Sparking A Revolution

The title of this post is the same as that of an article in Issue 898 of Rail Magazine.

The sub-title is.

When it comes to powering a zero-enissions train with no overhead line infrastructure, battery power is clearly the answer, according to Hitachi.

These are the first three paragraphs.

Over the next decade around 1,000 diesel-powered vehicles will need to be replaced with vehicles that meet emissions standards.

Hitachi, which has been building bi-mode trains for the UK since 2012, and electric trains since 2006, says that retro-fitting old vehicles alone will not be good enough to improve capacity, reliability or passenger satisfaction.

Battery power is the future – not only as a business opportunity for the company, but more importantly for the opportunities it offers the rail industry.

Speaking is Andrew Barr of Hitachi Rail.

Some important points are made.

  • Hitachi has identified various towns and cities, where battery trains would be useful including Bristol, Edinburgh, Glasgow, Hastings, Leeds and Manchester.
  • Andrew Barr says he gets a lot of questions about battery power.
  • Battery power can be used as parts of electrification schemes to bridge gaps, where rebuilding costs of bridges and other infrastructure would be too high.
  • Battery trains are ideal for decarbonising branch lines.
  • Batteries could be fitted to Class 385, 800, 802 and 804 trains.

Hitachi would like to run a battery train with passengers, within the next twelve months.

The article also gives the specification of a Hitachi battery train.

  • Range – 55-65 miles
  • Performance – 90-100 mph
  • Recharge – 10 minutes when static
  • Routes – Suburban near electrified lines
  • Battery Life – 8-10 years

These figures are credited to Hitachi.

Hitachi are also thinking about tri-mode trains.

  • Batteries could be installed on Class 800-802/804 trains.
  • Battery-only power for stations and urban areas.
  • 20% performance improvements or 30% fuel savings.

These is also credited to Hitachi.

Costs And Power

This is an insert in the article, which will apply to all applications with traction batteries.

This is said.

The costs of batteries are expected to halve in the next five years, before dropping further again by 2030.

Hitachi cites research by Bloomberg New Energy Finance (BNEF) which expects costs to fall from £135/kWh at the pack level today to £67/kWh in 2025 and £47/kWh in 2030.

United Kingdom Research and Innovation (UKRI)  is also predicting that battery energy density will double in the next 15 years, from 700 Wh/l to 1,400 Wh/l in 2035, while power density (fast charging) is likely to increase four times in the same period from 3 kW/kg now to 12 kW/kg in 2035.

In Batteries On Class 777 Trains, I quoted a source that said that Class 777 trains are built to handle a five tonne battery.

I estimated the capacity as follows.

Energy densities of 60 Wh/Kg or 135 Wh/litre are claimed by Swiss battery manufacturer; Leclanche.

This means that a five tonne battery would hold 300 kWh.

Hitachi’s figures are much higher as it looks like a five tonne battery can hold 15 MWh.

Batteries will be going places on Hitachi trains.

 

February 16, 2020 - Posted by | Energy Storage, Transport | , , , , , ,

14 Comments »

  1. […] Sparking A Revolution, a post based on an article of the same name in Issue 898 of Rail Magazine, I repeated this about […]

    Pingback by Are Hitachi Designing the Ultimate Battery Train? « The Anonymous Widower | February 18, 2020 | Reply

  2. […] Sparking A Revolution, I talked about Hitachi’s plans to develop battery versions of their Class 800 […]

    Pingback by Charging Battery Trains « The Anonymous Widower | February 20, 2020 | Reply

  3. […] Sparking A Revolution, I talked about Hitachi’s bullish plans for battery-powered trains, in a section called Costs […]

    Pingback by Thoughts On The Actual Battery Size In Class 756 Trains And Class 398 Tram-Trains « The Anonymous Widower | March 11, 2020 | Reply

  4. […] Sparking A Revolution, I gave this specification for a Hitachi battery-electric […]

    Pingback by EWR Targets Short-Term Fleet Ahead Of Possible Electrification « The Anonymous Widower | March 16, 2020 | Reply

  5. […] Sparking A Revolution, I quoted Hitachi’s predictions and suggested that they could have a five-tonne battery, that […]

    Pingback by Flying Taxi Start-Up Raises $240m From Existing Investors Led By Tencent « The Anonymous Widower | March 23, 2020 | Reply

  6. […] Sparking A Revolution, I gave this specification for a Hitachi battery-electric […]

    Pingback by The Concept Of Electrification Islands « The Anonymous Widower | April 15, 2020 | Reply

  7. […] Sparking A Revolution, I gave Hitachi’s specification for a proposed battery-electric […]

    Pingback by Electrification Between Exeter And Plymouth « The Anonymous Widower | April 26, 2020 | Reply

  8. […] Sparking A Revolution, I comment on an article of the same name in Issue 898 of Rail Magazine, which talks about […]

    Pingback by MagniX Electric Aircraft Engines Take To The Skies « The Anonymous Widower | June 2, 2020 | Reply

  9. […] Sparking A Revolution I gave Hitachi’s possible specification of a battery-electric […]

    Pingback by Thoughts On East Coast Trains « The Anonymous Widower | June 3, 2020 | Reply

  10. […] February 2020 – Sparking A Revolution – Rail Magazine Issue 898 – Informative interview with Andrew Barr of […]

    Pingback by A Timeline Of Hitachi’s Statements And News About Battery Trains « The Anonymous Widower | June 4, 2020 | Reply

  11. […] Sparking A Revolution, I quoted this Hitachi-specification for a battery-electric […]

    Pingback by Could The Crewe And Derby Line Become A Much More Important Route? « The Anonymous Widower | June 26, 2020 | Reply

  12. […] Sparking A Revolution, I quoted this Hitachi-specification for a battery-electric […]

    Pingback by Birmingham-Black Country-Shrewsbury « The Anonymous Widower | June 27, 2020 | Reply

  13. Hitachi UK, are serious about battery trains, so are Bombardier UK. They must have got feedback from Network Rail (DfT) about procurement of battery trains. Trials are meaningless, as the Hungarians assessed, as they just ordered the battery-electric trains without trials, as other countries have already done that. Now mature technology.
    https://www.businessgreen.com/news/4017372/hitachi-rolls-forward-plans-uk-battery-trains

    Comment by John | July 6, 2020 | Reply

  14. Remember that Bombardier and Hitachi are working together on a HS2 bid. Given, the news today from Hitachi about battery trains, I wouldn’t be surprised to see that the classic-compatible high speed trains have battery power. So have the two companies pooled their ideas?

    Remember, a few days ago Hitachi purchased ABB Power Grids. Do they have ideas for chargers?

    Comment by AnonW | July 6, 2020 | Reply


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.