In Battersea Power Station Station Opens, I talked about the scale of the new Battersea Power Station station.

  • It looks like it could have three entrances.
  • It’s got four escalators and two lifts to go to down to platform level.
  • It has two terminal platforms.

I feel it has been designed to handle as many passengers and trains as Morden station.

  • Morden station has five platforms.
  • The station is step-free.
  • The station handles ten million passengers per year.

The signalling can handle up to thirty trains per hour (tph) to Morden.

It looks to me that Battersea Power Station station has been designed to be big enough to take half the trains from North London with ease.

The Bank Station Upgrade

In the Bank Station Upgrade, nearly a mile of new train tunnel and several shorter pedestrian tunnels were built.

They were dug not with a tunnel boring machine, but by traditional methods, that would have been understood by Brunel; pick and shovel, but probably assisted by the best modern electrical diggers and trucks.

I would expect that any tunnelling needed to split the Northern Line will not use a tunnel boring machine.

The Northern Line will be going back to the future.

The Proposed Split

There has been talk of splitting the Northern Line into two separate lines for some years.

  • The Western Line (Charing Cross Line) would run between Edgware and Battersea Power Station via Camden Town, Euston, Charing Cross and Kennington.
  • The Eastern Line (Bank Line) would run between High Barnet and Morden via Camden Town, Euston, Bank and Kennington.

Note.

  1. I will call the two lines the Bank and Charing Cross Lines.
  2. Both lines could have Victoria Line frequencies of at least thirty tph.
  3. It is generally felt that the split would need a rebuild at Camden Town station to handle the extra passengers.
  4. Camden Town station also needs better access between the trains and the street.
  5. There would need to be better connections at Kennington and Euston stations.

Surely, the main advantages of the split would be as follows.

  • Trains on both lines would go end-to-end without crossing a junction, where signals and points were constantly switching trains. This is why the Victoria Line can handle more than thirty-three tph.
  • Trains will run at Victoria Line frequencies on both lines.
  • All trains at Camden Town and Kennington stations would use a route without points to go as fast as possible through the station.
  • Eliminating the points, would make both lines more reliable.
  • Euston station will have upwards at least sixty tph connecting it to Crossrail.

Effectively, the new Bank and Charing Cross Lines would be able to perform just like Dear Old Vicky.

I will now look at where work needs to or could be done to successfully split the two lines.

Kennington Station

In Could Access Between Platform And Train Be Improved At Kennington Station?, I outlined how passengers might use Kennington station to change between the Bank and Charing Cross Lines.

I developed this rule.

The rule would appear to be if you’re on one line and are going to a station on the other, you change at Kennington station.

Staff would need to be on the platform to help those, who were changing direction.

But I do think changing can be made to work well with step-free access between train and platform on all four platforms at Kennington station.

It will be interesting to see, what proportion of train changes at Kennington are simple cross-platform changes, where there is no use of the steep stairs. I think it could be quite high.

I believe Kennington station will grow into a very smooth interchange between the Bank and Charing Cross Lines.

Although, there’ll be a problem for some time, if you’re in a wheelchair and want to go between Morden and Battersea Power station.

This could be solved by lifts between each pair of platforms and the intermediate level passage, which connects to the lifts to the surface.

The Camden Town Problem

This map from cartometro.com shows the lines around and through Camden Town station.

Note.

  1. Camden Town station has four platforms.
  2. The Eastern pair are under Kentish Town Road and connect to High Barnet in the North.
  3. The Western pair are under Camden High Street and connect to Edgware in the North.
  4. In each pair of tracks the Northbound track is above the Southbound track.
  5. There is a level passage between the two Northbound tracks, so it is an easy interchange, if you’re on the wrong train going North.
  6. The passage between the two Southbound tracks has stairs at either end, if you want to change Southbound trains at the station.

But the real problem lies South of the station; the horrendously complicated Camden Town Junction.

The junction must be able to handle trains going between the following stations.

  • Bank and Edgware
  • Bank and High Barnet
  • Charing Cross and Edgware
  • Charing Cross and High Barnet

Note in the map, that the High Barnet tracks dive under the Edgware tracks so they can form two separate pairs of tracks to Euston, only one of which goes via Mornington Crescent.

If there was a similar junction on the motorways of the UK or the Interstate Highways of the US, it would have years ago been simplified.

The split will mean the following.

  • The Eastern pair of platforms will still be connected to High Barnet as now, but will also be directly connected to the tracks that go directly to Euston and on to Bank.
  • The Western pair of platforms will still be connected to Edgware as now, but will also be directly connected to the tracks that go to Euston via Mornington Crescent and on to Charing Cross.
  • Camden Town Junction could be seriously simplified, with perhaps the ability to swap between routes only available for depot and engineering movements.

I do suspect, it would also mean all trains from High Barnet will go via Bank and all trains via Edgware will go via Charing Cross.

  • A proportion of passengers would have to change at Camden Town.
  • Both routes would connect to High Speed Two at Euston.
  • Both routes connect to the Central, Jubilee, Piccadilly and Victoria Lines.
  • Improvements promised for Euston will give better access to the Sub-Surface Lines.

I think it will be a case of winning some good routes and losing others. Disgusted from Finchley might complain.

But then there will be Crossrail, which as it connects to both lines at Tottenham Court Road and Moorgate could give serious advantages.

The split isn’t without passengers who will object to losing their preferred route.

Camden Town Station

This document on TfL’s web site gives more details of the proposed capacity upgrade at Camden Town station. This schematic of the tunnels, platforms and walkways shows how the station could look in a few years time.

Note.

  1. New tunnels are shown in light grey.
  2. Existing tunnels are shown in dark grey.
  3. The Northbound platforms are above the Southbound ones.
  4. The tunnels in the foreground are those of the Charing Cross Line.
  5. The far tunnels are those of the Bank Line.
  6. The new Buck Street entrance is labelled 8.
  7. There is a new pedestrian tunnel between the two Northbound Lines.
  8. Below it is a new tunnel between the two Southbound Lines.
  9. There is an existing passage linking the four lines.

The full upgrade is very much on the back burner, but could Camden Town station be upgraded with the proposed extra cross passages.

  • These would enable passengers to change lines easily on the level.
  • Passengers changing between the Bank and Charing Cross Lines could be kept away from the existing escalators and the space at their bottom.
  • The tunnels would increase the circulation area.
  • The tunnels would be part of the new Buck Street entrance if it were to be built.

I feel with improved cross-platform interchange, Camden Town could function as an interchange station between the Bank and Charing Cross Lines.

A similar rule as I used for Kennington station would apply for passengers.

The rule would appear to be if you’re on one line and are going to a station on the other, you change at Camden Town station.

Staff would need to be on the platform to help those, who were changing direction.

But it would be a more comprehensive and easier interchange than Kennington, as all changes would be without steep stairs.

Once Camden Town station is working well with the new cross passages, I would then get a developer to put a large development on the proposed site of the Buck Street entrance, with a new entrance with lifts and escalators underneath, that reached down to the new cross tunnels.

After what the contractors did at Whitechapel, I suspect this could be achieved, whilst keeping the trains running and leaving the existing Camden Town station intact.

This Google Map shows the area between Camden Road and Camden Town stations.

Note.

  1. Camden Road station on the North London Line is in the North-East corner of the map.
  2. Camden Town station is at the bottom of the map towards the West.
  3. The Charing Cross Line to Edgware is under Camden High Street.
  4. The Bank Line to High Barnet is under Kentish Town Road.
  5. Buck Street is to the North of Camden Town station connecting Camden High Street and Kentish Town Road.
  6. The red-roofed building in Buck Street is the former Hawley School, which is now owned by Transport for London and is earmarked for the new station entrance.
  7. The Regent’s Canal, which has a convenient towpath, runs East-West across the map.
  8. A lot of development is happening on the North bank of the canal.

The map doesn’t show how difficult it is to walk between the two stations along the busy Camden Road.

In Between Camden Road And Camden Town Stations Along The Canal, I walked between the two stations along the canal and then up Kentish Town Road. It took me fourteen minutes in total with seven minutes between the canal and Camden Town station.

I believe the following will happen.

  • People living and working in the new developments will need access to Camden Town station.
  • The Regent’s Canal towpath will be updated into a safer walking route between Camden Lock and Camden Road station, that serves a lot of the developments.
  • More tourists will need to get to Camden Lock and the markets.

These will increase the need for extra capacity at Camden Town station.

The only way it will get built is by a private developer, who puts a lot of housing on the Buck Street site and sells it as quality housing in an iconic location.

A lot of politicians won’t like it, but solving the problems at Camden Town station, which is an overcrowding accident waiting to happen, is more important than their egos.

These pictures show some of the features of Camden Town station.

I believe Camden Town station could grow quickly into a very smooth interchange between the Bank and Charing Cross Lines.

In a few years time, when the Buck Street entrance is built, the capacity problems will be on their way to solution.

Finally, once the Buck Street entrance is complete, the original station can be refurbished.

 

Euston Station, Crossrail, Crossrail 2 and the Northern Line

Consider.

  • Euston station is a very busy station and it will be even busier, when High Speed Two opens.
  • Crossrail 2 will not be built before High Speed 2 opens.
  • The Victoria Line doesn’t connect to Crossrail.
  • The only connection between Euston station and Crossrail are the two branches of the Northern Line.

Splitting the Northern Line into the Bank and Charing Cross Lines will increase the number of Northern Line trains through Euston to at least sixty tph, if both lines can handle Victoria Line frequencies.

It looks to me, that making the Northern Line step-free at Euston is the best short-term alternative to building Crossrail 2.

Euston Station

Euston station is the third station, where the Bank and Charing Cross Lines connect.

This map from cartmetro.com shows the Northern Line through Euston station.

Note.

  1. The Northern Line is shown in black.
  2. The Victoria Line is shown in blue
  3. The Sub-Surface Lines are shown in purple and yellow.

In the map, the platforms are as follows going from top to bottom.

  • Platform 1 – Northbound – Northern – Charing Cross to Camden Town
  • Platform 2 – Southbound – Northern – Camden Town to Charing Cross
  • Platform 6 – Southbound – Northern – Camden Town to Bank
  • Platform 5 – Northbound – Victoria – Victoria to Walthamstow
  • Platform 4 – Southbound – Victoria -Walthamstow to Victoria
  • Platform 3 – Northbound – Northern – Bank to Camden Town

It  is a bit unusual as the cross-platform interchange between Bank and Victoria Lines involves a change of direction.

With the development of Euston station for High Speed Two, I am sure interchange between the two branches of the Northern Line and the other lines at Euston will be made step-free.

Plans have already been published that will connect Euston Square station and Euston station. I wrote about it in The New Step-Free Entrance At Euston Square Station.

These pictures are of Euston station.

I feel the wide Platform 6 could give scope for innovation.

Level Access Between Train And Platform

I believe that many platforms on the Northern Line can be modified to give level access between train and platform.

In Could Access Between Platform And Train Be Improved At Kennington Station?. I outlined how it could be achieved at Kennington station.

At Kennington station, all platforms are straight and this is a prerequisite to making the access level.

I also feel that any straight platform with a Harrington Hump could effectively be given a full length hump.

I suspect that a lot of stations could be converted to level access between train and platform

Conclusion

I believe that splitting the Northern Line would be very worthwhile.

 

 

 

 

 

 

 

September 27, 2021 Posted by | Transport/Travel | , , , , , , , , , , , , , , , | Leave a comment

The New Step-Free Entrance At Euston Square Station

This map from cartometro.com shows the Underground Lines in the Euston station area.

Note.

  1. The Northern Line is shown in black.
  2. The Victoria Line is shown in light blue.
  3. The sub-surface lines are shown in yellow and mauve.
  4. The Northern and Victoria Lines are deep underneath the station, whereas the sub-surface lines are under Euston Road.

This Google Map shows the area and the positions of the station entrances.

Note.

  1. Warren Street station in the South West corner of the map at the Northern end of Tottenham Court Road.
  2. Euston Road running South-West to North-East across the map.
  3. University College Hospital is on the South side of Euston Road between Tottenham Court Road and Gower Street.
  4. There is a subway under Euston Road almost in line with Gower Street, that gives access to the Western ends of the platforms at Euston Square station.
  5. There is a lift to the station from the South side of Euston Road on the Eastern side of Gower Street.
  6. The Western end of the platforms at Euston Square are probably just to the East of Gower Street.

The next road across Euston Road is Gordon Street, where the entrance to a new subway under Euston Road to Euston station will be located.

This Transport for London visualisation shows the entrance to the subway looking towards Euston station.

This diagram of the subway. is from Ian Visits,

Note the platforms at Euston Square station appear to be shown in red and end to the West of Gordon Street.

I took these pictures at the Eastern end of Euston Square station.

Note what look like bricked off areas at the end of the platforms for electrical and other gubbins. I suspect they could be removed to create more space.

Conclusion

I don’t think that connecting the platforms to the subway will be the most challenging of projects, if they can dig easily behind and over the walls of the Victorian tunnel and behind the platforms.

 

March 31, 2021 Posted by | Transport/Travel | , , , | 4 Comments

London Will Still Need Crossrail 2 To Deal With HS2 Influx, London Mayor Predicts

The title of this post, is the same as that of this article on Building.

This is the first paragraph.

Sadiq Khan says he expects mothballed scheme will eventually get built.

I don’t disagree that it will eventually get built, but it will be long after both Sadiq Khan and myself have gone.

You might think, that as I live in Dalston, I would be very much in favour of Crossrail 2 being built as soon as possible.

But then, I’m a duck-and-diver and there will always be a quick route to get to Euston.

I currently use four routes regularly and coming home, if it’s late or I want to get home quickly to cook supper say, I can take a taxi for a reasonable price.

The easiest way is actually to walk about two hundred metres and get a 73 bus to directly outside Euston station.

I very much feel we need to improve access in London to High Speed Two and that this can be done by making sure several smaller projects are completed before High Speed Two opens.

Improved Underground Connections At Euston Station

This page on the High Speed Two web site, says this about the station layout and Underground connections at the rebuilt station.

HS2 will deliver eleven new 400m long platforms, a new concourse and improved connections to Euston and Euston Square Underground stations. Our design teams are also looking at the opportunity to create a new northerly entrance facing Camden Town as well as new east-west links across the whole station site.

I would suspect that connection to the Underground will have step-free options.

I wrote about Underground connections at Euston station in Ian Publishes Details Of Future Developments At Euston And Euston Square Underground Stations.

The developments certainly look comprehensive and include a new entrance in Gordon Street on the South side of Euston Road.

Note.

  1. The view is looking North.
  2. A tunnel from this entrance will lead to the Eastern ends of the platforms at Euston Square station, where it appears there will be at least escalator access.
  3. The tunnel will also lead into Euston station.
  4. It is a simple improvement, that shouldn’t be too challenging.

This diagram shows the layout of the tunnel.

It looks to me to be a neat design, that could be installed between Gordon Street and Euston Square stations without disturbing the traffic on the busy Euston Road.

Once the subway and the Gordon Street entrance were built, there would have these benefits.

  • There would be a step-free route between Euston and Euston Square stations.
  • It would be a shorter walk  in an air-conditioned tunnel, rather than currently along the very polluted Euston Road.
  • It would be the fastest way to transfer between Euston and Kings Cross or St. Pancras stations.
  • It would give excellent access to the other London terminal stations of Liverpool Street, Moorgate and Paddington.
  • It would give step-free access to Crossrail at Farrington, Liverpool Street, Moorgate, Paddington and Whitechapel
  • With a change at Farringdon or Liverpool Street to Crossrail, it would offer the fastest route to Canary Wharf.
  • The Gordon Street entrance would improve walking routes between Euston station and University College London and other buildings on the South side of Euston Road.

I also suspect that as this project is part of the rebuilding of Euston station for High Speed Two, that it will be completed before Euston station opens for High Speed Two.

If possible, it should be built much sooner to improve access between Euston station and the sub-surface lines.

Once open, even without other improvements at Euston station, this subway would improve access to Euston station by a very substantial amount.

Camden Town Station Upgrade

In 2015, I went to see an exhibition about the proposed expansion of Camden Town station and wrote The Camden Town Station Upgrade Exhibition.

I believe this upgrade should be delivered before High Speed Two opens around the end of this decade.

But due to the financial problems of Transport for London, this project has now been kicked into the long grass.

The Wikipedia entry for Camden Town station, states that upgrading the station will take four years.

Northern Line Split

The completion of the Camden Town Station Upgrade will enable the splitting of the Northern Line into two separate lines, after the completion of the Northern Line Extension to Battersea and the Bank Station Upgrade.

  • Northern Line West – Edgware to Battersea Power Station via Camden Town, Euston, Charing Cross and Waterloo.
  • Northern Line East – High Barnet to Morden via Camden Town, Euston, Kings Cross, Moorgate, Bank and London Bridge.

Each branch will be running at least 24 trains per hour (tph) and will significantly increase capacity between High Speed Two and other terminal stations and the City of London.

The Northern Line should be split into two lines by the time High Speed Two opens, but with no start date in sight for the Camden Town Station Upgrade, this might not be possible.

Victoria Line Improvements

The Victoria Line or Dear Old Vicky probably won’t be able to help much, but I do think it would be feasible to improve the three most inadequate stations on the line.

I doubt the money can be found to carry out these improvement projects, that are essential, but very much smaller than the Camden Town Station Upgrade.

Sub-Surface Lines Improvements

The big project on the Circle, District, Hammersmith & City and Metropolitan Lines is the Four Lines Modernisation (4LM) project.

  • It is an upgrade of the trains, track, electrical supply, and signalling systems.
  • This will add 27 % more capacity in the Peak.
  • As anybody will know, who has been to a major event at Wembley Stadium, the new S8 Stock trains, that have been running for a few years now, have an almost infinite capacity.
  • Incidentally, the S8 Stock trains hold 1350 passengers, which is not far short of the 1500 that each Crossrail Class 345 train can hold.
  • Euston Square station will have a step-free connection from the rebuilt Euston station complex.

Most of the Modernisation will be completed by 2023.

I believe that the sub-surface lines will become the main method to get to and from the upgraded Euston station, until Crossrail 2 is built.

  • There will be direct trains to around seventy stations from Euston Square station.
  • With a change at Paddington to Crossrail, there is a route to Heathrow Airport and Reading.
  • With a change at Farringdon or Liverpool Street to Crossrail, there is a route to East London, Canary Wharf and South East London.
  • With a change at Farringdon to Thameslink, there are routes to over a hundred stations.
  • With a change at Whitechapel to the East London Line, there are routes to North, East and South London.

When you consider that the Metropolitan Line opened in 1863 and was the first passenger-carrying underground railway in the world, hasn’t it done well?

When the Euston Square station upgrade is complete, I will probably use that route to get home from Euston, changing on to a bus at Moorgate, which stops close to my house.

Old Oak Common Station

High Speed Two’s Old Oak Common station is introduced like this on this page on the High Speed Two web site.

Old Oak Common is a new super hub set to be the best connected rail station in the UK.

This map from Transport for London shows the various lines at the station.

Note.

  1. The bright blue line is High Speed Two.
  2. The purple line is the Great Western Main Line and Crossrail.
  3. I suspect that the interchange between these three lines will be a good one.
  4. Will all Great Western services stop at Old Oak Common station?
  5. The orange lines are London Overground services, with two new stations; Old Oak Common Lane and Hythe Road close to the main Old Oak Common station.
  6. The green line is the Southern service between Milton Keynes and South Croydon.
  7. The red line is the Central Line and it could be joined to the main station.
  8. There are plans for a West London Orbital Railway, from Brent Cross and West Hampstead in the North to Hounslow and Kew Bridge in the West, that would call at the main Old Oak Common station.

Old Oak Common station could be well connected to most of London, through its Crossrail. London Overground and West London Orbital connections.

It is my view that these three smaller projects must be completed before the opening of High Speed Two.

  • Hythe Road station
  • Old Oak Common Lane station
  • West London Orbital Railway.

None of these three projects would be very challenging.

Chiltern Railways And High Speed Two

Chiltern Railways already have a London Marylebone and Birmingham Moor Street service

Birmingham Moor Street station will be close to High Speed Two’s Birmingham Curzon Street station.

Plans exist for a second London terminus for Chiltern Railways close to the main Old Oak Common station.

  • Could Chiltern Railways become a partner for High Speed Two on routes like between Leeds and Banbury?
  • They could certainly bring passengers to Old Oak Common from Buckinghamshire, Oxfordshire and Warwickshire.
  • One of my principles on High Speed Two, is that it should be a One-Nation railway.

Old Oak Common would be a very different station to Marylebone with its very useful Crossrail. London Overground and West London Orbital connections.

The terminal for Chiltern Railways at Old Oak Common is another project that should be completed before the opening of High Speed Two.

The Duality Of Euston and Old Oak Common Stations

Euston and Old Oak Common stations could almost be considered to be one station.

  • All High Speed Two trains terminating or starting at Euston also call at Old Oak Common station.
  • They will be just five minutes apart.
  • Both stations have comprehensive networks of connections.
  • Taken together the connections from both stations cover most of London and the South East.

There could be advantages for both operators and passengers.

  • Would a ticket to and from London Terminals be usable at both stations?
  • For some London destinations, passengers might prefer to use one terminal or the other.
  • By changing at Old Oak Common to Crossrail will probably be the fastest way to Heathrow, the West End, the City, Canary Wharf and other places.
  • Passengers could make the decision about the London terminal to use en route.
  • Operators sometimes put the cleaning crew on the train at the last station before the terminal to save time in the turnround. The closeness of the two stations would enable this.

I think the London end of High Speed Two has been designed to make it easy for the operator and passengers.

The Losers If Crossrail 2 Isn’t Built

Crossrail 2 will provide better access to High Speed Two and the London terminals of Euston, Kings Cross, St. Pancras and Victoria for parts of London and the South East.

Victoria Line Passengers

The Victoria Line will have interchanges with Crossrail 2 at the following stations.

  • Tottenham Hale
  • Euston and Kings Cross St. Pancras on the Victoria Line and Euston St. Pancras on Crossrail 2
  • Victoria

Note.

  1. Crossrail 2 will relieve capacity on the Victoria Line between Tottenham Hale and Victoria
  2. There will be a very comprehensive interchange at Euston St. Pancras to serve High Speed Two, Eurostar and classic lines out of Euston, Kings Cross and St. Pancras.

From what has been disclosed about the connrection between Euston and Euston Square stations transfer between Euston and Kings Cross and St. Pancras will be a lot easier than it is now.

This reworking of the poor connection to Euston Square station might take some pressure off the Victoria Line.

It might also might be possible to squeeze more trains down Dear Old Vicky.

Passengers On The Suburban Lines Into Waterloo

The suburban lines into Waterloo will go into tunnel at Wimbledon and connect directly to Victoria, Euston, St. Pancras and Kings Cross.

This will be superb access for South West London to four major London terminals.

Without Crossrail 2, passengers  will have to use one of these routes to get to and from Euston.

  • Change at Waterloo to the Northern Line.
  • Change at Waterloo to the Bakerloo Line and then at Oxford Circus to the Victoria Line.
  • Change at Vauxhall to the Victoria Line.

Could it be, that the Northern Line Extension should be extended to Clapham Junction station, as it is an aspiration over a safeguarded route under Battersea Park?

In An Analysis Of Waterloo Suburban Services Proposed To Move To Crossrail 2, I showed it was possible to run a Crossrail 2 schedule of four tph into Waterloo station, if the following were done.

  • More platform capacity in Waterloo.
  • Modern high-performance 100 mph trains like Class 707 trains or Aventras.
  • Some improvements to track and signals between Waterloo and Wimbledon stations.
  • Wimbledon station would only need minor modifications.
  • A measure of ATC between Waterloo and Wimbledon stations.

This would not be a large project

Passengers In Balham And/Or Tooting

Crossrail 2 is planned to run between Wimbledon and Victoria via the following stations.

Note.

  1. Crossrail 2 should take pressure off the Northern Line.
  2. Public Opinion is against King’s Road Chelsea station. How will their cleaners, cooks and nannies get to work? Especially, as the roads in the area are already jammed by Chelsea tractors.
  3. The original route favoured Balham to give an interchange with National Rail. Tooting Broadway also has geological problems for the tunneling.
  4. On the other hand, Sadiq Khan supports the route through Tooting Broadway, which better serves his former constituency.

This Map from cartometro.com shows the rail lines in the area.

Note.

  1. Balham station in the North is an interchange station between the Northern Line and National Rail, with a possible four National Rail platforms.
  2. Tooting Broadway is a simple through station on the Northern Line.
  3. The next station after Wandsworth Common towards London is Clapham Junction.
  4. Transport for London have been advocating a new Streatham Common station, that would be an interchange between the lines through Streatham Common and those through Streatham.
  5. Streatham and Tooting stations are on the Wimbledon Loop Line, which only carries two tph in both directions.

Since I have been writing this blog, there have been several ideas to make better use of the National Rail lines in this area.

There was even a plan that I wrote about in 2016 called The Streatham Virtual Tube.

  • Trains would run through Streatham Common, Streatham, Streatham, Hill, Balham, Wandsworth Common, Clapham Junction and into Victoria.
  • Trains could also go North from Clapham Junction to Old Oak Common for High Speed Two.
  • The Streatham Common Interchange would be built. This would give a useful interchange to the Wimbledon Loop Line.
  • There would be four tracks through Streatham.
  • A tunnel would be build to allow trains to go through both Streatham and Streatham Hill stations.
  • It would have an interchange at Balham with the Northern Line.
  • It could have an interchange at Clapham Junction with an extended Battersea Branch of the Northern Line.
  • Suppose it had a frequency of perhaps six or even ten tph.

I think it might work, but it shows what can be done, with a bit of out-of-the-box thinking.

Passengers In Dalston And Hackney

One of the entrances to the proposed massive double-ended Crossrail 2 station at Dalston will be at the end of my road and very close to where my mother used to work and where her mother was actually born.

East London had not had major rail improvements since the 1950s and 1960s, when most of the lines into Liverpool Street were electrified and the Southbury Loop was reopened.

But since the creation of the Overground in 2007 from the remains of the ill-performing Silverlink, with the addition of new trains and ticketing and a good clean, there has been a series of smaller projects that have been completed, in and around East and North London.

Note.

  1. There have also numerous smaller upgrades like the addition of lifts to several stations.
  2. Stations between Stratford and Shenfield have been upgraded for Crossrail.
  3. There has also been considerable upgrades to the electrification, which in some places was not in the best of condition.
  4. Most lines have a frequency of four tph or more.

Some may feel that East London has done well with rail improvements in the last few years.

I would agree in some ways, but would counter by saying that before the Overground was created, East London’s were in a terrible state and their state today is a excellent example of what can be achieved by good design, planning and execution, without spending vast sums.

East London and the boroughs of Enfield, Hackney, Haringey, Newham and Waltham Forest in particular, now have a good rail network, that is going to get a lot better with the addition of Crossrail.

  • The North London Line is about half a mile to the North of where I live and can walk to two stations or get a bus to another three.
  • Crossrail will be a couple of miles to the South with station entrances at Moorgate, Liverpool Street, Whitechapel and Stratford.
  • There are four electrified railway lines with new trains, which run North-South with connections to the two East-West lines.
  • Although my quickest way to Crossrail will be a bus from close to my house to outside Moorgate station.
  • I suspect that everybody in the Borough of Hackney and the Eastern part of Islington will be able to get to a Crossrail station in well under thirty minutes.
  • In addition, from where I live the Gospel Oak to Barking Line runs a couple of miles North of the North London Line.

I believe that Dalston’s success over the last decade has been a collateral benefit of its comprehensive rail system, supported by lots of shiny new buses.

Does Dalston want Crossrail 2? Probably, Yes!

Does Dalston need Crossrail 2? Possibly, No!

Do other areas of large cities need Dalstonisation of their railway and bus systems? Absolutely!

I certainly don’t regret moving to Dalston!

Note that one of the reasons I’m so keen on the West London Orbital Railway is that it could do the same for North West London, as the Overground and the Lea Valley Lines have done for North East London.

Passengers Along The Lea Valley

Crossrail 2 will connect the Lea Valley Lines to Dalston and on to Central London.

It will involve the following changes to the West Anglia Main Line.

  • Four-tracking of the route at least as far as Broxbourne.
  • A junction South of Tottenham Hale station will connect the route to a tunnel to Dalston.
  • Level crossings at Brimsdown, Enfield Lock and Cheshunt will be removed.
  • Like Crossrail, stations would be substantially step-free.
  • The signalling will be upgraded to full in-cab digital ERTMS signalling, that is used by Crossrail and Thameslink under London.

This would enable 10-15 tph running between Tottenham Hale and Broxbourne stations.

With all the development going on around Cambridge and possible expansion of Stansted Airport, I believe that even if Crossrail 2 is not build, then there will be pressure to four-track the West Anglia Main Line, remove the level crossings and improve the stations and signalling.

If this were to be done, then there is an interim plan that could be implemented that I wrote about, four years ago in Could A Lea Valley Metro Be Created?

I envisaged the following.

  • Updating the West Anglia Main Line to four-tracks and a standard suitable for Crossrail 2.
  • Using the double-track loop at Stratford  as the Southern terminal, for some of the trains.
  • Updating the Victoria Line stations. The major interchange at Tottenham Hale station has already been improved substantially.
  • Providing an appropriate service between Stratford and Broxbourne stations.
  • Terminating some Stansted and Cambridge services in the Stratford Loop, as Stratford has better connections to South London and Kent than Liverpool Street.
  • Integrating Lea Valley Metro, London Overground and Greater Anglia services to Bishops Stortford, Cambridge and Hertford North stations.

Note.

  1. All services connect to Crossrail and the Central Line at the Southern end.
  2. Services to Liverpool Street connect to National Rail services, the Lea Valley Lines of the London Overground and the Circle, District and Metropolitan Lines.
  3. Services to Stratford connect to National Rail services, the North London Line of the London Overground and the Jubilee Line.
  4. Could alternate trains serve Liverpool Street and Stratford?
  5. Could splitting services between Liverpool Street and Stratford mean that the largest proportion of routes have just a single change?

As Transport for London and the train operating companies know where passengers want to go and actually go, I’m sure that a service pattern, that is acceptable to all could be created.

Conclusion

Crossrail 2 is quoted as being a £33 billion project.

I believe that with a good review lots of money could be saved and other smaller projects could be planned and executed to handle the expected increase in the number of passengers.

I would do the following.

  • Camden Town station – Upgrade
  • Chiltern Railways – Build their connection to Old Oak Common station
  • Euston Station – Improve connections to Euston and Euston Square Underground stations.
  • Northern Line – Extend the Battersea branch to Clapham Junction
  • Northern Line – Split Into Two Lines
  • Overground – Build Old Oak Common Lane and Hythe Road stations
  • Southern – Build the new Streatham Common station and implement The Streatham Virtual Tube.
  • South Western Railway – Run four tph on all proposed Crossrail 2 routes into Waterloo station
  • Victoria Line – Upgrade Highbury & Islington, Oxford Circus and Walthamstow Central stations and increase the frequency if possible
  • West Anglia Main Line – Upgrade ready for Crossrail 2 and develop the Lea Valley Metro

All of these projects would have their own benefits, whether Crossrail 2 is built or not!

Only when the needs of all passengers have been assessed in a few years, should we make a decision about Crossrail 2.

 

 

 

 

 

 

March 27, 2021 Posted by | Transport/Travel | , , , , , , , , , , , , , , , , , , , , , , , , | 8 Comments

Ian Publishes Details Of Future Developments At Euston And Euston Square Underground Stations

This post on the Ian Visits blog is entitled A New London Underground Entrance To Euston Station.

 

The Underground Lines In The Euston Station Area

This map from carto.metro.free.fr shows the Underground Lines in the Euston station area.

Note.

  1. The sub-surface lines run underneath the busy Euston Road.
  2. Platform 2 at Euston Square station has no lift or escalator.
  3. Platform 1 at Euston Square station has a lift, which also serves the subway.
  4. To connect between the sub-surface lines at Euston Square and the deep lines at Euston means a walk on the surface.
  5. Euston station only has two up and two down escalators and no lifts for the six deep-level platforms.
  6. To connect between the Bank and Charing Cross branches of the Northern Line is often along a very crowded passage.

This interchange has not been fit for purpose since the Victoria Line was built in the 1960s.

A Second Entrance To Euston Square Station

One of the key projects to unlock the interchange, is to create a subway from the current Euston station.

It will lead to a new entrance placed in the middle of Gordon Street.

The subway will have stairs, escalators and/or lifts to connect to the Eastern ends of the current Euston Square platforms.

Ian showed this diagram of the subway.

Note.

  1. It serves both platforms at Euston Square station.
  2. It looks to be reasonably wide and level.

These are some pictures I took on a walk round the area.

This is a possible future visualisation from Ian’s site.

The new Gordon Street entrance appears to be opposite the porticoed building, which is part of University College London.

  • The view is looking North, like the first three of my pictures.
  • Gordon Street appears to be at least part-pedestrianised.
  • Escalators are visible.

It looks to be a London version of Bilbao’s fosteritos.

Fosteritos are named after Norman Foster, as he or his practice designed the Bilbao Metro.

  • The escalators in Bilbao are longer than would be needed at Gordon Street.
  • I don’t think that fitting in a slimline lift would be difficult.

I like the fosterito concept and I feel a similar approach could be used to add step-free access to a lot of stations on the London Underground.

The Design Of The Updated Euston Underground Station

Ian showed this visualisation of the updated Euston Underground station.

At a first look, it appears to be a very similar concept to the entrance to the Underground in front of St. Pancras station.

Click on the image to show it large and you can pick out the following.

  • West is to the left and East is right.
  • Much of the construction appears to replace the original car park and taxi rank.
  • The upper level looks like where passengers enter and leave the station.
  • The subway to Euston Square station and the new Gordon Street entrance joins to the upper level towards the Eastern end.
  • There is grade access between the upper level and the High Speed Two concourse.
  • There are lots of escalators to travel between levels. The square orange columns could be lift towers.
  • The lower level is the Interchange/Ticket Hall level.
  • The lower level is not much higher than the Charing Cross branch of the Northern Line.
  • The design seems to make clever use of levels to make changing easier.
  • The access between the lower level and the Charing Cross branch of the Northern Line at the Western end of the station, appears to be comprehensive and step-free.
  • The access between the lower level and the Victoria Line and the Bank branch of the Northern Line, appears to use the current route, which will probably be upgraded to be fully step-free.

This second image shows the design from above the platforms of the convention section of Euston station.

Click on the image to show it large and you can pick out the following.

  • The complicated passages, escalators and lifts of the existing four platforms serving the Bank branch of the Northern Line and the Victoria Line.
  • The cross passage connecting these lines to the platforms of the Charing Cross branch of the Northern Line.
  • The two up and two down escalators leading to the existing ticket hall.
  • The Charing Cross branch of the Northern Line curving in and away from the station. See the earlier map of the Underground lines.
  • The eleven High Speed platforms on the West side of the station.
  • The thirteen Classic platforms on the East side of the station.
  • The new Northern entrance to the Underground between the two sets of platforms. How convenient!
  • There appears to be a wide passage between the Northern and Southern entrances, with connections to the lines branching off.
  • The subway to the new Gordon Street entrance is shown at the top of the image.

The design seems to have separated access to the two branches of the Northern line, by creating a new high-capacity route to the Charing Cross branch.

I also think, that the design allows the station to be built without disrupting passengers using the Underground and the current Euston station.

  • A large hole for the station can be excavated, without touching existing access.
  • It could then be fitted out section by section.
  • Once the new access to the Charing Cross branch of the Northern Line is complete, the current access to the Northern and Victoria Lines can be refurbished.

Arriving At Euston

Imagine you are a passenger arriving from the North, who knows the Underground line, you need to take, you would then enter the Underground station using the new Northern entrance.

  • For the Bank branch of the Northern Line or the Victoria Line, you would go through the existing ticket hall and down the escalators, much as you do now! Except that you’d enter the ticket hall on the other side from the East side of the passageway connecting the two entrances. New lifts appear to be shown.
  • For the Charing Cross branch of the Northern Line, you would take the passages, lifts and escalators on the West side of the passageway connecting the two entrances.
  • If you wanted the sub-surface lines, you would just keep going and take the new subway, which connects to the Eastern ends of the platforms at Euston Square station.

It will certainly do me fine, if I arrive at Euston, as I’ll walk through the subway and get in the front of any Eastbound train for Moorgate station, where being in the front is convenient for the exit and the nearby bus stop to my home.

This route will surely be one of the ways arriving passengers at Euston will get Crossrail to Abbey Wood, Canary Wharf and Shenfield stations. In Crossrail – Northern – Northern City Interchange At Moorgate Station, I show some visualisations of Moorgate station and the connectivity.

Conclusion

I certainly think, that the new Underground station is a good design.

 

May 6, 2020 Posted by | Transport/Travel | , , , , , , , | 6 Comments

Should A Mega-Station Be Created At Kings Cross-St. Pancras-Euston?

The three important stations of Kings Cross, St. Pancras and Euston sit like three isolated islands on Euston Road.

Kings Cross Station

Kings Cross station was extended and refurbished in 2012 and is the most modern of the three, with a well-designed square in front of the station.

Kings Cross serves as a terminus for East Coast Main Line and some Cambridge services.

Underground

Kings Cross has connections to the following Underground lines at Kings Cross St. Pancras tube station.

  • Circle, Hammersmith and City and Metropolitan.
  • Northern
  • Piccadilly
  • Victoria

On the whole, the connections to the Underground are generally good, but crowded.

Buses

If you want to go East connectivity is good, but when taking a bus to the West or South, finding the stop can be difficult.

Taxis

The taxi rank at Kings Cross generally works well, as it was reconfigured when the station was updated.

Summing Up Kings Cross Station

Kings Cross has a lot of space both inside and outside and using the station can be an easy process compared to many.

St. Pancras Station

St. Pancras station was rebuilt and extended for Eurostar and Southeastern Highspeed services in 2007.

I always describe St, Pancras as a Fur-Coat-And-No-Knickers station.

It may look spectacular, but it wasn’t designed for passengers or staff, due to the dreadful connectivity between the various services at the station.

  • Continental
  • Midland Main Line
  • Southeastern Highspeed
  • Thameslink

With all these services set to expand, I have a feeling that St. Pancras faces a capacity problem.

Underground

To further complicate matters, it’s a often a long walk to the Underground line you need, as these were designed to serve Kings Cross.

  • Circle, Hammersmith and City and Metropolitan.
  • Northern
  • Piccadilly
  • Victoria

There is a ticket hall at the front of the station, but it’s often very crowded with large numbers of Eurostar passengers queuing for tickets.

Buses

It’s a walk to Kings Cross in most cases unless you can find a way across the busy Euston Road.

Taxis

I always walk to Kings Cross, as like most passenger facilities at St. Pnncras, the taxi rank wasn’t well-designed.

Summing Up St. Pancras

St. Pancras doesn’t have the space inside or outside that Kings Cross has and often feels cramped with every seat taken.

With the increase in all services expected in the next few years, passengers should think hard about how they can avoid the station,

Euston Station

Euston station is going to be rebuilt in the next few years for HS2.

Currently, it serves as a terminus for West Coast Main Line and a few suburban services.

Underground

The Underground at Euston is a mess with Euston tube station handling the following lines.

  • Both branches of the Northern
  • Victoria

Round the corner is the cramped Euston Square station which handles the Circle, Hammersmith and City and Metropolitan Lines.

Neither station is fully step-free and the Underground connection will need expansion for HS2.

Buses

Euston has a good bus station if you’re going East, but going West means crossing the busy Euston Road.

Taxis

Euston has an underground taxi rank, that seems to work well.

Summing Up Euston Station

Space is at a premium in Euston station and the Underground connections need urgent improvement.

Crossrail 2

Crossrail 2 is being put forward  as the project that will sort out the problems of the three stations on the Euston Road.

A mega station is to be built called Euston St. Pancras, which will serve all three stations.

But Euston and St. Pancras need extra capacity in connecting services now, not in the early 2030s!

Existing Lines

This map from carto.metro.free.fr shows the current Underground Lines at the three stations.

Can these lines be improved to help solve the capacity problems?

Victoria Line

If you want an example of the quality of the engineers working on the London Underground, you only have to look at the Victoria Line.

Fifty years old next year, the line was built on the cheap, but with superb automatic systems and some clever station layouts and now every year, more trains seem to be squeezed down its pair of tunnels. Currently, the frequency of trains is thirty-six trains per hour (tph) along its whole length.

As the Victoria Line calls at all three stations, any improvements to Dear Old Vicky, like step-free access at Euston, will help.

Northern Line

The Northern Line has three major projects underway.

  • The extension to Battersea
  • The upgrading of Camden Town station.
  • The upgrading of Bank station

When these are complete around 2024, it will be possible to split the line into two separate lines each handling 36 tph.

But more trains will be needed.

Piccadilly Line

The major upgrade for the Piccadilly Line will be new trains, which should arrive from 2022, which will bring a double-digit increase in capacity.

It should also be noted that the frequency in the core is only twenty-one tph, so upwards of thorty tph must be an objectve.

Unlike the Northern And Victoria Lines, the Piccadilly Line doesn’t call at Euston station.

Circle, Hammersmith and City and Metropolitan Lines

The Circle, Hammersmith and City and Metropolitan Lines are being upgraded. This is said on Wikipedia.

Together with the introduction of S Stock trains, the track, electrical supply and signalling systems are being upgraded in a programme planned to increase peak-hour capacity on the Circle and Hammersmith & City lines by 65 per cent by the end of 2018. A single control room for the sub-surface railway is to be established in Hammersmith and an automatic train control (ATC) system will replace signalling equipment installed from the 1940s. The cross-London Crossrail line, planned to open in 2018, is expected to reduce crowding between Paddington and Whitechapel.

This should result in a large increase in capacity between Baker Street and Liverpool Street.

 

Crossrail

Although Crossrail doesn’t fully open until December 2019, and doesn’t even call at Kings Cross, St.Pancras and Euston stations, the new line will have an effect on passengers travelling to the three stations.

  • In my quote  from Wikipedia, it says that Crossrail is expected to reduce crowding between Paddington and Whitechapel.
  • Crossrail is expected to have a link with HS2 at Old Oak Common station.
  • Crossrail may be extended up the West Coast Main Line.

The latter two points would allow passengers to bypass Euston.

Thameslink

Thameslink when it is running fully at the design frequency of 24 tph will certainly have effects on passenger traffic.

But it is difficult to say what they will be.

Difficult Interchanges

If you look at the interchanges between the various lines, in my opinion, the following are the more difficult interchanges.

  • Euston Square tube station to Euston station.
  • Euston station to St. Pancras station.
  • Victoria Line to Thameslink at St. Pancras station.
  • Circle, Hammersmith and City and Metropolitan Lines ro Thameslink at St. Pancras station.
  • Euston Square tube station to Northern Line at Euston station.

In addition Euston Square and Euston stations are not step-free.

Transport for London probably know the improvements that would offer the most benefit.

Euston Square Station And Euston Station

The poor connectivity between Euston Square tube station and Euston station, is a major problem.

Sort this bad connectivity, when Euston station is rebuilt for HS2 and world’s oldest underground railway, dating from 1863, will be providing a high-frequency service to the UK’s premier high-speed railway.

Euston Road

Euston Road, which can be very busy, is a major problem for passengers needing to cross to perhaps use buses going to the West.

The experience of using the stations could be improved for a proportion of travellers, if crossing the road was easier.

Should A Mega-Station Be Created At Kings Cross-St. Pancras-Euston?

I’ll return to the original question I asked.

  • If Crossrail 2 is built, there will obviously be a mega station at Euston St. Pancras.
  • But I believe that all the other improvements that will happen before HS2 opens may well be enough to cope with the extra capacity needed for a few years.

Obviously though, any improvements must not compromise the building of Crossrail 2’s mega-station.

Conclusion

I believe it is possible to improve connectivity to the three major stations of King Cross, St. Pancras and Euston, by doing the following.

  • Improving the frequency and capacity on the various Underground lines serving the three stations.
  • Splitting the Northern Line into two separate lines.
  • Improving the links between the existing Nation Rail and Underground Lines.
  • Integrating Euston Square station into Euston station, when Euston is rebuilt for HS2.
  • Improving the crossing of Euston Road on foot.

In some ways the last-but-one point is the most important, as it cures the worst interchange.

 

 

 

 

 

September 29, 2017 Posted by | Transport/Travel | , , , , , , , | 5 Comments

17 Tube Stations That Face Chronic Overcrowding If Crossrail 2 Is Stopped

The title of this post is the same as that of an article in today’s Standard.

This is the first two paragraphs.

Hundreds of thousands more Londoners will suffer chronic overcrowding on the Tube if Crossrail 2 does not go ahead, it was claimed today.

Transport for London released a list of 17 Underground stations that could buckle under the strain of too many commuters within a few years.

It then lists the stations.

  • Euston
  • King’s Cross St. Pancras
  • Liverpool Street
  • London Bridge
  • Victoria
  • Waterloo
  • Finsbury Park
  • Stockwell
  • Stratford
  • Oxford Circus
  • Highbury & Islington
  • Clapham Common
  • Clapham North
  • Clapham South
  • Holborn
  • Warren Street
  • Leicester Square

It then quotes Caroline Pidgeon, who obtained the list, as follows.

Overcrowding on the Underground is already a daily battle, with many passengers facing regular delays to simply get through barriers at stations.

Unless Crossrail 2 is built these delays will increasingly build up until drastic measures are necessary at 17 key Tube stations, not to mention Clapham Junction railway station.

“Planning ahead for Crossrail 2 is not an optional extra for London’s transport network but of vital importance to keep London moving.

She has certainly highlighted a serious problem.

Call For Crossrail 2

Two years ago to the day, I wrote a post called Call For Crossrail 2 in response to a letter in The Times, from a wide cross section of business leaders calling for a start to be made on the line.

In the post, I talked about improving various stations, just by building Crossrail 2, so in the following notes on the list of crowded stations, I will refer to this post several times in the following.

Euston

Euston tube station is a particular problem in that in the next decade or so, the following will or could happen.

Hopefully, the rebuilding for whichever comes first of  HS2 or Crossrail 2, will make provision for even the most fanciful of expansions.

One Transport for London engineer told me that one of the main reasons for building HS2 and terminating it at Euston, is to be able to sort out the dreadful Euston tube station.

Kings Cross St. Pancras

Kings Cross St. Pancras tube station had a pretty good makeover around the time of the 2012 London Olympics, but it does suffer congestion and travellers have to walk long distances.

The Wikipedia entry for Kings Cross St. Pancras tube station has a section for Crossrail 2. This is said.

Since 1991, a route for a potential Crossrail 2 has been safeguarded, including a connection at King’s Cross St Pancras and Euston, forming the station Euston King’s Cross St Pancras. The proposed scheme would offer a second rail link between King’s Cross and Victoria in addition to the Victoria line. The locations for any new stations on the route will depend on the loading gauge of the final scheme. In the 2007 safeguarded route, the next stations would be Tottenham Court Road and Angel.

There is also a proposal to reopen the closed York Road tube station. In the Wikipedia entry for York Road station under Proposed Reopening, this is said.

One of London’s largest redevelopment projects, King’s Cross Central, began construction in 2008 across the road from the station. Islington council and Transport for London commissioned a study in 2005 to consider the possible reopening of the station. At the same time, however, it was recognised that other transport priorities reduced the likelihood of such a project moving forward in the near future. The site would need extensive overhauls to bring the station up to modern day standards, at a cost estimated at £21 million in 2005. Local political groups have been keen to see the station reopened in order to reduce passenger congestion at King’s Cross St. Pancras and to encourage development in the surrounding community. The Islington Liberal Democrats advocated the reopening of the station in their 2006 local election manifesto, and at least one candidate for the Islington Conservative Party similarly campaigned for the station to be reopened. However, to date, the reopening proposal has not been taken forward.

I wonder if York Road tube station will ever be reopened.

Liverpool Street

The Liverpool Street station complex will be even bigger and busier after Crossrail opens.

The main difference will be that the current Shenfield Metro will now disappear into the ground at Stratford and go under Central London to Heathrow and Reading.

Crossrail 2 will effectively channel the Lea Valley services, that current go into Liverpool Street station under London to emerge in the Wimbledon area.

Effectively, Crossrail and Crossrail 2 major effect on Liverpool Street station are to free up capacity in both tracks and platforms, thuis allowing more longer distance services to use the station.

London Bridge

London Bridge station is being rebuilt and expanded, but little seems to be planned for London Bridge tube station to cope with more passengers.

In Call For Crossrail 2, I said this about Crossrail 2 and the Northern Line.

Crossrail 2 will have interchanges with the Northern Line at Angel, Kings Cross St. Pancras, Euston, Tottenham Court Road, Tooting Broadway and possibly Clapham Junction. So it looks like that Crossrail 2 will certainly make journeys easier for users of the Northern Line.

This should mean that travellers on the Northern Line will be able to avoid a congested London Bridge tube station.

Victoria

Victoria tube station is being extended and rebuilt, which should result in sufficient capacity for more than a few years.

In Call For Crossrail 2, I said this about Crossrail 2 and the Victoria Line.

Crossrail 2 will effectively by-pass the central part of the Victoria Line as the two lines connect at Tottenham Hale, Seven Sisters, Kings Cross, Euston and Victoria.

This should take some of the pressure from Victoria tube station.

Waterloo

Waterloo tube station is a very busy tube station, as it has to cope with all the passengers using Waterloo station.

Crossrail 2 will allow passengers to bypass Waterloo, when travelling to and from Central London.

However, three major improvements will be delivered this year.

  • The old Eurostar platforms are being brought back into use.
  • Extra capacity is being added to the Underground station.
  • I also think that when they have completed the improvements at the Bank end of the Waterloo and City Line. 
  • Will improvements follow at the Waterloo end?

I think Waterloo shouldn’t be judged until the current round of work is completed.

Finsbury Park

Finsbury Park station is a station that suffered badly when the Victoria Line was tunnelled through in the 1960s.

Lifts are being installed, but extra services will be added.

  • Thameslink will call regularly at the station.
  • The services on the Northern City Line will become the Great Northern Metro with an increased frequency.

Crossrail 2 will provide relief for Finsbury Park, as it provides a by-pass for the Victoria Line.

But the station needs to have quite a bit of rebuilding.

Stockwell

Stockwell tube station is where the Victoria and Northern Lines meet South of Victoria.

This map from carto.metro.free.fr shows the lines at Stockwell station.

I’m not sure how Crossrail 2 helps here, but I suspect Transport for London hope that the new line will divert passengers away from Stockwell.

Stratford

Stratford station is another station that will be partially bypassed by Crossrail 2.

I do think that after Crossrail opens, that changes will be made at Stratford station to perhaps move some Liverpool Street services to Stansted and Cambridge.

This would bring more services to some not very busy platforms.

In West Anglia Route Improvement – The High Meads Loop, I described how it might all work.

This map from carto.metro.free.fr shows the lines in this area.

Trains from Cambridge and Stansted would arrive at Temple Mills East Junction and would go round the High Meads Loop dropping and picking up passengers in Platforms 11 and 12 bwfore returning North.

An extra platform could even be added to serve services in Stratford International station.

The tunnels under the platforms at Stratford station would probably need improvement, but who knows how Eastenders will duck and dive after Crossrail opens.

As an example, passengers from Shenfield to Canary Wharf will probably use the cross-platform change at Whitechapel station, rather than pick up the Jubilee Line or the DLR at Stratford.

Oxford Circus

Oxford Circus tube station has needed improvement for years.

Crossrail will give some relief, as there will be new additional entrances to Tottenham Court Road and Bond Street stations closer to Oxford Circus.

I did look at what might happen in What Will The Elizabeth Line Do For Oxford Street?.

I came to this conclusion about Crossrail 2 and Oxford Street.

Crossrail 2 has just one interchange in the Oxford Street area at Tottenham Court Road station.

I would be very surprised in that in the massive rebuilding of the current station for Crossrail, that provision hasn’t been made to connect to Crossrail 2.

There have been surface issues around the station concerned with Crossrail 2, but given good planning of the project, I feel that the building of Crossrail 2 would only effect the area in a similar way to the replacement of a major block on Oxford Street.

Crossrail 2 will have two major effects.

  • It will bring large numbers of visitors to the Oxford Street area.
  • Just as Crossrail and the Central Line will work as a high-capacity pair, it will work closely with the Victoria Line to relieve that line.

This leads me to the conclusion, that the wider Oxford Street area needs to be and will be pedestrianised.

In some ways preparation for the pedestrianisation has already started by reorganising the buses.

Oxford Circus tube station is also high on Transport for London’s improvement list.

This map from carto.metro,free.fr shows the lines through the station.

I suspect that if developers were interested in rebuilding any of the buildings on the South side of Oxford Street or perhaps even around the BBC to the North, that there could be arm-twisting and deal-making to sneak new entrances into Oxford Circus tube station.

Highbury & Islington

Highbury & Islington station, is one of my local ones and it is getting some much-needed improvement.

  • The Northern City Line will be getting frequent new Class 717 trains to create the Great Northern Metro.
  • Highbury Corner will be remodelled to improve pedestrian access to the station.
  • Bus and taxi access is being improved..

But nothing has been announced about improving the chronic access to the two deep-level lines at the station.

Speaking to staff at the station, they feel that a solution is possible, using the second entrance on the other side of the road.

In some ways the Great Northern Metro with its cross-platform interchange with the Victoria Line could be the saviour of this station, as it gives direct access to the City and to Crossrail at Moorgate station.

One of London’s forgotten lines could be riding to the rescue.

Clapham Common

Clapham Common tube station is one of my least favourite. This picture shows why.

It’s downright dangerous now, so when the Northern Line frequency is increased will the station cope?

Clapham North

Clapham North tube station is another dangerous island platform.

But at least the station has escalators.

In A Journey Round The Clapham Stations, a post I wrote in December 2015, I said this.

Having seen Clapham North and Clapham Common stations today, I do wonder if a diversion could be dug as at Angel, Bank and London Bridge, to create safe new stations. This new tunnel could surely be part of the works to add step-free access to one or both stations and connect the tunnels to Clapham High Street station.

What with the Northern Line Extension to Battersea, the rebuilding of Bank and Camden Town stations and all the resignalling of the past few years, the Northern Line could at last be fulfilling its potential.

This could go a long way to  sorting the problem of the Clapham stations.

Clapham South

Clapham South tube station is not as bad as the other two Clapham stations discussed earlier.

Crossrail 2 may reduce the level of overcrowding on the Northern Line trains through the three Clapham stations, as passengers could change at Balham or Tooting Broadway stations to and from the new high-capacity line.

However, nothing short of some serious building work will solve the island platform problems at Clapham Common and Clapham North stations.

Holborn

Holborn tube station is very busy, but is one that could benefit from Crossrail, due to that line’s relationship with the Cerntral Line.

Crossrail 2 will certainly benefit the station, as it will relieve the pressure on the Piccadilly Line.

But Transport for London have published plans to add a second entrance and full step-free access. This is a 3-Dview of the plans.

Note the second entrance will be in Procter Street.

The only problem is that it could be 2021 before a decision is made.

However as a Piccadilly Line station, Holborn will benefit from the New Tube For London, before the upgrade.

Warren Street

Warren Street tube station is another Central London station on the Victoria Line, that could benefit from Crossrail 2’s duplication of the Victoria Line.

Leicester Square

Leicester Square tube station is just one stop on the Northern Line from the major new interchange of Tottenham Court Road station, which will be served by both Crossrail and Crossrail 2.

The station has needed more capacity since I first used it in the 1950s.

It needs step-free access.

This map from carto.metro.free.fr shows the lines around Leicester Square station.

There is quite a tight knot of stations, of which only Tottenham Court Road has both escalators and lifts, although Goodge Street and Covent Garden have lifts only.

Leicester Square is an unusual station in that both the Northern and Piccadilly Lines are accessed by short passages and a short staircase from a fair-sized lobby at the bottom of a long set of escalators.

Clapham Junction

Clapham Junction station is the only non-Underground station in the seventeen stations named, where overcrowding could become chronic if Crossrail 2 is not built.

It is the busiest station by number of trains in Europe, so it must be difficult to keep on top of increasing numbers of passengers.

In the Wikipedia entry for the station under Future Proposals, this is said.

In 2007 the alignment of one of the two variants of Crossrail 2, that via the station rather than Putney and Wimbledon, was safeguarded. The Department for Transport and Transport for London continue to discuss proposal for a Clapham Junction Northern Line extension and its London Underground alignment has been legally reserved through Battersea Park, and would connect Clapham Junction to the London Underground for the first time.

Government and Network Rail funding for in the early 2010s of £50 million of improvements was granted. This comprised an upgrade to the main interchange: new entrances and more retail.

Surely something needs to be done, if Crossrail 2 is not built.

My proposals would include.

  • Developing the West London Line services.
  • Extending the Northern Line from Battersea Power Station station.
  • Improving the frequency of trains into Waterloo.
  • Make the station subway step-free.

There may be a need for more platforms, but the London Overground found this difficult.

This map from carto.metro.free.fr shows the platforms in the station.

Simple it isn’t!

Conclusions

It surprised me how many of these stations will need substantial building work to cure the overcrowding.

Note.

  1. Every Victoria Line station between Oxford Circus and Finsbury Park is on the list.
  2. Four Northern Line stations between Stockwell to Clapham South is on the list.
  3. I think this shows how the designers of the Northern and Victoria Lines didn’t expect the traffic the lines now handle.

But overall, I think it shows how when you design a station, you don’t cut corners.

I also think to blame all these problems on the uncertainty about Crossrail 2, is probably a bit strong.

Consider.

  • Liverpool Street will probably have enough capacity when Crossrail opens, especially as the station will incorporate Moorgate and be substantially step-free.
  • The new London Bridge effectively adds high-frequency rail lines to Blackfriars, Cannon Street, Charing Cross and St. Pancras and when Thameslink and Southeastern are fully developed, the station will cope.
  • Victoria shouldn’t be judged until the current upgrade is complete.
  • Waterloo shouldn’t be judged until the current upgrade is complete.
  • Finsbury Park shouldn’t be judged until the current upgrade is complete.
  • Stratford will probably have enough capacity when Crossrail  opens, especially as the station is substantially step-free.
  • Oxford Circus should see improvement when Crossrail opens, especially as there’ll be new step-free entrances to Tottenham Court Road and Bond Street, that will be closer to Oxford Circus, than the current stations.
  • Highbury & Islington should see marginal improvement, when the Northern City Line is updated.

However, nothing short of substantial construction will sort Euston, Clapham Common, Clapham North, Holborn, Leicester Square and Clapham Junction.

 

 

 

 

July 18, 2017 Posted by | Transport/Travel | , , , , , , , , , , , , , , , , | 1 Comment