The Anonymous Widower

CrossCountry’s Bournemouth And Manchester Piccadilly Service

Whilst I was at Basingstoke station yesterday one of CrossCountry‘s services between Bournemouth and Manchester Piccadilly came through, so I took these pictures.

It was a long formation of Class 220 trains.

Could This Service Be Replaced By Hitachi Regional Battery Trains?

This Hitachi infographic gives the specification of the Hitachi Regional Battery Train.

I feel that in most condition, the range on battery power can be up to 56 miles.

I can break the Bournemouth and Manchester Piccadilly route into a series of legs.

  • Bournemouth and Basingstoke – 60 miles – 750 VDC third-rail electrification
  • Basingstoke and Reading – 15.5 miles – No electrification
  • Reading and Didcot North Junction – 18 miles – 25 KVAC overhead electrification
  • Didcot North Junction and Oxford – 10 miles – No electrification
  • Oxford and Banbury – 22 miles – No electrification
  • Banbury and Leamington Spa – 20 miles – No electrification
  • Leamington Spa and Coventry – 10 miles – No electrification
  • Coventry and Manchester Piccadilly – 101 miles – 25 KVAC overhead electrification

Note.

  1. 63 % of the route is electrified.
  2. The short 15.5 mile gap in the electrification between Basingstoke and Reading should be an easy route for running on battery power.
  3. But the 62 mile gap between Didcot North Junction and Coventry might well be too far.

The train would also need to be able to work with both types of UK electrification.

If some way could be found to bridge the 62 mile gap reliably, Hitachi’s Regional Battery Trains could work CrossCountry’s service between Bournemouth and Manchester Piccadilly.

Bridging The Gap

These methods could possibly  be used to bridge the gap.

A Larger Battery On The Train

If you look at images of MTU’s Hybrid PowerPack, they appear to show a basic engine module with extra battery modules connected to it.

Will Hitachi and their battery-partner; Hyperdrive Innovation use a similar approach, where extra batteries  can be plugged in as required?

This modular approach must offer advantages.

  • Battery size can be tailored to routes.
  • Batteries can be changed quickly.

The train’s software would know what batteries were fitted and could manage them efficiently.

I wouldn’t be surprised to see Hitachi’s Regional Battery Train able to handle a gap only six miles longer than the specification.

Battery And Train Development

As Hitachi’s Regional Battery Train develops, the following should happen.

  • Useable battery capacity will increase.
  • The train will use less electricity.
  • Actions like regenerative braking will improve and recover more electricity.
  • Driving and train operating strategies will improve.

These and other factors will improve the range of the train on batteries.

A Charging Station At Banbury Station

If some form of Fast Charge system were to be installed at Banbury station, this would enable a train stopping at Banbury to take on enough power to reliably reach Oxford or Coventry depending, on their final destination.

This method may add a few minutes to the trip, but it should work well.

Electrification Of A Section Of The Chiltern Main Line

This could be an elegant solution.

I have just flown my helicopter between Bicester North and Warwick Parkway stations and these are my observations.

  • The Chiltern Main Line appears to be fairly straight and has received a top class Network Rail makeover in the last couple of decades.
  • There are a couple of tunnels, but most of the bridges are new.
  • Network Rail have done a lot of work on this route to create a hundred mph main line.
  • It might be possible to increase the operating speed, by a few mph.
  • The signalling also appears modern.

My untrained eye, says that it won’t be too challenging to electrify between say Bicester North station or Aynho Junction in the South and Leamington Spa or Warwick Parkway stations in the North. I would think, that the degree of difficulty would be about the same, as the recently electrified section of the Midland Main Line between Bedford and Corby stations.

The thirty-eight miles of electrification between Bicester North and Warwick Parkway stations would mean.

  • The electrification is only eight-and-a-half miles longer than Bedford and Corby.
  • There could be journey time savings.
  • As all trains stop at two stations out of Banbury, Leamington Spa, Warwick and Warwick Parkway, all pantograph actions could be performed in stations, if that was thought to be preferable.
  • Trains would be able to leave the electrification with full batteries.
  • The electrification may enable some freight trains to be hauled between Didcot and Coventry or Birmingham using battery electric locomotives.

Distances of relevance from the ends of the electrification include.

  • London Marylebone and Bicester North stations – 55 miles
  • London Marylebone and Aynho junction – 64 miles
  • Didcot North and Aynho junctions – 28 miles
  • Leamington Spa and Coventry stations – 10 miles
  • Leamington Spa and Birmingham Snow Hill stations – 23 miles
  • Leamington Spa and Stratford-upon-Avon stations – 15 miles
  • Warwick Parkway and Birmingham New Street stations – 20 miles
  • Warwick Parkway and Birmingham Snow Hill stations – 20 miles
  • Warwick Parkway and Kidderminster – 40 miles
  • Warwick Parkway and Stratford-upon-Avon stations – 12 miles

These figures mean that the following services would be possible using Hitachi’s Regional Battery Train.

  • Chiltern Railways – London Marylebone and Birmingham Moor Street
  • Chiltern Railways – London Marylebone and Birmingham Snow Hill
  • Chiltern Railways – London Marylebone and Kidderminster
  • Chiltern Railways – London Marylebone and Stratford-upon-Avon
  • CrossCountry – Bournemouth and Manchester Piccadilly
  • CrossCountry – Southampton Central and Newcastle
  • Midlands Connect – Oxford and Birmingham More Street – See Birmingham Airport Connectivity.

Other services like Leicester and Oxford via Coventry may also be possible.

As I see it, the great advantage of this electrification on the Chiltern Main Line is that is decarbonises two routes with the same thirty-eight miles of electrification.

Conclusion

CrossCountry’s Bournemouth And Manchester Piccadilly service could be run very efficiently with Hitachi’s proposed Regional Battery Train.

My preferred method to cross the electrification gap between Didcot North junction and Coventry station would be to electrify a section of the Chiltern Main Line.

  • The electrification would be less than forty miles.
  • I doubt it would be a challenging project.
  • It would also allow Hitachi’s proposed trains to work Chiltern Main Line routes between London Marylebone and Birmingham.

I am fairly certain, that all passenger services through Banbury would be fully electric.

 

August 15, 2020 - Posted by | Transport | , , , , , , , , , , ,

No comments yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.