Future-Proofing The Uckfield Branch

The Uckfield Branch of the Oxted Line was open today, so as in A Trip To Uckfield, I had to use a Rail Replacement Bus from Crowborough, I took a train to Uckfield station and back from London Bridge. These are some of the pictures I took at Uckfield station.

I can’t disagree with what I said in the previous post.

The platform work is certainly being done to a standard and length, that should be good enough, if the Uckfield Branch is used to create a second Brighton Main Line, by extending the line past Uckfield to Lewes on the route of the former Wealden Line.

All of the platforms I have seen on the Oxted Branch seem to be capable of taking a twelve-car train.

Uckfield’s Long Single Platform

Although, I suspect that Uckfield itself could be a bit longer, especially as workers still seemed to be extending it further to the North.

I would think, that this long platform would enable two eight-car trains to be parked in the station, if there was a need in the Peak or because one of the trains had failed.

It’s just more future-proofing.

Oxted’s Bay Platform

Platform 3 at Oxted station is a South-facing bay platform, which is used to provide shuttle and other services down the two branches. In the last couple of years, it has been electrified, which is just more future-proofing, in case it was required to run an electrified shuttle to East Grinstead.

IPEMUs To Uckfield?

The Oxted Line is electrified from London Bridge as far as Hurst Green station, where the two branches split.

  • The East Grinstead Branch is electrified.
  • Uckfield Branch is not and is about twenty miles long.

As a typical Electrostar IPEMU based on say a Class 387 train, would probably have a range of at least fifty to sixty miles, it would appear that IPEMUs could work the London Bridge or Victoria to Uckfield service.

  • Between London Bridge and Hurst Green the trains would take thirty-two minutes, getting power from the third-rail electrification. Batteries would also be charged on this leg.
  • Between Hurst Green and Uckfield, they would take forty-two minutes and rely on battery power.

I suspect too, that third-rail IPEMUs could charge their batteries fully before they left London Bridge.

Platform 3 at Oxted station might also be useful for charging an IPEMU running a shuttle service on the Uckfield Branch.

In my view, the work done on the Uckfield Branch in recent months has created a line, that would be an ideal route for IPEMUs to provide the service.

  • Platforms have been sufficiently lengthened.
  • Signalling can probably already cope with the longer trains.
  • There is no more electrification required.

All that is needed is to add an IPEMU-capability to the required number of Class 387 trains and train the staff.

How Long Is An IPEMU?

There is one mathematical and marketing problem, that must be solved before trains are run.

Class 387 trains come in sets of four-cars and on Thameslink, typically run in formations of four-, eight- or twelve-cars.

What is the optimal length to run services on the Uckfield Branch, as determined by passenger demand?

And can this length of train be provided?

I’ve not seen anything for instance, which says how many IPEMUs can form a single train.

But I suspect that Bombardier wouldn’t design a train, without a multiple-working capability.

And of course, the Uckfield Branch has been future-proofed for twelve cars.

I suspect that the capacity of the Uckfield Line will be determined more, by the size of the car parks.

Onward To Lewes

This article in the Uckfield News is entitled £100k Budget pledge for Uckfield to Lewes rail line study.

So it is possible that the Uckfield Branch could be extended by about ten miles to Lewes, along the route of the disused Wealden Line.

Intriguingly, as Lewes is fully electrified an IPEMU train going from London Bridge to Lewes would do less distance on batteries than a train going from London Bridge to Uckfield and back.

One of the problems with extending past Uckfield, is that the trains would have to cross the B2102 by the station in the middle of Uckfield.

This used to be a level crossing and I’m certain, that this option will not be reinstated for safety reasons. It has to be said, that as an IPEMU could cross on battery power, there might be a better solution, than a traditional level crossing.

But IPEMUs have another advantage, in that they could use a short underpass without electrification. I just wonder whether that some clever design could squeeze the railway line under the road.

Conclusion

If the passenger demand is there, there would appear nothing in the design of the upgrade to the Uckfield Line, to stop IPEMUs being used to fulfil that demand.

 

 

February 22, 2016 Posted by | Transport/Travel | , , , , | 4 Comments

D-Train Prototype Takes Big Step Forward

This is title of an article in Rail Magazine, which shows a picture of a two-car Class 230 train.

I have a feeling that because of all the other developments in the UK rail industry, that sadly for the project’s backers, that this will be a project filed under Heroic Failures.

If Arriva Rail North can find ways to buy a new fleet of CAF Civity trains and IPEMU technology breaks through as expected, the market in the UK for the D-Train must be getting a lot smaller.

It could be getting to the point, where the train is totally unsaleable in the UK.

February 22, 2016 Posted by | Transport/Travel | , , , | 2 Comments

We Think We Have Problems With Rail Viaducts

Some of the most impressive structures on the UK’s railways are the Victorian brick viaducts.

All of this small selection are still in use on the railways and are Grade II Listed or better.

Many have been renovated at great expense in the last few years and I was prompted to write this post after reading this article on the Network Rail web site, which is entitled Bridges improvement plan for Cheshire will revitalise landmarks. This is said.

Network Rail will refurbish four bridges and two viaducts during an 11-day closure of the Crewe to Manchester and Sandbach to Northwich railway lines, from 13 to 24 February 2016.

The vital work will make the railway safer and more reliable for passengers, motorists, pedestrians and canal users across the county.

Two of Cheshire’s most well-known architectural landmarks, the Grade-II listed viaducts at Holmes Chapel and Peover, will have a full makeover as part of the programme. Water stains on the walls of both viaducts will be removed, damaged brickwork repaired and both structures waterproofed.

At the same time, Network Rail engineers will undertake strengthening work to the Hungerford Road bridge in Crewe, Shipbrook Road bridge in Rudheath, and to the Whatcroft underbridge and the Trent and Mersey Canal bridge in Davenham.

In some ways all this work is a tribute to those Victorian engineers and bricklayers, who designed and built them in the first place.

But it’s an awful lot of work to do!

So I asked myself, if these structures are a uniquely British heritage.

Google and Wikipedia revealed this article about the Göltzsch Viaduct on the Liepzig-Hof Line in Germany. This is said.

It is the largest brick-built bridge in the world, and for a time it was the tallest railway bridge in the world.

As you can get a direct train from Liepzip to Hof, I think, it is still one very much in use.

I think next tme, that I’m in the area, I shall visit.

 

 

February 21, 2016 Posted by | Transport/Travel | , , , | Leave a comment

Brexit Referendum Betting Odds

This is a log of the Brexit Referendum Betting Odds or Oddschecker.

  • February 20th – Stay 2/5 – Leave 5/2
  • February 21st – Stay 4/11 – Leave 5/2
  • February 22nd – Stay 2/5 – Leave 15/8 – Boris comes out!
  • February 23rd – Stay 4/9 – Leave 21/10 – Business leaders letter in Times
  • February 24th – Stay 2/5 – Leave 9/4
  • February 25th – Stay 2/5 – Leave 9/4
  • February 26th – Stay 2/5 – Leave 9/4
  • February 27th – Stay 4/11 – Leave 9/4
  • February 28th – Stay 4/11 – Leave 9/4
  • February 29th – Stay 4/11 – Leave 9/4
  • March 1st – Stay 4/11 – Leave 9/4
  • March 2nd – Stay 4/11 – Leave 9/4
  • March 3rd – Stay 4/11 – Leave 9/4
  • March 4th – Stay 4/11 – Leave 5/2
  • March 5th – Stay 4/11 – Leave 5/2
  • March 6th – Stay 4/11 – Leave 5/2
  • March 7th – Stay 4/11 – Leave 5/2
  • March 8th – Stay 4/11 – Leave 5/2
  • March 9th – Stay 4/11 – Leave 5/2
  • March 10th – Stay 4/11 – Leave 5/2
  • March 11th – Stay 4/11 – Leave 12/5
  • March 12th – Stay 4/11 – Leave 12/5
  • March 13th – Stay 4/11 – Leave 12/5
  • March 14th – Stay 4/11 – Leave 12/5
  • March 15th – Stay 2/5 – Leave 9/4
  • March 16th – Stay 2/5 – Leave 9/4
  • March 17th – Stay 2/5 – Leave 2/1 – Budget on the 16th
  • March 18th – Stay 2/5 – Leave 21/10
  • March 19th – Stay 2/5 – Leave 21/10
  • March 20th – Stay 3/8 – Leave 2/1 – DLS Resigns
  • March 21st – Stay 3/8 – Leave 2/1
  • March 22nd – Stay 7/19 – Leave 2/1
  • March 23rd – Stay 4/9 – Leave 15/8 – Brussels Attacks
  • March 24th – Stay 4/9 – Leave 15/8
  • March 25th – Stay 4/9 – Leave 15/8
  • March 26th – Stay 4/9 – Leave 2/1
  • March 27th – Stay 2/5 – Leave 15/8
  • March 28th – Stay 2/5 – Leave 15/8
  • March 29th – Stay 2/5 – Leave 15/8
  • March 30th – Stay 4/9 – Leave 15/8
  • March 31st – Stay 4/9 – Leave 15/8
  • April 1st – Stay 2/5 – Leave 15/8
  • April 2nd – Stay 2/5 – Leave 2/1
  • April 3rd – Stay 2/5 – Leave 2/1
  • April 4th – Stay 2/5 – Leave 2/1
  • April 5th – Stay 4/9 – Leave 2/1
  • April 6th – Stay 4/9 – Leave 2/1
  • April 7th – Stay 4/9 – Leave 2/1
  • April 8th – Stay 4/9 – Leave 2/1
  • April 9th – Stay 4/9 – Leave 2/1
  • April 10th – Stay 4/9 – Leave 2/1
  • April 11th – Stay 4/9 – Leave 2/1
  • April 12th – Stay 4/9 – Leave 2/1
  • April 13th – Stay 4/9 – Leave 2/1
  • April 14th – Stay 4/9 – Leave 21/10 – Corbyn comes off the fence
  • April 15th – Stay 4/9 – Leave 21/10
  • April 16th – Stay 4/9 – Leave 21/10
  • April 17th – Stay 4/9 – Leave 21/10
  • April 18th – Stay 4/9 – Leave 21/10
  • April 19th – Stay 1/2 – Leave 21/10 – Gove speaks
  • April 20th – Stay 1/2 – Leave 15/8
  • April 21st – Stay 4/9 – Leave 2/1
  • April 22nd – Stay 4/9 – Leave 2/1 – Obama speaks
  • April 23rd – Stay 4/11 – Leave 12/5
  • April 24th – Stay 4/11 – Leave 5/2
  • April 25th – Stay 1/3 – Leave 13/5
  • April 26th – Stay 2/7 – Leave 3/1
  • April 27th – Stay 1/3 – Leave 5/2
  • April 28th – Stay 1/3 – Leave 5/2
  • April 29th – Stay 1/3 – Leave 5/2
  • April 30th – Stay 4/11 – Leave 5/2
  • May 1st – Stay 1/3 – Leave 5/2
  • May 2nd – Stay 4/11 – Leave 5/2
  • May 3rd – Stat 4/11 – Leave 5/2
  • May 4th – Stay 4/11 – Leave 12/5
  • May 5th – Stay 4/11 – Leave 23/10
  • May 6th – Stay 4/11 – Leave 9/4
  • May 7th – Stay 4/11 – Leave 12/5
  • May 8th – Stay 4/11 – Leave 12/5
  • May 9th – Stay 4/11 – Leave 13/5
  • May 10th – Stay 4/11 – Leave 13/5
  • May 11th – Stay 4/11 – Leave 13/5
  • May 12th – Stay 4/11 – Leave 13/5
  • May 13th – Stay 4/11 – Leave 13/5
  • May 14th – Stay 1/3 – Leave 12/5
  • May 15th – Stay 1/3 – Leave 12/5
  • May 16th – Stay 1/3 – Leave 5/2
  • May 17th – Stay 3/10 – Leave 11/4
  • May 18th – Stay 2/7 – Leave 11/4
  • May 19th – Stay 2/7 – Leave 16/5
  • May 20th – Stay 2/7 – Leave 15/4
  • May 21st – Stay 2/9 – Leave 4/1
  • May 22nd – Stay 2/9 – Leave 15/4
  • May 23rd – Stay 2/9 – Leave 7/2
  • May 24th – Stay 2/11 – Leave 4/1
  • May 25th – Stay 2/11 – Leave 4/1
  • May 26th – Stay 2/11 – Leave 9/2
  • May 27th – Stat 1/6 – Leave 17/4
  • May 28th – Stay 1/6 – Leave 4/1
  • May 29th – Stay 1/5 – Leave 4/1
  • May 30th – Stay 1/5 – Leave 4/1
  • May 31st – Stay 2/9 – Leave 4/1
  • June 1st – Stay 3/10 – Leave 16/5
  • June 2nd – Stay 3/10 – Leave 11/4
  • June 3rd – Stay 1/3 – Leave 11/4
  • June 4th – Stay 4/11 – Leave 5/2
  • June 5th – Stay 1/3 – Leave 5/2
  • June 6th – Stay 4/11 – Leave 12/5
  • June 7th – Stay 2/5 – Leave 9/4
  • June 8th – Stay 1/3 – Leave 5/2
  • June 9th – Stay 1/3 – Leave 11/4
  • June 10th – Stay 3/10 – Leave 11/4
  • June 11th – Stay 4/11 – Leave 9/4
  • June 12th – Stay 2/5 – Leave 9/4
  • June 13th – Stay 5/12 – Leave 2/1
  • June 14th – Stay 4/7 – Leave 7/4
  • June 15th – Stay 8/13 – Leave 7/5
  • June 16th – Stay 6/11 – Leave 13/8
  • June 17th – Stay 1/2 – Leave 13/8
  • June 18th – Stay 8/15 – Leave 7/4 – The assassination of Jo Cox
  • June 19th – Stay 4/9 – Leave 9/4
  • June 20th – Stay 4/11 – Leave 12/5
  • June 21st – Stay 1/4 – Leave 3/1
  • June 22nd – Stay 2/7 – Leave 3/1
  • June 23rd – Stay 3/10 – Leave 10/3

I shall let the figures do the talking.

February 21, 2016 Posted by | World | , | 3 Comments

Will We Vote For Cameron’s Deal On Europe?

I don’t know the answer and there are probably only a couple of people who can predict the result with any certainty.

I’ve just looked at the reliable Odds Checker web site for their Brexit Referendum Betting Odds and as I write this post, it is 5/2 On to stay in and 5/2 that we’ll leave.

If I vote and I probably will, as the first time I voted was for the EU Referendum of 1975, it will probably be to stay in, as I am a committed European in habit and probably culture.

I also think that we should be in a reformed Schengen Area and that we need a more flexible payment system.

Schengen is an ideal, but in the modern world of terrorism, international crime and immigration pressures, it falls down a deep hole.

What could replace it, I know not, but surely we can find something, that is better than what we have now.

Flexible payments will happen, as cash is replaced by contactless payments on cards and mobile phones.

How long will it be until I look at my credit card statement and see real -time transactions in pounds despite spending them all over the world in euros, dollars and Ruritanian groats?

We will be moving inexorably towards a World electronic currency, that appears to everybody as the one they want to use.

Let’s face it, it’s only software.

The currency merging will be led by the Anglo-Saxon English-speaking triumvirate; the US/Canada, the UK and Hong Kong/Singapore.

The Eurozone will be unable to keep the Euro out of this juggernaut.

Europe’s biggest problem is migration and despite what you read in the Mail and the Express, because of our island status, we are isolated from the worst excesses of uncontrolled migration into the European Union.

I think it will have further effects after it destroys Schengen in its present form.

There are elections in a lot of European states soon!

Will we see fruit-cake parties campaigning against more migration and for a renegotiating of their relationship with the European Union, as David Cameron has just done?

You bet we will!

David Cameron has truly opened Pandora’s Box!

 

February 20, 2016 Posted by | World | , , , | Leave a comment

Putin And Europe’s Far Right

There was a headline in The Times yesterday of Le Pen’s party asks Russia for €27m loan.

So I searched for Putin’s links to far right parties and found this article in the Guardian entitled We should beware Russia’s links with Europe’s right. This is said.

It sounds like a chapter from a cheesy spy novel: far-right European party, in financial trouble, borrows a big sum of cash from a hawkish Russian president. His goal? To undermine the European Union and to consolidate ties between Moscow and the future possible leader of pro-Kremlin France.

Europe isn’t the problem! It’s Putin and Russia!

February 20, 2016 Posted by | World | , , , | Leave a comment

Searching For What Is Going To Happen On The East London Line After The Thameslink Programme Opens

My E-Mail To Thameslink On The 14th February

On the 14th February, I sent this e-mail to the Thameslink Programme.

At present when I go to Gatwick Airport, I get an East London Line train from Dalston Junction to New Cross Gate or Norwood Junction, from where I pick up a Gatwick Train.

Can you confirm, that the current service will be equally good or even better after the Thameslink Programme is completed?

 

A Reply From Thameslink On The 17th February

On the 17th February, I got this reply.

Thanks for your email.

 

The Thameslink Programme is transforming north-south travel through London. This infrastructure and new trains investment programme will increase capacity on one of Europe’s busiest stretches of railway. For more information on the benefits of the programme, you can visit our website here, and an interactive map of our improvement sites here.

 

We’ve already delivered longer, 12-car trains between Brighton and Bedford, platform lengthening at several stations, track work and upgraded stations including West Hampstead, Farringdon and Blackfriars. The most complex part of the programme is now underway; this includes rebuilding London Bridge station, and laying new track and signalling equipment around the station to create a spacious and better connected transport hub.

 

We are linking parts of the East Coast Mainline to the Thameslink network, allowing passengers from Cambridge and Peterborough to travel to Blackfrairs and beyond, relieving congestion on the Underground.

There will also be a link with Crossrail at our hub station at Farringdon, giving access to Gatwick, Luton and Heathrow airports and St Pancras International.

Dalston Junction is managed by TfL, and so any enquries about an improved link from this station to Gatwick should be directed to overgroundinfo@tfl.gov.uk.

I hope this is helpful, thanks for getting in touch.

Kind regards,

Jen Pattison, Thameslink Programme

 

My E-Mail To Overground Info On The 17th February

So I sent off a longer e-mail to Overground Info.

If say you want to go between Dalston Junction and Purley, you will certainly have to change trains.

Currently, it takes between fifty and sixty minutes and you sometimes change at New Cross Gate and at other times the suggested change is Norwood Junction.

It’s alright for me and others who know how to use the various journey calculators or apps, but what about people like my late wife, who never ever owned a smart phone or even sent a text message.

The full simple rule for Dalston Junction to Purley, seems to be something like take a West Croydon train from Dalston Junction to Norwood Junction and then get the first train to Purley from there.

Different rules apply to different stations

Thameslink is going to bring major changes to how we go places along the East London Line and especially, if we venture into any Thameslink territory.

My simple example of Dalston Junction to Purley might get a lot more complicated, as some documents and web pages, say that Thameslink services between London Bridge and East Croydon will not stop. So how do passengers on the East London Line catch these trains to places like Purley, Gatwick and Brighton?

To get to Thameslink, those on the East London Line, will have to go to Whitechapel and get a train to Farringdon or St. Pancras

That will be a pain for anybody, whose local station is anywhere on the East London Line and very much a degradation of the current service.

Those living near Norwood Junction have already lodged a petition with the London Assembly.

 

My Reply From OvergroundInfo On The 19th February

On the 19th February, I got this reply.

Thank you for contacting London Overground.

I am sorry however I am unable to help with the issue you raise. They will be best addressed by Thameslink.

As a result I have passed your comments to them. I am sure that you will hear from them soon, however if you want to contact them their details are:

Email: customerservices@thameslinkrailway.com

You certainly can’t complain about the promptness of the replies but I’m back to square one.

All I want to know, is how the millions of us in East London will get to Gatwick Airport, as conveniently as we do now!

February 19, 2016 Posted by | Transport/Travel | , , | 2 Comments

Serial Cooking – Lemon And Spinach Cod Gratin

This recipe is another from Lindsey Bareham in The Times.

Lindsey called it a speedy gratin, based on an idea from a reader.

I made it as one large one for two helpings for myself.

February 19, 2016 Posted by | Food | , , | 1 Comment

The IPEMU Advantage

Others question and they do rightly, my enthusiasm for the IPEMU or the battery-powered train.

This post which takes information from a variety of sources explains why I think as I do.

This document on the Network Rail web site explains the thinking of Bombardier and Network Rail.

Running Trains

Running trains is a co-operation between several parties.

  • The passengers.
  • The train operating companies like Virgin Trains, LOROL, Abellio Greater Anglia etc.
  • The train builders like Bombardier, CAF, Hitachi, Siemens etc.
  • The infrastructure provider like Network Rail, airports, property developers etc.
  • The regulators and elected bodies like Government, TfL etc.

So what advantages does an IPEMU bring to each group?

The Train Builders

Is it simply a matter of who makes the best trains, will get the greatest number of orders?

The train of the future will.

  • Be powered by electricity.
  • Have regenerative braking to capture braking energy as electricity.
  • Have a lot of power-hungry passenger features like air-conditioning, wi-fi and charging sockets.
  • Have the ability to move to a limited amount without power, in depots, when the power fails, or where there are deliberate electrification gaps.
  • Have a very sophisticated drive control and train management system, which matches train speed and acceleration to location, line, traffic, weather, passenger demand and type of power available.

In some ways regenerative braking is the most important, as it can save almost twenty per cent of the electricity used by a train.

I wouldn’t be surprised that, in a few years time, manufacturers will find it very difficult to sell a train without regenerative braking.

The electric power generated in regenerative braking can either be returned to the power supply or stored on the train.

Returning power is easy on DC systems using conductor rail, like subways, the Underground or Southern Electric, but can be expensive on 25 kVAC overhead systems.

Remember too, that when a train stops, it has to start again and will want the braking energy back.

From an engineering point of view, probably the best way to create an electric train with regenerative braking is to have onboard energy storage to capture the braking energy.

This is already done extensively in an analogous manner with hybrid road vehicles. It could even be done now with a diesel-electric train such as an Inter-City 125.

This leads to the proposition that within a few years all train manufacturers will need to make trains, with some form of battery or onboard energy storage.

The latter term is better as who knows what will be used for energy storage in the future? Batteries, KERS and super-capacitors have all been used in rail applications.

Consider.

  • All of Bombardier’s new Aventra trains, have provision to plug in an energy storage device, if the customer wants one.
  • Several tram manufacturers have products which use onboard energy storage, that have already been ordered and/or delivered.
  • Road transport and increasingly buses and passenger cars are hybrid with onboard energy storage.
  • Trains with onboard energy storage can be moved without power in depots and when wires come down.
  • Bombardier have stated that their IPEMU technology is also being designed to retrofit to existing modern trains like Class 375/377/378/379/387 etc. trains.
  • The complicated mathematics of steel wheel on steel rail mean the extra weight of the onboard energy storage is not a disadvantage.

All of this goes together to make the cost of running a train more affordable.

Bombardier’s Prototype IPEMU

Bombardier must be pretty bullish about their technology, as a year ago, they allowed the public to ride on a Class 379 train, that had been modified to be a technology demonstrator.

An Outwardly Normal Class 379 Train

An Outwardly Normal Class 379 Train

I rode the train and was very impressed.

,It felt just like a standard train and I wouldn’t have known it was running on battery power except for the engineer sitting opposite, who was monitoring the train on his laptop.

Since that ride, there has been no adverse reports in the press and Bombardier have won an award for the technology.

When I am asked what are some of the most impressive experiences in my long life, riding this train certainly ranks towards the top, of those, which were not of my design or creation.

Until I came home and looked up the physics of steel wheel on steel rail, despite being an electrical engineer, I just didn’t believe that batteries could move a train.

In The Technology That Enables The Aventra IPEMU, I wrote about the physics and also what Bombardier seemed to be planing for the new Aventra train, which will have the capability of onboard energy storage.

I think it is true to say, that the unique thing Bombardier has done is to put a credible package together and demonstrate it in public.

The Train Operating Companies

Train companies gain a rather diverse set of advantages from IPEMU technology..

  • More services can be given modern electric trains.
  • Depots and sidings can be built without electrification, which saves money and makes them safer for the workforce.
  • Electrification can be cut back to where it is actually needed.
  • Regenerative braking cuts times at stops and increases service speed.
  • As trains use less electricity, costs are less.
  • IPEMU trains have a limited diversion capability, which can ease disruption.
  • The company has a greener profile.

Hopefully, the performance and profile of the company will attract more customers and hence increase profits.

The Passengers

They will gain mainly from the benefits of modern electric trains.

But IPEMUs will bring other benefits to passengers.

  • New services to new destinations.
  • Faster services on routes with lots of stops.
  • Better response when problems inevitably occur with overhead wires.

Hopefully, the lower cost of electric trains with regenerative braking may even result in lower fares.

The Regulators And Politicians

I have a feeling that the regulators will like the IPEMU, as the benefits will mean that passengers should be happier with better services, at hopefully a lower fare.

Politicians, and regulators are mainly of that ilk, that loves to leave a legacy. And they especially like to leave a legacy, which means they get voted back!

Consider the simple one or possibly two station extension of the Gospel Oak to Barking Line (GOBlin) to Barking Riverside.

  • It looks like it will sensibly be done after the main route is fully electrified.
  • Only Class 710 trains would be used on the extension.
  • These trains will be Aventras and could easily be fitted with an IPEMU capability.
  • Once it leaves the main line all infrastructure is new.

I believe that using an IPEMU on the extension would be beneficial.

  • No electrification would be needed.
  • Stations would be simpler.
  • There would be no visual intrusion of overhead gantries.
  • Train noise would be less.
  • Removing electricity would make the environment safer.
  • No one is likely to object.

But the main benefit, is that the extension can be built at a much lower cost.

How many new or improved short extensions to the main electrified rail network would IPEMU technology enable?

The politicians will come to love the concept of an IPEMU!

The Infrastructure Providers

Network Rail helped fund the original trial at Manningtree using a modified Class 379 train and you can understand why!

Electrification of lines is enormously expensive for infrastructure companies.

  • Putting up wires means raising hundreds of bridges and boring out tunnels.
  • Putting up wires seems to constantly drill through important cables.
  • Putting up wires in depots, stations and sidings can be very complicated.
  • Putting up wires raises heritage issues.
  • The Nimbys often don’t like unsightly wires.
  • A major cost is often getting the power to the wires.
  • Upgrading existing electrification for traditional regenerative braking is not a simple operation.
  • Engineers to do the work are in short supply.

So infrastructure companies will probably welcome anything that cuts the amount of new electrification and upgrade work.

One piece of technology we will see increasingly, is the ability of electric trains to deploy and retract the pantograph at line speed, as I believe the new Hitachi Class 800 trains can do.

So where will we see IPEMU technology used to cut the amount of electrification, but not the deployment of electric trains?

  • Any branch line from an electrified main line, that is currently run by a diesel multiple unit. Branch lines like Felixstowe, Henley, Marlow, Sudbury, Uckfield and Windsor are probably IPEMU-ready after some platform extension and signalling work for longer trains.
  • New extensions from an electrified line to major property developments like Barking Riverside.
  • New extensions into restricted spaces, such as airports like Glasgow and Luton.
  • Existing lines that connect two electrified main lines like Cambridge to Ipswich and Cambridge to Norwich.
  • Electrification gaps can be left in heritage areas like the Grade 2-listed Hebden Bridge station or where the Midland Main Line, runs through the Derwent Valley Mills World Heritage Site.
  • Electrification gaps can be left where the geography is just impossible to build, access or maintain the overhead wires.
  • Depots and sidings can be left without electrification.

Obviously, electrification gaps can only be left where all trains are diesel, bi-mode or have an IPEMU capability.

Relying on rumours and snippets in the media, the Internet and on blogs, I think we’ll see IPEMUs used in these places first.

  • The extension of the Gospel Oak to Barking Line to Barking Riverside.
  • Branch lines on the Great Western Railway, between London and Didcot.
  • Branch lines in East Anglia.
  • Merseyrail to Preston and Wrexham.
  • Removal of diesel trains from the Southern franchise in Sussex and Kent.

I would add the Northern City Line, but the order for new trains has gone to Siemens.

The electrification of this line from Finsbury Park to Moorgate is a mixture of third rail and overhead.

As the new trains will be the only ones working this line, a train could use an IPEMU capability South of Finsbury Park. When all the Class 313 trains have been moved on, the third rail electrification would not be needed.

As it’s a couple of years before the Class 700 trains are delivered, I just wonder if they’ll have an IPEMU capability.

According to this article in the Daily Telegraph, Siemens are certainly experimenting with the use of batteries in trains.

The Current Status

Of the major manufacturers, this is the current published status, as far as I can determine.

  • Bombardier have demonstrated their technology in public and used it in trams.
  • Bombardier are researching heavily into the best battery system at Mannheim.
  • Bombardier have also built large numbers of EMUs in recent years, that are suitable for retrofit with IPEMU technology.
  • CAF spend heavily on R & D, have used the technology in trams for some years.
  • CAF have sold that type of tram to the Midland Metro.
  • JR East, who are on the list of preferred suppliers for Merseyrail’s new trains, have working Battery Trains In Japan.
  • Siemens and Alsthom have trams running on batteries.
  • Hitachi are backing the bi-mode, but must have access to Japanese technology.

On the down-side Bombardier have well publicised financial problems.

The Future

Currently, the IPEMU technology has a range of about fifty miles on battery, which if there is no en-route charging means that it could be used on short branches up to twenty miles.

This range will grow, as engineers know how to stretch the onboard energy storage capacity.

Engineers will also learn how to use the technology to take electric trains into more and more places, that are now thought impossible.

I think that the launching of battery trams in Birmingham will alight everybody’s minds to the possibilities of battery power.

 

 

February 19, 2016 Posted by | Transport/Travel | , | Leave a comment

New Trains On Thameslink

I had breakfast at Kings Cross and then hopped across the city on Thameslink to Blackfriars to go for a walk through the Tate Modern. I came back to Farringdon, as because the East London Line is closed, a bus from Moorgate is the best way to get home.

These were pictures I took of new trains on Thameslink.

Note the following.

  • The red trains with the grey doors are Class 387/2 trains destined for the Gatwick Express later this month.
  • The interior shots were all taken in a Class 387/2 trains.
  • The white train with the sloping front and the light blue doors, is a new Class 700 train, which will run on Thameslink.

The pictures were taken at St. Pancras International, Blackfriars and Farringdon.

The new Class 387/2 trains had a definite feel of the Class 387/1 trains about them, except they had sizeable luggage racks and possibly more tables.

There are better and more luxurious airport trains in the world, including probably the Class 332  trains of Heathrow Express. But as a train to speed you to the Airport in thirty minutes or so, with plenty of space for you and your luggage, they probably pass the first test by a good margin.

They would be very good on other Airport routes in the UK.

  • Routes connecting Manchester Airport to Liverpool, Manchester, Crewe and Blackpool.
  • A possible Gatwick Express route from Reading to Ashford International, which I think could happen, if an IPEMU variant were to be developed.
  • To and from Airports like Cardiff, Stansted and Southend.

An IPEMU variant could be useful in developing spurs to airports like East Midlands, Luton and Glasgow, which would be built without wires from lines with full electrification. Bombardier has the technology, all they need is the orders.

Would this approach be an affordable way to create the much needed airport link at Glasgow Airport?

  • A single-track spur leading from the Inverclyde Line to the Airport to a single platform station would probably have enough capacity for a two or three trains per hour service.
  • No electrification would be needed, which would mean that there would be greater flexibility in the route of the line. It might even go in a single-track tunnel under taxiways.
  • There would be some modification to the signalling.
  • The trains would be bog standard Class 387/2 trains, except for the energy storage.
  • Two trains would probably give a two trains per hour service to the airport, as Glasgow Central to Paisley \st. James takes around twenty minutes.
  • The trains would just be more trains running between Glasgow and Paisley.
  • It would be simpler than a tram-train and require no special rules or modified stations.
  • I can’t think of any new regulatory issues, as it will be a train running on a railway.
  • There would need to be some staff training.

The overall system would be no more complicated than running the demonstration Class 379 IPEMU on the Harwich branch, which seemed to work so well.

How much would it cost?

The creation of the new line to Ebbw Vale Town station and the single platform station is reported to have cost less than twelve million pounds.

According to this article in Railway Technology, Porterbrook have paid £100million for twenty Class 387 trains, so two trains would cost ten million.

I also think that provision of the track and trains in something like the Glasgow Airport Rail Link, is the sort of project that a company would provide and then lease to the train operator.

No wonder, that Bombardier have won an award for the technology and Porterbrook bought some Class 387 trains on spec.

February 18, 2016 Posted by | Transport/Travel | , , , , , , , , | Leave a comment