Lines.
At present, it takes a few minutes and a platform change to pass through Brighton if you’re going between services at the station.
- Brighton Main Line, Gatwick Express and Thameslink services.
- East Coastway services
- West Coastway services.
- Great Western Railway services to the West.
The platform layout at Brighton doesn’t look as if it was designed to make train services for passengers and train companies efficient.
So surely, if Coastway services could be linked, so that they came into the station, set down and picked up passengers before going out in the other direction, this would be a more efficient way to organise trains at the station.
It would also make the interchange between Coastway and Brighton Main Line services easier and hopefully, just a walk across a platform.
A reorganised Brighton could probably contribute several minutes to the savings in journey times along the Coastway.
This Google Map shows Brighton station and the two Coastway Lines coming into the station.
I don’t think it would be an affordable or even a sensible solution, to combine the two Coastways together north of Brighton station.
The Wivelsfield Alternative
But Network Rail have come up with an alternative solution, so that the two Coastways can be connected together.
Just sixteen kilometres north of Brighton is Wivelsfield station. It is possible to access the East Coastway Line just south of the station at Keymer Junction, which unfortunately is not grade-separated and probably needs to be to improve Eastbourne services from Victoria.
Wikipedia has a section on the future of Wivelsfield station, which says this.
In Autumn 2015 Network Rail released the Sussex Area Route Study, where two options for the proposed grade separation of Keymer Junction are detailed, both of which would transform the station dramatically. Option 1 is the minimal option and creates a new platform 0 on the west side of the station served by a 3rd track from the new flyover line from Lewes. Option 2 is much more ambitious and builds on option 1 by adding an additional 4th platform on the east side of the station as well, served by a 4th track on the line to Lewes. Whilst this would enable each line to the south to have a dedicated platform the primary benefit would be that the existing platforms could be used to turn back trains in either direction as needed without blocking the main lines.
As services can access the West Coastway Line through the Cliftonville Tunnel to Hove, which is a couple of miles north of Brighton station, it would appear that the two Coastways could be connected, with a reverse at Wivelsfield.
The route would be.
- Lewes
- Cooksbridge
- Plumpton
- Wivelsfield
- Burgess Hill
- Preston Park
- Hove
This is not a complete solution, as there would have to be a way to get to Brighton station, by probably changing at Lewes, Wivelsfield or Hove.
A Brighton Metro
In a trip to Brighton, I travelled to Seaford using the East Coastway and the Seaford Branch. Even on a Sunday morning in February, the three-car Class 313 train was pretty full, especially around the University of Sussex at Falmer station.
So could the half-hourly Brighton-Seaford service be extended to the west of the City to perhaps Hove, Littlehampton or even Bognor Regis?
It would surely generate its own traffic across the city, which could help to reduce Brighton’s bad traffic jams. Stations could be.
- Hove
- Brighton
- London Road (Brighton)
- Moulsecoomb
- Falmer
- Lewes
- Southease
- Newhaven Town
- Newhaven Harbour
- Bishopstone
- Seaford
I think if you can sort out Brighton station or create the Wivelsfield alternative, you could run a four trains per hour stopping service across the city for as far as you want.
Perhaps the slower stopping trains would go via Brighton and the semi-fast services would go via Wivelsfield.
It’s a problem, that I suspect Network Rail have thought through fully!
Train Movements At Brighton
The only problem would be that the combined Coastway Line would need to cross the throat of the station, probably in a flat junction.
Say the Joint Coastway Line had the following services at Brighton.
- 2-4 trains per hour between Seaford and Littlehampton/Bognor, that would stop at all stations including Brighton.
- 2-4 trains per hour between Ashford International and Portsmouth Harbour and/or Southampton Central, that would stop at major stations only.
These would come into a platform or platforms on the Eastern side of the station, which would mean any train going to or coming from the West Coastway, would have to cross the Brighton Main Line to London.
The services to and from London after Thameslink is fully opened could be.
- 3 trains per hour to Victoria.
- 4 trains per hour on Thameslink
I’m no signalling expert, but I do feel that much more onerous train movements are coped with in stations like Manchester Piccadilly, Paddington and Waterloo.
Note the four trains per hour frequency on Thameslink (two from Cambridge and two from Bedford) Surely, if Coastway services are four trains per hour, then all services should have a pattern, so journeys like Seaford to Cambridge, involved just a walk across a platform at Brighton.
I’m sure some clever train scheduler can come up with an optimal pattern of changing trains at Brighton, especially if some trains used the alternative route via Wivelsfield.
But my feeling is that as Brighton is such an important station, that all Coastway services must either terminate or stop in the station.
At least there does not appear to be significant freight running on the Coastways.
Capacity At Brighton Station
The Thameslink Program and its Class 700 trains, will probably increase passengers through Brighton station.
Knowing the quality of Network Rail’s passenger transport modelling, I would not bet against Thameslink being so successful between London and Brighton, that additional services have to be added.
As the Thameslink trains will be new and they serve lots of destinations in London and beyond, I think it is a given, that passengers from places like Eastbourne and Worthing, might use Thameslink instead of their local direct route, changing at either Brighton or Gatwick Airport.
Conclusions
Improvement of the Coastways, is just one part of an evolving plan for rail and air services in Kent, Surrey and Sussex.
As there are important lines in the area that are not electrified, I’m certain that IPEMUs will play a part in this development.
After all, the technology works and we will soon have lots of Class 387 trains sitting in sidings.
Rumours Of Battery Powered Trains
In the September edition of Modern Railways, there is an article entitled Class 387s Could Be Battery Powered.
The Class 387 train is an electric train, where the first twenty-nine members of the class are running on Thameslink between Bedford and Brighton. Built in Derby by Bombardier, they are possibly the last variant of the numerous Electrostar family. When the new Thameslink Class 700 trains are delivered, these units will be transferred to First Great Western to run services out of Paddington on the electrified Great Western Main Line.
At present Bombardier are building twenty-seven new Class 387 trains to run the Gatwick Express out of Victoria.
When this order is complete, they will build another eight units for services out of Paddington, for delivery in late 2016.
It is these eight trains that are rumoured to be capable of battery running, using technology I saw demonstrated and talked about in Is The Battery Electric Multiple Unit (BEMU) A Big Innovation In Train Design?
If you still think these trains aren’t practical, there is a BBC video on YouTube of the Class 379 IPEMU during its tests at Manningtree.
In their article, Modern Railways says the following.
Delivery as IPEMUs would allow EMUs to make use of as much wiring as is available (and batteries beyond) while electrification pushes ahead under the delayed scheme, and in the longer term would allow units to run on sections not yet authorised for electrification, such as Newbury to Bedwyn. The use of IPEMUs might also hasten the cascade of Class 16x units to the west of the franchise.
Note that these trains are now called IPEMUs or independently powered electric multiple units.
It looks to me, like the rolling stock engineers at Bombardier in Derby are getting their fellow engineers in electrification out of trouble.
Having a small number of IPEMUs could be very useful to train companies, as they could be used tactically to perhaps extend electric services, when the wires are being installed or onto a scenic branch line, where putting up overhead wires would be strongly opposed. They could also be used for blockade busting, say when a tunnel or bridge is being rebuilt.
It would be interesting to see the cost difference between a standard Class 387 and one with batteries, as this would determine, whether to electrify say a branch or use IPEMUs.
Other Places For An IPEMU
Also in Modern Railways are three articles, where an IPEMU could be the solution.
- Hull Trains are reported looking for a bi-mode fleet to run their Hull services, as they would bridge the unelectrified seventy miles of line between Selby and Hull. A Class 387 IPEMU probably doesn’t have enough performance, but it might be capable of running the route.
- Services to Blackpool have also been approved, which if the electrification is not ready in time, is a route that could be handled by a Class 387 IPEMU.
- Roger Ford is also talking about Open Access Hotting Up. Some of the routes would be ideal for a Class 387 IPEMU, as lots of places without a decent service to London, Birmingham, Manchester, Glasgow or other large cities, are thirty or so miles off a main electrified line. Places like Yarmouth, Lowestoft, Sudbury, Cromer, Lincoln, Skrgness, Wisbech, Windermere, Chester and Burnley come to mind.
I also think, that as the years pass, IPEMU technology will get better and much more efficient with a longer range when running on the batteries. Drivers will also learn how to coax the maximum range out of the trains.
This could enable services like.
- London to Norwich via Cambridge
- London to Salisbury
- Ipswich to Cambridge and Peterborough
- Manchester to Sheffield
- Newcastle to Carlisle
In my list, there would seem to be a large number of routes in East Anglia. But then Anglia Greater Anglia were part of the trials of the test train.
Visual Intrusion Of Electrification
I think too, we shouldn’t underestimate the lack of visual intrusion if say a picturesque branch line was to be served by an IPEMU rather than by a traditional electric train. The Windermere branch and some lines in South Wales may well be better served by a more visually acceptable IPEMU.
Affordable Electrification
I have listed that these IPEMU trains would be able to run between Carlisle to Newcastle.
I don’t know the Tyne Valley Line well, but it is about sixty miles long and has electrified lines at both ends. Traditional electrification may require a lot of bridge and station reconstruction to accommodate the overhead wires, whereas a Class 379 IPEMU could use the line without any modifications to infrastructure, as it can use any line that the current Class 156 trains on the line can. There would of course be a need to make sure that at both ends of the line, there was sufficient electrification to fully charge the train for its return journey.
So the cost of replacing diesel trains on this line with modern electric ones, would be solely the cost of the new trains, and perhaps the cost of a small amount of electrification in the stations and the stabling sidings at each end of the line.
In this case, I suspect Network Rail would breathe a big sigh of relief, if they didn’t have to electrify this line, with all its logistical and possibly environmental problems.
How many lines in the UK, could be electrified this way?
Route Proving For Electrification
The lines in East Anglia from Felixstowe and Ipswich to Cambridge and Peterborough are not electrified.
They carry a large amount of freight to and from the Port of Felixstowe, so if they were to be electrified the benefits of replacing Noisy and polluting diesel locomotives with environmentally-friendly electric ones is probably easily calculated.
But how do you calculate what will happen when two and three car diesel multiple units, albeit modern Class 170 trains, with new four-car electric ones?
In the case of these East Anglian lines, you could run a Class 379 IPEMU on the line.
The only problem after the test was completed, would the passengers allow their brand-new ekectric train to be moved elsewhere.
But you would get an accurate figure to put in your costings for electrification.
Electro-Diesel Freight Locomotives
Nobody except possibly the operators, love the Class 66 locomotive, which is extensively used for freight in the UK. It doesn’t meet the latest EU regulations and it’s noisy and unloved by the drivers to whom I’ve spoken.
Electrifying freight routes like Felixstowe to Nuneaton, would allow operators to send freight trains between Felixstowe and the Midlands, North and Scotland, using electric haulage all the way.
Next year, we’ll see the first of the new electro-diesel locomotives; the Class 88, which is an electric locomotive, that can use an on-board diesel engine, where there are no overhead wires.
How will these and other locomotives using similar technology affect the costs and need for electrification?
In the case of any electrified route to a port like Felixstowe or London Gateway, overhead wires in the port can present a problem, which an electro-diesel locomotive solves, as it uses the on-board diesel, anywhere near the sidings in the port.
Class 800 Trains
The Class 800 train being introduced in a few years is an electro-diesel train, which has been designed to run at 200 kph to the farthest corners or the UK, as a replacement for the diesel InterCity 125.
The specification of the train and what they’ve seen so far of the prototype must have impressed First Great Western as they’ve ordered extra trains as Wikipedia reports.
In March 2015 First Great Western agreed to acquire 29 bi-mode Hitachi AT300 (Class 800 variant) trains as HST replacements on services in and to the southwest of England. The order consisted of 22 five-car and 7 nine-car trainsets, with an option for 30 more sets. Differences with the original design included more powerful diesel engines more suited to steeper graded line in Devon and Cornwall, as well as larger fuel tanks. A £361 million contract between FGW and rolling stock leasing company Eversholt Rail was signed in July 2015. The expected introduction date of the new trains was summer 2018.
So where else could these trains appear to provide high speed services on routes with no or only partial electrification?
The Class 800 is closely related to the Class 395 train used on High Speed and third-rail routes South of the Thames. So could we see a third-rail version of the Class 800, or an electro-diesel Class 395 variant, which could run from St. Pancras to Hastings and Eastbourne and from Waterloo to Salisbury and Exeter? This would kill any thoughts of adding more third-rail electrification.
The Class 387 IPEMU and the Class 800 are a Little and Large combination to provide a cost-effective alternative to full electrification of some routes across the UK.
Conclusions
The Class 387 IPEMU, could be a component of a series of solutions, that bring high-quality new electric or electro-diesel trains to a large portion of the UK.
My only worry about them is the battery technology of the IPEMU, which has reportedly been troublesome in some applications on buses and aircraft.
Visiting Dover Castle By Train
Dover Castle is on the featured list on the English Heritage web site. They say it is 1.2 miles from Dover Priory station, but is it an easy, stiff or hard walk?
This Google Earth image shows the location of the station and the castle.
The castle is obvious and the station is in the bottom-left or south-west corner.
I shall be visiting soon. After all it does give me an excuse to have a ride in one of the excellent Class 395 trains.
To Brighton The Long Way
As it had been a long time, since I’d been to the Rye area in Kent, I decided to go to see Ipswich at Brighton, by taking the long way round via Ashford, Brighton and Lewes.
I arrived at Ashford on the high speed Class 395 from St. Pancras and from there to Rye, I had a very clean Class 171 to myself.
With some of the controversy about the lack of toilets on Crossrail, it is interesting to note that the six car Class 395 has only two toilets, whilst the two car Class 171 has just a single. So it would appear that there isn’t much demand for toilets-on-the-go in Kent.
On a serious note, the journey from Ashford to Rye is on the Marshlink Line, which has recently been looked at for electrification so that high-speed services can come from St. Pancras to Hastings, Bexhill and Eastbourne via Ashford. It’s reported here in Kent Online.
If you look at the area from Ashford to Eastbourne, it is not one of the most prosperous places in the South East, although it has improved in recent years, so the promoters of the scheme might have a point, when they say an improved train service might give the whole area a lift.
An electrified Marshlink Line connecting Ashford to Ore where the existing third-rails finish could be one of those additions to the rail network, where because it’s there, you get all sorts of unexpected benefits.
The electrification would have to be third rail, which is probably something Network Rail want to avoid. But this would mean that apart from the freight services to Dungeness Power station, all the services along the South Coast could be electric, as third rail running is no problem for the Class 395. The Class 171 would find employment elsewhere.
The case is probably not a strong one, as if it was when the Marshlink Line had problems in Ore Tunnel a couple of years ago, the powers that be, would have taken the opportunity presented by the line closure to electrify it.
What will probably result in the electrification of the Marshlink Line is developments on the diesel-operated Uckfield branch of the Oxted Line. In the discussion of the future of this line on Wikipedia, various scenarios are put forward that could result in the full electrification of this line. If this happens, then electrification of the Marshlink Link would remove the Class 171 trains from Sussex and Kent, which surely would be a saving in train care costs.
According to this report in the Sussex Express, the council is backing electrification of both lines.
Electrifying two rail lines in East Sussex, including Uckfield to Hurst Green, is the best way of improving capacity, reducing journey times and boosting the county’s economy, a council chief said.
East Sussex County Council has designated the electrification and dual tracking of the Uckfield to Hurst Green and Hastings to Ashford lines as its key priorities for improving rail infrastructure and services.
The report also mentions an East Sussex Council Council report entitled Shaping Rail In East Sussex.
I have read this and it is a sensible document, that shows the council is serious about providing a good rail service for the area.
One thing the report mentions is that Thameslink was going to go to Eastbourne, but this has now been dropped. Other reports show that many commuters would like to be in London in seventy minutes instead of the current ninety and they had hoped a direct link via Thameslink would have helped achieve this. I doubt, going from Eastbourne to London via Ashford, would be anywhere near the magic seventy.
After 2018 when Thameslink is fully open, the pressure on railways in East Sussex will inevitably increase. Especially, as it is a county, where a lot of the roads are not an easy alternative.
I do wonder if electrification and dualling of these two lines is going to be one of a host of infrastructure projects announced before May.