The Anonymous Widower

Reading Green Park Station – 27th May 2023

Reading Green Park station opened today, so I went and took these pictures.

Note.

  1. It is a high-specification station with two platforms, toilets and full step-free access using a bridge and lifts.
  2. I was told, that the station can handle six-car trains.
  3. There is no coffee kiosk in the station, but there is a Tesco Express outside.
  4. Trains run between Reading and Basingstoke, at a frequency of two trains per hour (tph).
  5. The Reading and Basingstoke Line is partially-electrified.
  6. As I’ve seen before, there was a Chinese guy taking pictures of the station.
  7. At present there are only 54 parking spaces, but Wikipedia indicates this could be increased.

This Google Map shows the station under construction.

The map shows the station has room for expansion, which in a thriving town like Reading could be important.

I have a few thoughts.

Rolling Stock

The route is not unique, but it is unelectrified, but has 1.8 miles of high quality electrification at the Northern end.

This equates to a route, where 11.7 % is electrified.

Trains normally terminate at Reading in the fully-electrified Platform 2, which is shown in this picture.

In a typical round trip, a train can spend up to 26 mins under the wires between passing Southcote junction going North and passing it going South.

This time should be more than enough to fully-charge a battery-electric train.

Consider.

So was the electrification scheme at Reading designed knowing the results of the trials in Essex, which showed that battery-electric trains did more than work and were a serious proposition?

A sixty mile range would mean a battery-electric train could handle, these routes from Reading.

  • Southcote junction and Basingstoke and then back to the electrification at Southcote junction, which would be 27.2 miles.
  • Newbury and Westbury, which is 42.5 miles.
  • Didcot Parkway and Oxford and then back to the electrification at Didcot Parkway, which would be 21.0 miles.

If four-car Class 321 Renatus, Class 379 or Class 387 trains were to be converted, I doubt there would be many modifications needed to stations and track.

The Bridge

The bridge has everything anybody would want with two lifts, stairs and lots of glass for good views.

But what puzzles me about Network Rail’s bridges is that a few years ago, they held a competition with RIBA to design a bridge.

This stylish, affordable and easy-to-install footbridge was the winner.

I wonder why not one has been built!

Ticketing

I feel there could be a minor problem with the ticketing.

For my trip today, I used my Freedom Pass on the Elizabeth Line as far as Reading, where I bought a return to Basingstoke, as I wanted to photograph something at that station.

In common with many stations, I had to exit from Reading station to buy my ticket from a machine.

As Reading has that superb bridge with lots of space and many changes at Reading will involve crossing the bridge, would it not be possible to put a ticket machine on the bridge?

I have travelled extensively on German trains and they place lots of ticket machines on the platforms, which I have used extensively, as their English is better than my German, which I have to use in a ticket office.

 

 

May 27, 2023 Posted by | Transport/Travel | , , , , , , , , , | 4 Comments

Reading’s First New Station In Over 100 Years Set To Open This Month

The title of this post is the same as that of this article on Rail Technology Magazine.

These two paragraphs outline the story.

Reading is set to welcome its first new railway station for over 100 years, as Green Park station is currently set to open for services on Saturday 27th May 2023.

Representing the first station to open in the area since Reading West in July 1906 and being the inaugural of three new Great Western Railway (GWR) stations opening this year along with Portway Park & Ride in Bristol and Marsh Barton in Exeter, this station will improve transport links and sustainability throughout the region.

These details of the station are also given.

  • Two 150m platforms
  • A new fully accessible station building
  • A fully accessible overbridge, providing access to both platforms, via stairs and lifts.
  • A bus interchange, taxi rank and cycle parking facilities
  • Two car parks with blue badge spaces, drop-off parking and long-stay parking.

The station will be on the  Reading to Basingstoke line, with half-hourly trains.

Note.

  1. The station is a reasonable walk from Reading FC’s ground.
  2. The station is South of Southcote Junction, so won’t have trains to Newbury.
  3. Bramley station, which is towards Basingstoke, is to be improved, as I wrote about in Beeching Reversal – Unlocking Capacity And Services Through Bramley (Hants).
  4. The route is partially electrification.
  5. There also may be a new station at Chineham.

Could the opening of Green Park station, be the start of more rail development in the area?

These are my thoughts.

A New Station At Chineham

This is said about a new station at Chineham, in a section called Future in the Wikipedia entry for the Reading to Basingstoke Line.

Plans have also been discussed over the years for a further new station to the north of Basingstoke, serving the Basingstoke suburb of Chineham. However doubts have been cast on the capacity of the line to support a further station after the opening of Green Park. The line between Southcote Junction and the Great Western Main Line is heavily trafficked and, in 2015, Network Rail’s Western Route Study suggested the provision of a grade separated junction at Southcote, with a third track to be provided between there and the Oxford Road Junction at Reading West.

Chineham could be an expensive station.

Extra Capacity Between Reading and Basingstoke

In addition to the two trains per hour (tph) between Reading and Basingstoke, there are also CrossCountry trains and freight services using the route.

As I said in Beeching Reversal – Unlocking Capacity And Services Through Bramley (Hants), I believe that if Chineham station is added, there will be a need for four tph on the line.

I also suspect that with the opening of the Western Rail Approach to Heathrow, this route could be used for trains between Basingstoke and Heathrow.

This could end up as a very busy line.

150 Metre Platforms At Reading Green Park Station

These are only seven-car platforms. Would they be long enough, if Reading FC were consistently in the Premiership?

I suspect that prudence would have said the platforms of all stations on the line, should be long enough to handle the nine-car trains of the Elizabeth Line.

Electrification

The Reading and Basingstoke route probably needs full electrification.

This would allow.

  • Electrified freight trains between Southampton and the North.
  • CrossCountry and other passenger trains to be electrified.

The electrification would need to be 25 KVAC overhead, as no more third rail electrification is possible.

Elizabeth Line Extension To Basingstoke

I wouldn’t rule this out from happening, at some time in the future.

 

May 15, 2023 Posted by | Transport/Travel | , , , , , , , | Leave a comment

Work Begins On Bristol’s First Railway Station Since 1927

The title of this post, is the same as that of this article on the BBC.

These are the first two paragraphs.

Construction work has begun on Bristol’s first new railway station in 95 years.

Portway Park & Ride will open in the Summer, linking Shirehampton with the Severn Beach railway line.

It is planned to open this Summer.

I first wrote about Portway Parkway station in DfT Names Five Winners Of Fresh £16m Stations Fund in 2017, when the stations names were as follows.

  • Horden Peterlee in County Durham
  • Warrington West in Cheshire
  • Reading Green Park
  • Bow Street in Ceredigion, Wales
  • Portway Parkway near Bristol

Note.

  1. Portway Parkway is the last station to start construction.
  2. Reading Green Park station is still under construction and should open this year.
  3. Bow Street station opened in February 2021.
  4. Horden station opened in June 2020. I wrote about station after a visit, in Horden Station – 28th October 2020.
  5. Warrington West station opened in December 2019. I wrote about the station after a visit in January 2020, in The New Warrington West Station.

Given the pandemic, the construction hasn’t gone too badly.

February 4, 2022 Posted by | Transport/Travel | , , , , , , | Leave a comment