Eurostar Cancels All Today’s Trains After Tunnel Floods
The title of this post, is the same as that of this article on the BBC.
This is the sub-heading.
Eurostar has cancelled all of Saturday’s services to and from London St Pancras due to flooding in a tunnel under the River Thames, throwing new year travel into chaos.
These are the first two paragraphs.
This morning, Eurostar said it hoped later services could run but it has now cancelled all 41 trains.
All Southeastern’s high-speed services to Ebbsfleet, which use the same line, have also been cancelled.
I know the tunnel shouldn’t flood, but Eurostar don’t seem to have an adequate emergency plan to keep things moving, when it does.
The plan would obvious depend on where and what the problem was, but if something goes wrong at the London end of High Speed One, then surely the remaining infrastructure should be used to run an emergency service.
With flooding in the tunnel between Stratford International and Ebbsfleet International, trains could only run as far as Ebbsfleet, but surely an hourly shuttle could be run between Ebbsfleet and both Brussels and Paris.
The problem would surely be getting travellers between St. Pancras and Ebbsfleet International.
- There can be no trains between Central London and Ebbsfleet International, as the tunnel is flooded and can’t be used.
- Rail replacement buses would be difficult to organise at such short notice.
- I doubt rail replacement buses could be run from St. Pancras station, as traffic is generally solid in the area of the station at all times.
The nearest station to Ebbsfleet International is Northfleet station, which has four trains per hour (tph) to and from London; two each to St. Pancras and Charing Cross.
I have walked between Ebbsfleet International and Northfleet stations, but in times of disruption, I’m sure buses operating a shuttle would be better.
The Wikipedia entry for Northfleet station, explains, why the pedestrian link has not been built, in this paragraph.
The station is very close to Ebbsfleet International station (the NNE entrance is only 334 yards (305 m) from Northfleet’s station), but passengers (using public transport) will find it far easier to access Ebbsfleet International from Gravesend or Greenhithe, as these stations are more accessible and offer easy access to Fastrack bus services. The walking route between the two stations is 0.6 miles (1 km) or 0.8 miles (1.3 km) and a suitable pedestrian link has not been built because of funding issues and objections from Land Securities.
Perhaps after the pantomime this Christmas, the connection will be improved.
So4’s Law will probably mean, that if it is built, it will only be used by travellers and those working at Ebbsfleet International station for whom it is more convenient.
Firm Develops Jet Fuel Made Entirely From Human Poo
The title of this post, is the same as that of this article on the BBC.
This is the sub-heading.
A new aviation company has developed a type of jet fuel made entirely from human sewage.
These are the first three paragraphs.
Chemists at a lab in Gloucestershire have turned the waste into kerosene.
James Hygate, Firefly Green Fuels CEO, said: “We wanted to find a really low-value feedstock that was highly abundant. And of course poo is abundant.”
Independent tests by international aviation regulators found it was nearly identical to standard fossil jet fuel.
It certainly seems to have a lot going for it.
I have some other thoughts.
What About Disposable Nappies?
I wrote Are Disposable Nappies A Wasted Resource?, about making hydrocarbon fuels from disposable nappies.
Should Disposable Nappies Be Collected Separately?
My food waste is collected separately in a special bin. Hackney Council say this is what happens to food waste.
Food waste from households in Hackney is sent to an anaerobic digestion facility in south east England, where it’s turned into renewable energy to power homes and biofertiliser to be spread on local farmland to grow crops.
Surely, a similar or appropriate process could be used for disposable nappies.
Biomethane From Sewage Works
In Centrica Signs UK Biomethane Agreement With Yorkshire Water And SGN Commercial Services, I wrote about how Centrica have found a way to distribute biomethane from sewage works using the UK’s gas grid.
Could Firefly take the solids and Centrica the biomethane?
Given that water companies are regularly blamed for spilling sewage could there be an opportunity for a large sewage works to be a major producer of green fuels for agriculture, aviation, industry and road transport.
‘Rollercoasters In My Back Yard’: Welcome To Universal Studios Bedford
The title of this post, is the same as that of this article on The Times.
This is the sub-heading.
Britain’s answer to Orlando could be a 480-acre world boasting big rides, bigger films and 7m visitors a year. Some locals are far from enchanted
These three paragraphs introduce the story.
Picture the scene: It’s a snowy Christmas Eve, 2030, at King’s Cross station. Dozens of families from across the UK and Europe gather as the station speakers announce: “The train now leaving platform 9¾ is the Hogwarts Express, calling at the Wizarding World of Harry Potter. And Bedford.”
The stuff of JK Rowling’s fiction? Perhaps not.
For, if all goes to plan, a featureless 480 acres of industrial and agricultural land a short broomstick’s ride from downtown Bedford will, by the end of the decade, become one of the world’s most spectacular theme parks.
I have a few thoughts.
Eden Project Morecambe
Eden Project Morecambe will be the first of a new generation of theme parks in the UK.
The new Eden Project is to be developed at Morecambe, which is close to Lancaster. As Lancaster will be an High Speed Two terminus, Eden Project North could be connected to HS2 by a high tech shuttle like the Luton DART. So the Eden Project North will also attract day trippers from a large proportion of England and the South of Scotland.
I believe increasingly we will see theme parks, bringing in their visitors on futuristic public transport systems.
The Location Of Universal Studios Bedford
This map from Universal Destinations & Experiences shows the location of the site of the proposed Universal Studios Bedford.
Note.
- The site is shown by yellow shading.
- The blue lines are major roads.
- The pink lines are railways.
- The rail link running to the West of the site is currently the Marston Vale Line, which is being developed into the East West Railway between Oxford and Cambridge via Milton Keynes.
- The East West Railway will also connect to Ipswich, Norwich and Reading.
- The rail link running to the East of the site is the Midland Main Line, which links St. Pancras station with Derby, Nottingham and Sheffield.
The site certainly has excellent transport connections.
Expanding Rail Connections At Universal Studios Bedford
I believe that in these days of climate change, that theme parks and other attractions like sports stadia and shopping centres will develop their rail connections.
Universal Studios Bedford could have two stations.
- Kempston Hardwick on the East West Railway.
- Their own station on the Midland Main Line.
Note.
- Both stations could be connected by a futuristic people mover transporting visitors around the site.
- Using current train times, trains would take thirty minutes between the theme park and St. Pancras for Eurostar to and from Europe.
- Thameslink’s trains could shuttle visitors to and from Luton Airport.
It should also be noted that several of Southern England’s most visited sites are just a train ride away.
Easy Places To Visit
These attractions would be easy to visit.
- Bicester Village – Direct train from Kempston Hardwick after 2024.
- Cambridge – Direct train from Kempston Hardwick after 2030.
- London – Direct train from the new station after it’s built.
- Oxford – Direct train from Kempston Hardwick after 2024.
- Woburn Safari Park – Direct train from Kempston Hardwick after 2024.
Note.
All trains would be electric or battery-electric powered.
I have assumed that rail services between Oxford and Bedford open in 2024.
I have assumed that rail services between Oxford and Cambridge open in 2030.
Conclusion
This is an interesting idea, which is at an excellent location. But will the locals like it?
Extra Capacity On The Elizabeth Line At Tottenham Court Road Station
When I go to Oxford Street, I generally use the Elizabeth Line from Moorgate.
- If I need the Western end of Oxford Street, I use the Western entrance of Bond Street station.
- If I need John Lewis or Leon in Hanover Square, I use the Eastern entrance of Bond Street station.
- If I need the Eastern end of Oxford Street or Marks & Spencer at the Pantheon, I use the Western entrance of Tottenham Court Road station.
- If I need Tottenham Court Road or the British Museum, I use the Eastern entrance of Tottenham Court Road station.
Today, as I was going to Marks & Spencer at the Pantheon, I used the Western entrance of Tottenham Court Road station.
It wasn’t very busy and the tunnels and escalators were easily coping with Christmas shoppers.
But if Crossrail 2 ever gets built, Tottenham Court Road station could be the only interchange between the Elizabeth Line and Crossrail 2.
So I was pleased to see that someone had had the foresight to leave space for a fourth escalator at the Western entrance of Tottenham Court Road station.
I took these pictures as I returned.
A fourth escalator could easily be fitted on the right of the escalator on which I descended.
Bedford Depot’s Massive Solar Roof Helps Thameslink On Way To Net Zero
The title of this post, is the same as that of this article on RailUK.
These four paragraphs give full details of the project.
Work has begun installing one of Bedford’s biggest solar arrays – on the roof of Govia Thameslink Railway’s (GTR’s) train depot, in Cauldwell Walk.
Almost 1,000 photovoltaic panels (932) will generate 322 MWh of electricity a year – enough to power 120 homes every year, saving more than 66 tonnes of CO2e. They form part of GTR’s commitment to become carbon ‘net zero’ for all its energy needs by 2050.
The solar roof – one of four at different depots across GTR’s vast 11 county network – is being installed by not-for-profit community climate action group Energy Garden.
When it comes online in the New Year, Energy Garden will sell half the solar electricity to GTR to power the depots and plough profits from selling what’s left over into community development projects – Energy Garden already works with more than 50 community groups.
This Google Map shows the location of Bedford Cauldwell Park TMD with respect to Bedford station.
Note.
Bedford station is at the top of the map.
Bedford Cauldwell Park TMD is marked by the red arrow.
This second map shows the depot to an enlarged scale.
Note.
- The map appears to show several roofs, that could be candidates for solar panels.
- At least one shed sells cars. Do they sell electric ones?
As the rail depot appears to be the largest building of its type in the centre of Bedford, in the future will it be serving as a advert for Energy Garden?
This project sounds like a good idea.
And I like the way it’s financed.
Getlink To Enable The Doubling Of Direct High Speed Rail Services From The UK Over The Next 10 Years Via The Channel Tunnel
The title of this post, is the same as that of this press release from Getlink.
This is the sub-heading.
This doubling will be achieved by reducing the “time to market” from 10 to 5 years for operators who intend to launch new services between London and Cologne, London and Frankfurt, London and Geneva, London and Zurich.
These three paragraphs introduce the press release.
On 6 May 2024, Eurotunnel, a wholly owned subsidiary of Getlink, will celebrate 30 years since the opening of the Channel Tunnel and the introduction of the first LeShuttle and LeShuttle Freight rail services linking Folkestone (Kent)to Coquelles (Pas-de-Calais). This year will also mark the 30th anniversary of the first direct rail links between London and Paris, and London and Brussels.
Three decades after this pioneering step forward in Europe’s rail network, and in the wake of the development of the recently introduced link between London and Amsterdam, Eurotunnel is aiming to further accelerate the low-carbon mobility of people between the UK and continental Europe by doubling the number of new direct destinations from London via the Channel Tunnel over the next 10 years.
The reduction in the time needed to launch new services to just 5 years is the fruit of the work by Eurotunnel, the infrastructure manager and keystone of the cross-Channel high-speed links, in cooperation with partners from across the European ecosystem (infrastructure managers, authorities, manufacturers, regulators).
Getlink will use these four steps towards simplification.
- Market research carried out by Eurotunnel to identify destinations.
- Standardisation of Tunnel regulations with the relevant authorities.
- Integration of tunnel specific criteria with manufacturers in their standard rolling stock offering.
- Preparing cross-Channel connections with network operators and stations.
It will be so good to have more services between London and Europe.
Great Western Railway Updates EHRT On Its Upcoming Operational Trial Of Fast Charge Tech
The title of this post, is the same as that of this article on Electric and Hybrid Rail Technology.
This is the sub-heading.
Great Western Railway’s senior program manager, Sonya Johns, speaks to Electric & Hybrid Rail Technology about the firm’s progress on developing ex-Vivarail Fast Charge technology for battery-powered trains, ahead of operational trials due to commence in 2024.
The article is a must-read as it describes the progress since First Group, acquired the assets and intellectual property of Vivarail and its Fast Charge battery train technology.
This paragraph describes the components of the Fast Charge technology.
The Fast Charge system consists of three key components: retractable charging shoe gear, which is mounted to the underframe of the train; short (4m) charging rails mounted between the underframe of the train; and the Fast Charge Battery Bank (FCBB) installed beside the track, acting as an energy buffer between the train and the grid.
This paragraph outlines the benefits of the system.
The Fast Charge system has several benefits, according to Johns, including high charging power, enabling the train to be recharged in around 10 minutes; a standard DNO connection, avoiding costly power supply upgrades; full automation, with no driver interaction required; low safety risk (the charging rails are never live unless fully covered by the train); and minimal disruption during installation, as the FCBB is manufactured offsite and the charging rails are attached to existing sleepers.
This sounds like a system, that has been designed by someone fed up with regulators saying no to innovative ideas.
Other points from the article include.
- The shoe gear has been designed to be easily installed on any rolling stock.
- The one-year trial of the Fast Charge technology and the Class 230 battery train on the West Ealing and Greenford line will commence in spring 2024.
- GWR will capture and analyze data during the trial to understand how the technology performs in different conditions.
The article finishes with this paragraph.
The work, according to GWR, is part of its commitment to reduce the carbon emissions of its train fleet with a view to removing all diesel-only traction from the network by 2040, in line with the Government’s Transport Decarbonisation Plan.
Adrian Shooter would have been pleased if he was here to see it.
Northumberland Council To Campaign For Better Rural Train Services
The title of this post is the same as that of this article on Rail Advent.
These are the first three paragraphs.
In response to the reduction in the number of trains serving Morpeth and Berwick in the new East Coast Main Line timetable, Northumberland County Council has pledged to continue campaigning hard for improved rail services for communities along the line and beyond.
Councillor Glen Sanderson said the new timetable “Sacrifices the North east’s rail connectivity in order to improve it for the rest of the country.”
The new timetable was due to be introduced last May 2023, but was deferred after the North East Joint Transport Committee said that it was wholly unacceptable. However, the new timetable shows very little improvement from the original. Although more frequent trains will operate between London and Edinburgh, not all of them will stop at Morpeth or Berwick, which are the services the council has been fighting hard for as they are key population centres.
The problems are that between Newcastle and Edinburgh are.
- The railway is only double-track all of the way, with a passing loop South of Berwick.
- The maximum speed is 125 mph for about 40 % of the track, 100/110 mph for another 30 %, with the rest slower.
- Berwick, Morpeth and the new stations at East Linton and Reston are only two platform stations.
The capacity needs to be increased, so that more trains can use the line.
These are my thoughts.
Install Digital Signalling
It has been claimed that digital signalling will add another train per hour (tph) between Stevenage and Doncaster.
So if it was able to do the same between Newcastle and Edinburgh, it might be the first solution to try.
All Passenger Trains Capable Of Running At 125 mph
In Call For ETCS On King’s Lynn Route, I outlined the problem with fast services to Cambridge, Ely and Kings Lynn, where the rains will need 125 mph capability to keep out of the way of LNER’s Azumas on the East Coast Main Line.
There will be a similar problem between Newcastle and Edinburgh.
Improve The Tracks
This would improve more sections of 125 mph running and perhaps better turnbacks at Morpeth and Berwick.
Conclusion
Quite a bit of work will need to be done to get the timetable to the standard the customers require.
National Grid Fast-Tracks Overhead Line Upgrade Project To Help Accelerate Connection Dates Of 175 Clean Energy Projects
The title of this post, is the same as that of this press release from National Grid.
These four bullet points, act as sub-headings.
- £90 million upgrade of 82km of overhead power line between Bramley in Hampshire and Melksham in Wiltshire brought forward by a year
- Replacing the conductors (wires) between transmission towers (pylons) will allow them to operate at a higher temperature and therefore carry more electricity
- Increased capacity could help to accelerate the grid connection of 175 clean energy projects in South West England and Wales
- Project forms part of a series of National Grid measures to help speed up connections to the electricity network, including working with the Electricity System Operator (ESO) and industry to reform the connections process
These are the two opening paragraphs.
National Grid has accelerated engineering works to address a bottleneck in connecting low carbon projects to the electricity network in South West England and Wales.
The 82km upgrade of one its high voltage overhead electricity lines, between Bramley in Hampshire and Melksham in Wiltshire, has been brought forward to help accelerate the connection of 175 clean energy projects to the grid.
I am rather surprised that upgrading of just 82 km. of overhead power line will enable the connection of 175 clean energy projects.
- So perhaps, National Grid are upgrading this line first, as it is the best value.
- I have followed the line of pylons on a map and it connects two large sub-stations at Bramley and Melksham.
- It will be interesting to see how the 175 projects connect to the grid.
There is also this paragraph.
This upgrade follows National Grid’s recent announcement of accelerating up to 20GW of grid connections across its transmission and distribution networks (the equivalent capacity of six Hinkley Point C nuclear power stations), including accelerating 10GW of battery storage projects by up to four years.
I wrote about this announcement in National Grid To Accelerate Up To 20GW Of Grid Connections Across Its Transmission And Distribution Networks.
Conclusion
National Grid seem to have made a start like like a hare and I suspect we’ll see the announcement of more projects in the near future.












